Evaluation of blasting vibration with center-cut methods for tunnel excavation

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Kim, Nam-Soo
    • Geomechanics and Engineering
    • /
    • 제30권5호
    • /
    • pp.423-435
    • /
    • 2022
  • Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.

심발공법에 따른 발파진동 저감효과에 대한 수치해석적 연구 (A Numerical Study on the Reduction Effect of Blasting Vibration with Cut Method)

  • 손지호;김병렬;이승중;김남수;이효;최성웅
    • 화약ㆍ발파
    • /
    • 제37권1호
    • /
    • pp.1-13
    • /
    • 2019
  • 발파굴착을 수행하는 터널시공 현장에서, 발파진동이 반복적으로 작용할 경우 인근 보안물건에 손상을 입힐 수 있으며, 이러한 발파진동을 저감시킬 수 있는 방법으로는 전자뇌관의 사용, 분산장약, 심발공법의 변경 등이 고려될 수 있다. 본 연구에서는 수치해석 기법을 이용하여 심발공법에 따른 발파진동 저감효과를 분석하고자, 3차원 유한차분법 프로그램인 FLAC3D를 이용하여 발파공, 지연시차, 장약량 등을 수치모델에 반영하고, 발파공별로 동하중을 적용하여 수치해석을 수행하였다. 심발공법은 터널 시공현장에서 많이 사용되고 있는 V-cut 공법 및 다단평행의 심발공법을 적용하였으며, 실제 터널 시공현장에서 시험발파를 수행하여 현장의 발파진동 계측자료와 수치해석의 진동속도를 비교하였다. 수치해석과 시험발파의 발파진동은 매우 유사한 경향을 나타낸 것으로 분석되었다.