• Title/Summary/Keyword: duration

Search Result 14,220, Processing Time 0.034 seconds

Segment and Word Duration Produced by Preschool Children (학령전기 아동의 분절음 및 단어 길이)

  • Kang, Eunyeong
    • Journal of The Korean Society of Integrative Medicine
    • /
    • v.8 no.4
    • /
    • pp.291-305
    • /
    • 2020
  • Purpose : The duration of speech segments reflects children's speech motor development. The purpose of this study was to determine whether segmental sound and word duration varies by age among preschool children. Methods : A total of 60 children aged 4~5 years participated in this study. Participants took the picture-naming test to produce single-word speech data. The duration of the consonant at the initial position of the word and the final position of the word, the voice onset time of plosive, the duration of the vowel following the initial consonant, and the duration of the word were measured. Results : As age increased, the duration of the initial consonant, the duration of the word, and the voice onset time decreased significantly. The main effects of age, manner of articulation, and place of articulation on the duration of the initial consonant were significant. The duration of consonants in the nasal sound and plosives and the duration of bilabial and alveolar sound differed significantly between groups. The main effects of age and vocal type on voice onset time were significant. The main effect of age on the duration of the consonant in the final position of word and on the duration of the vowel were not statistically significant. Conclusion : The results of this study showed that the duration of segmental sound and the word were associated with speech development between 4 and 5 years old. Accordingly, duration of the segmental sound and the word may serve as an acoustic cue as they reflect speech development and speech motor control maturity.

Study of Appropriate Meal Duration at an Italian Restaurant (이탈리안 레스토랑의 적절한 Meal Duration 선정에 관한 연구)

  • Cho, Hee-Hee;Kim, Hyun-A;Lee, Kyung-Hee
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.20 no.3
    • /
    • pp.473-480
    • /
    • 2010
  • This study examined the different meal duration expectations and dining characteristics of customers each stage of service (order, cook, check), and investigated the impact of perceived meal duration on customers' satisfaction. The procedures consisted of four phases. During the first phase, the different meal duration expectations and dining characteristics of customers of an Italian restaurant in Seoul were examined by survey at each stage of service. The second phase investigated the impact of perceived meal duration on customer' satisfaction. The third phase compared perceived meal duration and actual meal duration. The last phase suggested appropriate meal duration for maximization of customer' satisfaction. We also examined the effects of meal time (lunch or dinner) on meal duration preferences. Customer satisfaction was decreased with longer perceived meal duration for the order and check stages and too short perceived meal duration for the cook stage. To determine appropriate meal duration for each service stage, the relationship between perceived and actual meal durations was examined. This study confirms that customers dining at restaurants preferred a longer cook time and that a shorter meal duration at dinner decreased satisfaction ratings more when compared to lunch.

A Study on the Development of Reflect Sunshine Duration Meter(I) (반사식 일조계 개발에 관한 연구(I))

  • 이부용;문승의
    • Journal of Environmental Science International
    • /
    • v.4 no.2
    • /
    • pp.117-120
    • /
    • 1995
  • The comparision of sunshine duration meter was carried out on the roof of Korea Meteorological Research Institude by comparing Pyrheliometer(Eppley NIP model) to sunshine duration meter(Reflection type) during from Nov. 8, 1989 to Feb. 19, 1990. In the observation Period, daily mean sunshine duration time difference of Jordan sunshine duration meter was recorded 0.47hour and Reflect sunshine duration meter was recorded 0.39hour. More than one hour time difference was observed 15 cases by Jordan sunshine duration meter and 11 cases by Reflect sunshine duration meter.

  • PDF

Further Issues on the Duration Differences in Vowels due to the Voicing of the Following Stops in English (영어의 유무성 폐쇄음 앞 모음 길이 차이에 대한 몇 가지 문제들)

  • Oh, Eun-Jin
    • Phonetics and Speech Sciences
    • /
    • v.4 no.3
    • /
    • pp.85-92
    • /
    • 2012
  • It is a well-known phenomenon that vowel duration in English is generally longer before a voiced stop than a voiceless one. Past research has postulated that the closure duration of the voiceless stop is generally longer than that of the voiced stop and that the duration of a preceding vowel is determined complementarily by the closure duration of the stop. To shed further light on the phenomenon, this study examined fourteen native speakers of American English who read the monosyllabic words [bVC] (V = [i, ɪ, eɪ, ɛ, æ, ʌ, ɑ], C = [t, d]). First, we found that mean vowel duration was 38 ms longer before the voiced stop than the voiceless (mean duration ratio = 1.24). Second, mean closure duration of the voiced stop was only shorter by 5 ms compared to the voiceless stop (mean duration ratio = 0.97). Therefore, for our subjects, vowel duration was not determined complementarily by the closure duration of the following stop. Third, vowels with longer inherent durations (viz., tense, diphthong, and low vowels) tended to show larger duration ratios in the voiced and voiceless contexts than the vowels with shorter durations (viz., lax vowels). This indicates that the lengthening of inherently shorter vowels before a voiced stop is limited in order to avoid overlapping with longer vowels in the duration range. Fourth, there was no significant gender difference in vowel duration ratios in the contexts of voiced and voiceless stops. Finally, considerable individual differences were found in the vowel and consonant duration ratios.

Dimensionless flow Duration Curve in Natural River (자연하천의 무차원 유황곡선)

  • Park, Sang-Deog
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.1
    • /
    • pp.33-44
    • /
    • 2003
  • Flow duration curves provide a compact summary of streamflow variability. In this study, characteristics of the dimensionless flow duration curve in natural rivers with the unregulated discharge were investigated. An analysis of flow duration characteristics was conducted with discharge data at stage-gauging stations of IHP representative basins and of the major rivers in Korea. Discharge characteristics are dependent on area of watershed. However, flow duration coefficients except drought duration coefficient are independent on that. Abundant flow duration coefficient was constant value. The coefficient of flow duration variability defined in this study as the ratio of the normal stream flow over the drought one is decreased with increasing of the watershed area, which implies that the watershed area affects the drought flow duration variability more than the low flow one. And the coefficient of flow duration variability is increased with the river gradient.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

The Effects of Meal duration on Customers‘ Evaluation of Service Quality and Satisfaction according to Service Stages of Restaurant (레스토랑의 서비스 제공단계별 Meal duration이 고객의 서비스품질 평가 및 고객만족에 미치는 영향)

  • Cho, Me-Hee;Lee, Kyung-Hee
    • Journal of the Korean Society of Food Culture
    • /
    • v.25 no.2
    • /
    • pp.189-197
    • /
    • 2010
  • This study, which took place in an Italian restaurant in Seoul, investigated the impact of meal duration on the evaluation of satisfaction and service quality, according to the service stages (order, cook, check) of a restaurant. Research procedures included two phases: during the first phase, data on expected-perceived meal duration, and service quality and satisfaction were collected by surveys, which were distributed at the restaurant. The second phase investigated the relationships among meal duration, customers' satisfaction, and service quality. T-tests and regression analyses were used to examine relationships between these variables. Results indicate that both failing to meet customers' expected meal duration, as well as the perceived meal duration could negatively impact the satisfaction and evaluation of service quality. The study confirmed that meal duration is indeed related to the responsiveness aspect of service quality. The important aspect of meal duration management is to improve service quality and satisfaction, which can lead to a restaurant's success. Therefore, understanding the relationships among meal duration, satisfaction, and service quality is a part of a good foundation for effective meal duration management.

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

Affecting Discharge of Flood Water in Paddy Field from Selecting Rainfall with Fixed and Unfixed Duration (고정, 임의시간 강우량 선택에 따른 농경지 배수 영향 분석)

  • Hwang, Dong Joo;Kim, Byoung Gyu;Shim, Jwa Keun
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.64-76
    • /
    • 2012
  • Recently, it has been increased disaster of crops and agricultural facilities with climate change such as regional storm, typhoon. However agricultural facilities have unsafe design criteria of improving drainage corresponding to this change. This study has analyzed the impact that inundation area and magnitude of drainage-facility is decided based on fixed- and unfixed-duration precipitation by applying revised design criteria of drainage for climate change. The result was shown that 1-day and 2-days rainfall for 20-years return period has increased about 11.4%, 4.4% respectively by changing fixed- to unfixed duration. And the increase rate of design flood was 15.0%. The result was also shown that Inundation area was enlarged by 6.6% as well as increased inundation duration under same basic condition in designed rainfall between fixed- and unfixed-duration. According to the analysis, it is necessary for pump capacity in unfixed-duration to be increased by 70% for same effect with fixed-duration. Therefore, when computing method of probability precipitation is changed from fixed one to unfixed-duration by applying revised design criteria, there seems to be improving effect in drainage design. Because 1440-minutes rainfall for 20-years return period with unfixed-duration is more effective than 1-day rainfall for 30-years return period with fixed-duration. By applying unfixed-duration rainfall, capacity of drainage facilities need to be expanded to achieve the same effects (Inundation depth & duration) with fixed-duration rainfall. Further study is required for considering each condition of climate, topography and drainage by applying revised design criteria.

  • PDF