• 제목/요약/키워드: drainage level

검색결과 464건 처리시간 0.029초

금강하구둑 배수갑문 조작에 의한 상류수역의 수위변동 (Variation of Water Level on the Upstream Gauging Station by Operation of the Drainage Sluice Gate of Geumgang Estuary Dam)

  • 박승기
    • 한국농공학회논문집
    • /
    • 제47권6호
    • /
    • pp.15-24
    • /
    • 2005
  • The normalization on the characteristics of water level change at the upstream gauging station was attempted according to the operation of drainage sluice gate of the Geumgang estuary dam. The characteristics were normalized by the analysis of water level change and by the linear-regression of the water level data measured at the inner station of Geumgang estuary dam and upstream gauging station. The results of normalization may be referred to the management of Geumgang estuary lake, the operation of pumping and drainage stations in the shore of the lake. The mean response time of water level change on Ibpo, Ganggyeong and Gyuam water level station were 39,81 and 160 minutes, when sluice gate was opened respectively. The mean velocity of surface wave, the mean displacement of water level change, the mean time of water level change and the mean rate of water level change varied largely depending on the location of gauging station and the characteristics of stream section of the water level gauging station.

지하수위 예측기법을 활용한 지하댐 운영전략 (Operation Strategy of Groundwater Dam Using Estimation Technique of Groundwater Level)

  • 부성안;신상문;최용선;박재현;정교철;박창근
    • 한국관개배수논문집
    • /
    • 제13권2호
    • /
    • pp.236-245
    • /
    • 2006
  • Among a number of methodologies for developing groundwater supply to overcome drought events reported in the research community, an accurate estimation of the groundwater level is an important initial issue to provide an efficient method for operating groundwater. The primary objective of this paper is to develop an advanced prediction model for the groundwater level in the catchment area of the Ssangcheon groundwater dam using precipitation based period dividing algorithm and response surface methodology (RSM). A numerical example clearly shows that the proposed method can effectively forecast groundwater level in terms of correlation coefficient ($R^2$) in the upstream part of the Ssangcheon groundwater dam.

  • PDF

토마토의 암면과 코이어 자루재배시 일사량제어법과 배액전극제어법에 의한 급액제어 방법 비교 (Comparison on Irrigation Management Methods by Integrated Solar Radiation and Drainage Level Sensor in Rockwool and Coir Bag Culture for Tomato)

  • 김성은;심상연;김영식
    • 생물환경조절학회지
    • /
    • 제19권1호
    • /
    • pp.12-18
    • /
    • 2010
  • 토마토를 대상으로 암면과 코이어를 사용한 자루재배에서 일사량제어와 배액전극제어법의 급액제어 능력을 실험한 결과, 배지 종류에 관계없이 일사량제어법에 비해 배액전극제어법에서 배지함수량과 배액량이 안정 적이었다. 총수확량과 상품과량은 배액전극제어법에서 많았으며, 동일한 급액제어 처리 안에서는 배지간 차이는 없었다. 당도는 급액제어 방법의 차이보다는 배지의 종류에 영향을 많이 받았다. 배액전극제어법은 펄라이트뿐만 아니라 암면과 코이어배지에서도 범용적으로 일사량제어법에 비해 유리한 것으로 나타났다.

간척지 논 침수 원인 조사와 방재 대책 수립 (Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields)

  • 정주홍;윤광식;최수명;윤석군;고영배;김영택
    • 한국관개배수논문집
    • /
    • 제17권2호
    • /
    • pp.105-114
    • /
    • 2010
  • Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

  • PDF

실시간 자료지향형 예측을 활용한 내배수 시설 운영기법 연구 (A Study on Real-Time Operation Method of Urban Drainage System using Data-Driven Estimation)

  • 손아롱;김병현;한건연
    • 대한토목학회논문집
    • /
    • 제37권6호
    • /
    • pp.949-963
    • /
    • 2017
  • 본 연구는 도시홍수 피해저감을 위한 비구조적 대책의 일환으로 배수펌프장의 효율적인 운영방안을 제시하고자 한다. 배수펌프장 내의 수위를 뉴로-퍼지모형을 통하여 예측하고 예측되는 내수위에 따라 유전자 알고리즘 기법을 적용하여 배수펌프장의 운영룰을 결정하고자 한다. 뉴로-퍼지모형 구축시 배수구역의 지형적 특성을 반영하기 위하여 공간적 매개변수를 고려한 GeoANFIS모형을 개발하였고 배수펌프장 내 최고수위를 저하시키면서 반복적인 정지와 운영이 발생하지 않도록 벌칙유형의 유전자 알고리즘을 적용하였다. 마포 배수구역 내 5개의 배수펌프장(마포, 합정, 상수, 봉인, 당인)에 대하여 개발 모형의 적용성을 검증하였다. 이러한 운영룰의 개발로 효과적으로 내배수 시설을 운영할 수 있을 것으로 판단된다.

Effects of the borehole drainage for roof aquifer on local stress in underground mining

  • Shao, Jianli;Zhang, Qi;Zhang, Wenquan;Wang, Zaiyong;Wu, Xintao
    • Geomechanics and Engineering
    • /
    • 제24권5호
    • /
    • pp.479-490
    • /
    • 2021
  • Pre-drainage of groundwater in the roof aquifer by boreholes is the main method for prevention of roof water disaster, and the drop in the water level during the drainage leads to the variation of the local stress in the overlying strata. Based on a multitude of boreholes for groundwater drainage from aquifer above the 1303 mining face of Longyun Coal Mine, theoretical analysis and numerical simulation are used to investigate the local stress variation in the process of borehole drainage. The results show that due to the drop in the water level of the roof aquifer during the drainage, the stress around the borehole gradually evolved. From the center of the borehole to the outside, a stress-relaxed zone, a stress-elevated zone, and a stress-recovered zone are sequentially formed. Along with the expansion of drainage influence, the stress peak in the stress-elevated zone also moves to the outside. When the radius of influence develops to the maximum, the stress peak position no longer moves outward. When the coal mining face advances to the drainage influence range, the abutment pressure in front of the mining face is superimposed with the high local stress around the borehole, which increases the risk of stress concentration. The present study provides a reference for the stress concentration caused by borehole drainage, which can be potentially utilized in the optimal arrangement of drainage boreholes in underground mining.

수용개작을 통한 뇌실외배액 간호 실무지침 개발 (Development of Nursing Practice Guideline for External Ventricular Drainage by Adaptation Process)

  • 정원경;이영희
    • 임상간호연구
    • /
    • 제22권3호
    • /
    • pp.294-304
    • /
    • 2016
  • Purpose: This study was done to develop an evidence-based external ventricular drainage (EVD) nursing practice guideline in order to provide standardized nursing and prevent EVD related complications. Methods: We used the standardized methodology for nursing practice guideline adaptation developed by Korean Hospital Nurses Association for the guideline adaptation process in this study. Results: The newly developed EVD nursing practice guideline was adapted to the American Association of Neuroscience Nurses (AANN)'s clinical practice guideline which is 'Care of the patient undergoing intra-cranial pressure monitoring/external ventricular drainage of lumbar drainage.' There were 61 recommendations documented in the preliminary guideline all evaluated by 9 experts based on acceptability and applicability. The final practice guideline was composed of 3 domains with 57 recommendations. The three domains of nursing were the insertion, maintenance, and removal of the EVD. The number of recommendations in each domain was 8 in EVD insertions, 39 in EVD maintenance, and 10 in EVD removals. Of the 57 recommendations 3.5% were level 1, 31.5% were level 2, and 65% were level 3. Conclusion: The standardized practice guideline can improve nurses' performance and accuracy. It can also be used as the foundation for effective communication between all medical staff.

배수관의 구조소음과 소음저감에 관한 연구 (A Study on the Structure-borne Noise and Noise Reduction of Drainage Pipes)

  • 류봉조;이규섭
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2009년도 춘계학술대회 논문집
    • /
    • pp.194-202
    • /
    • 2009
  • The paper deals with the countermeasure against structure-borne noise source and noise reduction of drainage pipes. Recently, the problem the problem of the toilet drain noise of an apartment house has been become the center of public interest and a target of public grievance. Generally, the drain noise of a toilet in the apartment house has a pink noise characteristics below 2 kHz level, and therefore, the structure-borne noise has a great effect on the entire drain noise. In order to measure the transmission loss for various kinds of pipes such as PVC pipes, cast-iron pipes and newly developed AS pipes, experimental setup containing speakers as a sound source was designed and manufactured. The second-stories measurement room with a small size anechoic chamber was constructed and the noise level for different kinds of drainage pipes was measured by the sound level meter. Through the experimental research in the study, noise reduction capacity for various kinds of drainage pipes and countermeasures against structure-borne noise source are demonstrated.

  • PDF

지하수위, 토양수분함량 및 수질변화를 활용한 습윤화 지역의 배수시설 효과 평가 (Analysis of the Effects of Drainage Systems in Wetlands Based on Changes in Groundwater Level, Soil Moisture Content, and Water Quality)

  • 김창훈;류정아;김덕근;김규범
    • 지질공학
    • /
    • 제26권2호
    • /
    • pp.251-260
    • /
    • 2016
  • 댐 저수지의 높은 수위와 댐 외부 지역의 지하수위간의 수두 차이는 지질 방벽을 통한 물의 흐름을 발생시킨다. 이로 인하여 발생한 유역 외 지역의 얕은 지하수위는 토양 습윤화를 초래하여 토지이용에 제약을 가져온다. 본 연구에서는 습윤화가 진행된 소유역내에 지하 1~1.5 m 심도에서 유공관 등의 배수시설을 설치한 후 그 효과를 분석하였다. 배수시설 설치 이전에 비하여 지하수 관측정에서의 수위는 1 m 이상 하강한 것으로 나타났으며, 저수지와 인접한 골짜기 상류(W1 지점)의 경우에는 2m 이상 하강하여 지하수의 빠른 배출에 의한 효과가 발생하였다. 또한, 지역 내 토양수분함량 및 그 표준편차도 감소하여 배수시설에 의한 지하수위 하강이 토양 습윤화를 억제한 것으로 분석되었다. 댐의 설계 시에는 지형지리적 특성을 고려하여 수두 차이에 의한 외부 지역으로의 누수 현상 예측 및 관련 대책을 수립해 나가야 한다.

공동주택 욕실 배수배관 자재 구성에 따른 양변기 배수소음 저감 특성 (Characteristics of Reducing the Water-drainage Noise of Toilet-bowl According to the Composition of Water Drainage Piping Materials of the Bathrooms of Apartment Housing)

  • 정아영;김경우;신혜경;양관섭
    • 한국소음진동공학회논문집
    • /
    • 제27권1호
    • /
    • pp.114-120
    • /
    • 2017
  • Water supply and drainage noise in the bathroom is recognized as one of the main noises, along with the floor-impact sounds, in apartment housings. Recently, to solve such noise issues, a new construction method of installing the piping on the slab has been adopted. rather than the traditional method of penetrating the piping through the slab between the upper and the lower bathrooms. However, this new method has limitations due to high costs and constructional difficulties. Therefore, this study was conducted to develop noise reducing piping and elbows, where the noise can be reduced simply by replacing the existing pipings. The noise level was measured in a laboratory by installing the horizontal drainage piping (three types) and the elbows (three types) developed in this study. The results showed that the horizontal pipings reduced the noise level in LAmax by 0.3 dB(A)~1.0 dB(A), as compared to the existing pipings (VG2), indicating an insignificant noise reduction effect. The elbow reduced the noise level in LAmax by 5.5 dB(A) ~ 11.5 dB(A), as compared to the existing elbow (DRF elbow), with the result of reducing the noise level at all frequencies evenly. Consequently, it was shown that using the elbows is more effective in reducing the water-drainage noise from the toilet than using the horizontal pipings.