• 제목/요약/키워드: double-level tunnel

검색결과 19건 처리시간 0.021초

국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례 (A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea)

  • 김경훈;최준동;전덕찬;신일재;심동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

도심지 대심도 복층터널의 내부구조물 계획 (A Design Focuses on the Internal Structure of Double-level Tunnel)

  • 박신영;정재호;조남각;신일재;심동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1314-1321
    • /
    • 2010
  • The west express way which links south west area of the central city of Seoul has been notorious for extremely heavy traffics since its first opening in 1991(i.e. the average vehicle speed is less than 25km/h, a daily traffic is 112,000 and among them, more than 94% of the vehicles are the light vehicles). The city government recently initiated a new BTO(Build-Transfer-Operate) project as an alternative in releasing heavy traffic and a high construction cost. The proposed underground express road is the first double-level tunnel (i.e. a total length of road is 10,91km and the tunnel is 9.308km long) ever built in South Korea, while such tunnel system is not new worldwide as such A86 East tunnel in France, SMART tunnel in Malaysia, and Fuxing tunnel in China. This paper discusses major design issues regarding the internal structures such as deck slab, and secondary liner.

  • PDF

대심도 복층터널에 대한 굴착 안정성 평가 비교 연구 (A comparative study on the stability evaluation of double deck tunnel in terms of excavation)

  • 장남주;강한길;김기환;최창림
    • 한국터널지하공간학회 논문집
    • /
    • 제21권1호
    • /
    • pp.155-166
    • /
    • 2019
  • 주요 도심지 도로건설은 포화상태로 지하공간의 개발이 필요하며 이를 위해 지하철도와 지하 도로 터널의 건설은 활발히 진행되어 왔다. 국외의 경우 지하 도로터널을 2층구조로 활용하는 복층터널 시공이 이루어 졌으며 이에 따른 지하공간 개발 기술이 높은 수준에 이르고 있다. 2차로 병설터널을 2차로 복층터널로 계획하는 경우 굴착 면적은 크게 차이가 나지 않으며, 터널 통과구간이 차지하는 폭을 대폭 줄일 수 있다. 이를 통해 터널 통과구간이 차지하는 폭을 대폭 감소시킬 수 있으므로 지반조건이 불량한 경우 필요한 상부 보강 비용을 절감할 수 있다. 본 연구에서는 복층터널 굴착에 따른 영향에 대해 알아봄으로써 지하공간 활용 기술을 높이고 단층터널 굴착영향과 비교를 통해 향후 복층터널 설계 및 안정성 평가에 도움이 될 수 있을 것으로 기대된다.

실대형 진동대 시험을 통한 복층터널 중간 슬래브 진동 감쇠 고무받침 내진성능 평가 (Seismic performance evaluation of middle-slab vibration damping rubber bearings in multi-layer tunnel through full-scale shaking table)

  • 장동인;박인준
    • 한국터널지하공간학회 논문집
    • /
    • 제22권4호
    • /
    • pp.337-346
    • /
    • 2020
  • 도심권의 교통 집중과 정체로 인하여 지하 공간 활용성이 필요함에 따라 지하구조물에 대한 연구가 늘어나고 있다. 그 중 복층터널은 지하구조물을 대표 할 수 있다. 복층터널은 중간슬래브를 기준으로 상, 하부 차도를 구분하여 운영하고 있다. 중간슬래브는 차량의 하중 및 지진하중에 의하여 동적거동을 한다. 특히 지진의 의한 응답특성은 하중의 크기 및 작용 메커니즘이 매우 복잡하고 이론적 접근이 어려워 실험적 연구가 필요하다. 본 연구에서는 붕괴방지 내진 1등급의 복층터널 중간슬래브에 진동 감쇠 고무받침 유무에 따른 안정성 평가를 실시하는데 목적을 두고 있다. 본 진동대 실험에서는 상사율 1/4을 적용하였으며, 모형실험에서 지반과 모형의 일체거동을 묘사하기 위하여 라이닝과 진동대판을 고정시켰으며 이를 통해서 상대거동을 최소화 하였다. 실험대상은 가상복층터널 TBM 표준단면으로 정했다. 기반암에 가해지는 지반운동 수준을 0.154 g (붕괴방지 수준 내진 1등급 인공지진파)이며 이 가속도를 최대로 하는 지진파를 진동대 입력(기반암)에 작용시켜 모형에 증폭현상을 분석하고 진동 감쇠 고무받침 유무에 따른 중간슬래브의 내진 안정성에 대해 평가 분석 하였다. 그 결과, 지진 감쇠 고무받침 유무에 따라서 지진 가속도 감쇠 효과가 최대 40% 이상 있음을 알 수 있었다.

근접 철도터널의 굴착계획 및 설계 사례 (A Case on Excavation Plan and Design of Adjacent Railroad Tunnel)

  • 김선홍;정동호;석진호;정건웅;서성호
    • 화약ㆍ발파
    • /
    • 제20권3호
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

좌심실 이중유출로를 동반한 교정형 대혈관전위증 -1예보고- (Double-Outlet of Left Ventricle in Corrected Transposition of Great Arteries -One case report-)

  • 권중혁
    • Journal of Chest Surgery
    • /
    • 제12권2호
    • /
    • pp.119-126
    • /
    • 1979
  • This is one case report of the extremely rare congenital cardiac malformation, Double-outlet of left ventricle in corrected transposition of great arteries. 11-year-old boy complained acrocyanosis and exertional dyspnea, the parents noticed cyanosis since birth. Physical examination revealed acrocyanosis, clubbed fingers and toes, G-III pansystolic murmur on 2nd and 3rd ICS, LSB. Right heart catheterization revealed significant $O_2$ jump in ventricular level. Right and left ventriculography showed the both catheters arriving in the same ventricle i.e. anterior chamber, morphological left ventricle was in right and anterior position, simultaneous visualization of aorta and pulmonary artery and aorta locating anterior and right side of pulmonary artery. Echo cardiogram surely disclosed interventricular septum. Conclusively it was clarified that the patient has Double-outlet of left ventricle and corrected transposition of great arteries [S.L.D.]. Operation was performed to correct the anomalies under extracorporeal circulation with intermittent moderate hypothermia. Right-sided ventriculotomy disclosed the following findings. 1. Right-sided ventricle was morphological left ventricle. 2. Left-sided ventricle was morphological right ventricle. 3. Right side atrioventricular valve was bicuspid. 4. Left side atrioventricular valve was tricuspid. 5. Aortic valve was superior, anterior and right side of pulmonary valve. 6. Subpulmonary membranous stenosis. 7. Non-committed ventricular septal defect. We made a tunnel between VSD and aorta with Teflon patch so that arterial blood comes through VSD and the tunnel into aorta. After correction the patient needed assisted circulation for 135 min. to have adequate blood pressure. Postoperatively by any means, adequate blood pressure could not be maintained and expired in the evening of operation day.

  • PDF

다목적 복층터널의 기능전환과 지하수위 변화에 따른 거동분석 (Behavior of double deck tunnel due to feature change and variation of ground water table)

  • 박노현;김호종;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제18권6호
    • /
    • pp.581-591
    • /
    • 2016
  • 최근 사회기반시설의 투자효율성을 높이기 위하여 평상 시 도로터널로 운영되지만 홍수 시 수로로 이용되는 수로 도로 다목적 터널의 계획이 시도되고 있다. 이러한 다목적 터널은 수로터널로의 이용이 한시적이기 때문에 내수압과 지하수위가 일정하지 않아 터널 내부와 외부의 압력변화가 상당할 수 있다. 특히 지하수위 아래에 건설 된 다목적 터널의 경우 장기간 운영 중에 발생하는 계절적 압력변화는 터널에 반복하중으로 작용하여 구조물과 인접지반의 열화로 이어질 가능성이 있다. 본 연구에서는 다목적 터널의 외부 및 내부 수위조건에 따라 발생할 수 있는 구조물의 거동특성을 모형실험 및 수치해석을 통하여 조사하였다. 그 결과 수위변화로 인한 터널 거동의 주 원인은 부력이며, 터널 내부 및 외부의 반복적인 수위변화는 터널 주변지반의 이완영역을 확대시키는 것으로 나타났다. 따라서 다목적 터널의 설계 시 수위변화에 따른 영향검토가 필요하며 경우에 따라 저항성을 유지시킬 수 있는 대책의 검토가 필요하다.

General SPICE Modeling Procedure for Double-Gate Tunnel Field-Effect Transistors

  • Najam, Syed Faraz;Tan, Michael Loong Peng;Yu, Yun Seop
    • Journal of information and communication convergence engineering
    • /
    • 제14권2호
    • /
    • pp.115-121
    • /
    • 2016
  • Currently there is a lack of literature on SPICE-level models of double-gate (DG) tunnel field-effect transistors (TFETs). A DG TFET compact model is presented in this work that is used to develop a SPICE model for DG TFETs implemented with Verilog-A language. The compact modeling approach presented in this work integrates several issues in previously published compact models including ambiguity about the use of tunneling parameters Ak and Bk, and the use of a universal equation for calculating the surface potential of DG TFETs in all regimes of operation to deliver a general SPICE modeling procedure for DG TFETs. The SPICE model of DG TFET captures the drain current-gate voltage (Ids-Vgs) characteristics of DG TFET reasonably well and offers a definite computational advantage over TCAD. The general SPICE modeling procedure presented here could be used to develop SPICE models for any combination of structural parameters of DG TFETs.

전자뇌관을 이용한 터널발파의 근거리 지반진동 특성 (Characteristics of Near-field Ground Vibration in Tunnel Blasting using Electronic Detonators)

  • 김용표;김갑수;손영복;김재훈;김희도;이준원
    • 화약ㆍ발파
    • /
    • 제31권1호
    • /
    • pp.76-86
    • /
    • 2013
  • 전자뇌관을 사용하여 근접 보안물건에 대한 터널발파 진동제어를 위해서는 근거리 발파진동 특성에 대한 이해가 필요하다. 본 논문에서는 터널발파 진동의 결정에 있어서, 심발부와 확대부의 영향을 분석하였다. 분석을 위한 계측자료는 "원주~강릉 복선전철 제${\bigcirc}{\bigcirc}$공구 노반건설공사" ${\bigcirc}{\bigcirc}{\bigcirc}$ 터널 현장의 기존 도로 하부통과 구간에서 획득하였다. 이에, 0.01%의 높은 시차 정밀도를 가진 터널용 전자발파시스템을 활용하여, 최대 지발당 장약량을 정밀하게 유지함으로써 뇌관 오차에 의한 진동 증폭현상을 제거하고, 진동제어에 유리한 심빼기 발파방법으로 번 컷(Burn-Cut)을 채택하였다. 그 결과, 심발부의 진동수준이 가장 높다는 일반적인 발파 상식과 달리 확대부의 진동수준이 상대적으로 더욱 높은 것으로 나타났다. 결과적으로, 근접 거리의 터널 발파진동은 전자뇌관을 심발부에 적용함으로서 저감시킬 수 있으며, 전체 영역에 전자뇌관을 사용할 경우 더욱 효과적으로 발파진동을 감소시킬 수 있을 것으로 판단된다.

복층터널의 분기터널 굴착에 따른 기존터널의 안정성 분석 (Stability analysis of an existing tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel)

  • 김한얼;김정주;이재국;유한규
    • 한국터널지하공간학회 논문집
    • /
    • 제19권5호
    • /
    • pp.779-797
    • /
    • 2017
  • 최근 도심지의 지상교통시설이 포화수준에 이르렀을 뿐만 아니라 증가하는 교통량으로 인한 교통난과 미세먼지 등의 대기환경 오염의 심화로 인하여 지하도로건설이 각광을 받고 있다. 지하도로건설은 도심지 교통난 해소와 더불어 친환경적인 도시설계가 가능하기 때문에 신설도로 뿐만 아니라 기존도로 역시 지하화 되어 가는 추세이다. 지하도로건설시 IC(분기점)와 JC(나들목) 역할을 수행하는 분기터널의 건설은 필수적이라 할 수 있다. 따라서 분기터널에 의한 기존터널의 영향분석은 필수적으로 고려해야한다. 본 연구에서는 분기터널 굴착 시 기존터널에 미치는 영향을 수치해석을 통해 분석하였다. 분기터널을 기존터널의 직하부를 기점으로 하여 시계방향으로 $45^{\circ}$간격으로 총 5가지의 경우를 설정하였으며, 각각의 경우에서 변위조절방법(Displacement Controlled Model)을 이용하여 지반손실률을 0.5%, 1.0% 그리고 1.5%을 적용하여 수치해석을 실시하였다. 그 결과, 지반손실률이 증가할수록 변위와 파괴범위, 그리고 안정성에 미치는 영향이 증가하는 것으로 나타났다. 또한 직하부에 위치한 분기터널이 가장 안정성에 취약한 것으로 확인 되었으며, 분기터널의 위치가 연직, 수평방향에 있을 경우보다 대각선방향에 위치할 경우가 변형과 라이닝 파괴 측면에서 불안정한 것으로 나타났다.