• 제목/요약/키워드: earthwork allocation planning

검색결과 4건 처리시간 0.019초

최적 토량배분 계획을 위한 의사결정 모델 (Decision Making Model for Optimal Earthwork Allocation Planning)

  • 곽한성;서병욱;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2016
  • This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

  • PDF

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

분산인공지능 기반의 토공 시스템 개발 (Development of a DAI-Based Earthwork System)

  • 김성근
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.180-187
    • /
    • 2002
  • 최근 건설장비 및 시스템의 지능을 높이기 위한 요구가 증대되고 있다. 특히 건설산업에 영향력을 미칠 가능성 큰 반자동 및 자동화 시스템은 지속적으로 변화하는 환경내에서 임무를 스스로 수행하기 위하여 필요한 지시와 계획을 생성하기 위하여 인공지능 접근법이 필요하다. 본 논문에서 인텔리젼트 토공시스템을 위한 프레임웍을 제시하고자 한다. 인텔리젼트 토공시스템은 자동으로 건설장비를 위한 계획을 생성하고, 건설장비간에 협력을 할 수 있는 방법을 제시한다. 인텔리젼트 토공시스템의 구조, 제어방식, 계획 및 자원배당 방법을 본 논문에서 제시하고자 한다.

  • PDF

저탄소 토공을 위한 솔리드 모델링 및 건설장비 플릿관리 방법론 (An Approach for Solid Modeling and Equipment Fleet Management Towards Low-Carbon Earthwork)

  • 김성근;김규연;박주현
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.501-514
    • /
    • 2015
  • 토공작업은 모든 종류의 토목공사에 기본이 되는 공종으로 공기, 공사비와 생산성에 영향을 미치는 요소이다. 토공은 그룹으로 형성된 다수의 건설장비들이 필요한 기계화 작업이며 건설장비로 인하여 많은 연료를 소비하는 작업이다. 그러나 일반적으로 토공작업은 건설장비 운전자의 경험과 직관에 의하여 수행되기 때문에 낮은 생산성, 높은 연료사용량 및 탄소를 많이 배출시킬 수 있는 문제점을 갖고 있다. 최근 연구에 의하면 이러한 문제점의 해결책의 하나로 건설장비 플릿관리 시스템이 제안되고 있다. 건설장비 플릿관리 시스템은 효과적인 토공계획, 최적의 건설장비 할당, 효율적인 건설장비 운영, 빠른 정보교환 등과 같은 기능을 수행한다. 본 연구에서는 건설장비 플릿관리 시스템 구축시 필요한 주요 방법론을 제시하는 것을 목적으로 하고 있다. 토공작업을 위한 3D 솔리드 파라메트릭 모델 형성, 옥트리를 이용한 토량배분, 건설장비 플릿구성 및 운영 방법론을 제시하였다. 건설장비 플릿관리 시스템의 효용성을 건설장비 가동률, 연료사용량, 이산화탄소 배출량 측면에서 검증해 보기 위하여 시뮬레이션을 실시하였다.