• 제목/요약/키워드: drill shaft

검색결과 10건 처리시간 0.009초

전동드릴의 진동특성 및 전파경로 해석 (Vibration Characteristics and Its Propagation Path Analysis of an Electric Drill)

  • 조윤수;김도현;최연선
    • 한국소음진동공학회논문집
    • /
    • 제11권9호
    • /
    • pp.422-430
    • /
    • 2001
  • An electric drill is a handy tool used in a machine shop, which consists of motor, gear, bearing, shaft, and case, i.e., a gear driving system. Low level vibration and noise of the electric drill can bring the assurance of the quality and reliability of the machine. The vibration sources of the electric drill should be investigated for the reduction of the vibration and noise of the system. Through the experiments in laboratory and the various signal processing procedure for the measured vibration and sound signals, the characteristics of the vibration of the electric drill are investigated. And its propagation path is sought using partial coherence function.

  • PDF

전동드릴의 진동특성 및 전파경로 해석 (Vibration Characteristics and its Propagation Path Analysis of an Electric Drill)

  • 김도현;조윤수;최연선
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 춘계학술대회논문집
    • /
    • pp.166-171
    • /
    • 2001
  • An electric drill is a handy tool used in a machine shop, which consists of motor, gear, bearing, shaft, and case, i.e., a gear driving system. Low level vibration and noise of the electric drill can bring the assurance of the quality and reliability of the machine. The vibration sources of the electric drill should be investigated for the reduction of the vibration and noise of the system. Through the experiments in a laboratory and the various signal processing procedure for the measured vibration and sound signals, the characteristics of the vibration and noise of the electric drill are investigated. And its propagation path is sought using partial coherence technique.

  • PDF

구멍가공시 스텝드릴을 이용한 버형성 최소화를 위한 연구 (Minimization of Burr Formation in Drilling with Step Drill)

  • 고성림;김진호
    • 한국정밀공학회지
    • /
    • 제17권10호
    • /
    • pp.132-140
    • /
    • 2000
  • In conventional drilling, burr geometry can be changed according to the variation of drill geometry like point angle, rake angle. Step drilling is proposed to minimize the burr formation in drilling operation. The burr formed in first cutting can be removed in second cutting by the edge in step. The burr formed in second cutting by the edge in step can be minimized according to the change of geometry like, step angle and depth. The mechanism in step drilling is analyzed. Some step drills are applied to drilling the input shaft which is used for vehicle steering. To measure the burr formed in drilling, laser and height gage are used.

  • PDF

현장타설말뚝의 암반 근입부 암판정 사례연구 (Study on Rock classification of Rock Socketed Drilled Shaft)

  • 박완서;유재현;이우철;주용선
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.658-663
    • /
    • 2010
  • Recently the most of deep foundation were socketed into weathered rock or soft rock to carry large foundation loads. The end bearing behavior of piles socketed in rock is generally dependent on the rock mass conditions with discontinuities and rock strength. Therefore, it is very important that the estimating rock classification with relation of TCR, RQD and unpredicted rock condition. In this study, the construction failure example of drilled shaft due to mistaking to estimate the rock classification on penetration were analyzed in site, so we hope to discuss problems of determining the rock socketed length of drilled shaft on construction.

  • PDF

공기베어링의 노즐 형상 변화에 따른 출구면 근방의 유동구조에 대한 수치해석 (Numerical Investigation of Flow Structures near Various Nozzle Exit Geometries of the Air Bearing)

  • 박병호;한용운;박상신
    • 대한기계학회논문집B
    • /
    • 제38권3호
    • /
    • pp.235-242
    • /
    • 2014
  • 공기 베어링의 성능개선을 위하여, 일반적인 급기공 형상(drill shape), 곡면 급기공 형상(matched cube shape) 및 $45^{\circ}C$ 모따기 노즐 출구부(trimmed shape)를 가지는 3가지 형태의 노즐형상에서 급기압을 변화 시켰을 때, 샤프트면 출구압력 특성을 전산유체역학 상용코드를 이용하여 분석하였다. 샤프트면 에서 압력 분포는 노즐 중심부에서 정체점 유동의 영향으로 최대압이 발생하며, 노즐 출구부와 샤프트면 사이의 압력분포는 미세 간극의 영향으로 와류가 형성되어 반경방향으로 국부적인 압력상승 현상이 발생한 후 음압영역이 발생하는 것이 관찰되었다. 또한 이러한 현상은 일반적인 형태의 노즐에서 급기압력비 6.92이상인 경우는 나타나지 않는 것으로 관찰되었다. 급기공 노즐 형상을 matched cubic 곡면으로 변화시켜 샤프트면에서 얻어진 압력 분포는 기존의 노즐과 비교한 결과 순간적인 상승압 구간이 모든 경우에 대하여 존재하였으며 급기압력비 10근처까지 음압구간이 나타나는 것으로 관찰되었다. 또한, 노즐 출구부를 모따기로 변형시켰을 때, 샤프트면에서 최대압력의 영향권이 반경방향으로 확대되었고 음압영역은 나타나지 않는 것으로 관찰되었다. 결과적으로, 급기공 내부의 형상변화보다는 노즐 출구면 외부의 변형이 성능개선에 유리한 것으로 관찰된다.

싱가포르 케이블터널 프로젝트 NS2현장 SCL 터널에서의 숏크리트 라이닝의 변형거동 특성 (Numerical Analysis for Shotcrete Lining at SCL Tunnel in NS2 Transmission Cable Tunnel Project in Singapore)

  • ;김영근
    • 터널과지하공간
    • /
    • 제27권4호
    • /
    • pp.185-194
    • /
    • 2017
  • 본 논문은 싱가포르 케이블 터널NS2 현장 SCL(NATM)터널구간에서 숏크리트 라이닝의 역학적 변형거동을 평가하기 위하여, 터널 막장관찰(Face Mapping)자료에 근거한 암반분류결과와 현장계측을 통한 내공변위결과를 바탕으로 NATM 터널의 공학적 거동 특성을 분석하고자 하였다. 또한 본 현장의 수직구, Adit 터널 및 Enlargement 터널의 NATM 터널 전체를 3차원 모델링하였으며, 시공중 암반분류값에 근거한 암반하중을 산정하여 3차원 유한요소해석을 실시하였으며, 해석결과를 현장계측결과와 비교 검토하였다.

현수교의 지중정착식 앵커리지 설계 (The Design of Rock Anchored Anchorage of Suspension Bridge)

  • 안익균;김경택;박기웅;장학성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.629-640
    • /
    • 2008
  • South anchorage(AN1, Myodo side) of supension bridge between Myodo and Gwangyang is designed as rock anchorage with 36m anchor length using the resistance of rock mass in Myodo. Checking the overall stability of the anchorage, we considered rock joints, bedding planes, fault zones and condition of rock structure in situ by analysis results for photo-lineaments, aerial photograph interpretation and drill-hole logs are considered. This anchorage consists of an access shaft, adit, and the upper and lower concrete bearing plate to introduce pre-stressing force into rock mass.

  • PDF

초단펄스 전해 국부화를 이용한 미세구멍 가공 (Localized Electro-chemical Micro Drilling Using Ultra Short Pulses)

  • 안세현;류시형;최덕기;주종남
    • 한국정밀공학회지
    • /
    • 제20권8호
    • /
    • pp.213-220
    • /
    • 2003
  • By the localization of electro-chemical dissolution region, we succeeded in a few micrometer size hole drilling on stainless steel with the radial machining gap of about 1 ${\mu}{\textrm}{m}$. Tens of nanosecond duration voltage pulses were applied between WC micro-shaft and stainless steel in the 0.1 M $H_2SO_4$ solution. Pt balance electrode was used to drill the high aspect ratio micro-hole without generation of Cr oxide layer on the machined surface. The effects of applied voltage, pulse duration, and pulse period on localization distance were investigated according to machining time. We suggested the taper reduction technique especially brought up on blind-hole machining. High quality micro-holes with 8 ${\mu}m$ diameter with 20 ${\mu}m$ depth and 12 ${\mu}m$ diameter with 100 ${\mu}m$ depth were drilled on 304 stainless steel foil. The various hole shapes were also produced including stepped holes and taper free holes.

암반 정착 대구경 피어기초의 거동특성에 관한 연구 (The Behavior of Large Diameter Rock Socketed Piles)

  • 김태현;김찬국;황의석;이봉열;김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.1245-1250
    • /
    • 2006
  • The rapid growth of the economy recently gas led to increasing social needs for large scaled structures, such as high-rise buildings and long span bridges. In building these large-scaled structures the trend has been to construct foundations beating on or in rock masses in order to ensure stability and serviceability of the structure under several significant loads. However. when designing the drilled shaft foundation socketed in rock masses in Korea, the bearing capacity for the pier used to be determined by using the empirical expression, which depends on the compressive strength of the rock, or presumable bearing capacity recommended on foreign references or manuals. In this study, numerical analyses are used to trace rock-socketed pile behavior and are made alike with pile load test result in field. The result of this numerical analyses study have shown that following factors have a significant influence on the load capacity and settlement of the pier. Significant influence first factor of the geometry of the socket as defined by the length to diameter ratio. Second factor of the modulus of the rock both around the socket and below the base. third factor of the condition of the end of the pier with respect to the removal of drill cuttings and other loose material from the bottom of the socket.

  • PDF

지반절삭 전기에너지를 활용한 회전굴착토크 예측에 관한 연구 (A Study for Predicting Rotational Cutting Torque from Electrical Energy Required for Ground Drilling)

  • 최창호;조진우;이용수;정하익;박용부
    • 한국지반공학회논문집
    • /
    • 제23권7호
    • /
    • pp.57-64
    • /
    • 2007
  • 본 연구는 지반의 회전굴착에 필요한 굴착 토크(torque)를 회전 오거 구동에 소요되는 전기에너지를 활용하여 예측할 수 있는 방법을 제시한다. 지반회전굴착은 선굴착 말뚝 시공, 연약지반 개량을 위한 소일-시멘트 그라우팅(soil-cement grouting), 사전 지반조사 등 지반공학 분야에 흔히 사용되고 있다. 오거를 통한 회전굴착에 소요되는 전기에너지와 회전 토크의 상호 관계를 이해하기 위하여 소형 실내 실험기기를 제작하고 파일럿(pilot)실험을 수행하였다. 실험기기는 직경 $D=5{\sim}10mm$의 일반 드릴 비트를 회전하여 CBR몰드에 다짐 제작된 토사공시체를 굴착할 수 있도록 설계되었다. 드릴 비트는 감속기어를 통하여 19RPM의 정격 속도로 회전하며, 구동 모터는 25Watt 용량의 교류 유도 전동기이다. 드릴 비트로 공시체를 회전 절삭하며 구동 모터에 소요되는 전류의 증가량과 실제 비트에 작용하는 토크(torque)를 측정하였고, 선형 회귀분석을 통하여 전류 증가량과 토르크 증가량의 상호관계를 파악하였다. 구하여진 회귀분석 결과를 활용하여 굴착시 소요되는 전류 증가량으로부터 굴착토크를 예측하여 계측된 토크값과 비교하였다. 비교로부터 굴착에 소요되는 전기력을 활용하여 굴착토크를 예측할 수 있다는 결론을 얻었으며, 이로부터는 굴착 전기력의 분석을 통해 지반의 전단강도 특성을 예측할 수 있음을 증명하고자 하였다.