• Title/Summary/Keyword: dispute factors

Search Result 93, Processing Time 0.022 seconds

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

U.S.-China Trade Dispute and 2018 US Midterm Elections: Does International Economic Environment Affect the Gubernatorial Election? (미-중 무역 분쟁과 2018년 미국 주지사 선거: 주지사 선거는 국제경제 변화에 영향을 받는가?)

  • Chang, Hyeyoung
    • American Studies
    • /
    • v.42 no.1
    • /
    • pp.23-55
    • /
    • 2019
  • Do international economic factors affect the result of gubernatorial elections? This research aims to explain the reasons that local elections are not influenced by international economic factors such as US-China trade dispute. Although previous studies show the mixed results about the relationship between economic factors and gubernatorial electoral outcome, this research argues at least three explanations can be identified. First, there is a perceived gap between the candidates and local voters on the effect of trade disputes. Local voters do not consider the trade dispute as immediate threats, and candidates only use the trade dispute for attacking rivals. Where the functional responsibilities are unclear among elected officials between federal and local government, voters tend to cast votes based on their party identification. In the case of trade policy, functional responsibility is murky between the president and governor; voters may not judge the governor incumbent or candidates on state economic condition.

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project - (프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 -)

  • Yoon Jun-Seon;Kwon Gi-Beom;Seo Choon-Taek;Paek Joon-Hong
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

Study on Drafting Appropriate Dispute Resolution Clause in International Contract

  • Lee, Se-In
    • Journal of Arbitration Studies
    • /
    • v.29 no.3
    • /
    • pp.39-52
    • /
    • 2019
  • There are various factors to consider when parties to an international agreement draft a dispute resolution clause in their written contract. These factors can be classified into two categories. The first category is about the parties and the nature of the contract, such as the parties' places of business and whether the contract contains a simple transaction or has a complicated nature. The second category is about the applicable rules of the parties' places of business or performance such as the private international law, service of process rules, and enforcement of court judgment and arbitration award rules. When parties to an international contract agree to a litigation, they normally choose a forum court and a governing law. In selecting a forum court and a governing law, the parties must consider private international law, service of process rules, and enforcement of judgement rules of candidate forums. In case the parties agree to an arbitration, they have to choose between institutional arbitration and ad hoc arbitration. For ad hoc arbitration, parties still need to further agree on which arbitration rules to use, and in which place the arbitration shall take place. Mediation involves a similar kind of decision as with arbitration. Traditionally, national courts of the parties' places of business have been used as litigation forums in dispute resolution clauses but, recently, arbitration is being increasingly employed as an alternative dispute resolution method in international contracts. Moreover, there have been international efforts to utilize mediation as a dispute resolution method in international commercial issues. Rather than simply taking a dispute resolution clause provided in a sample written contract, parties to an international contract must carefully consider various relevant factors in order to insert a dispute resolution clause which will work well for a particular contract.

Theoretical Analysis of Japan-South Korea Trade Dispute (한일무역분쟁의 게임이론적 분석)

  • Hyelin Choi
    • Korea Trade Review
    • /
    • v.46 no.5
    • /
    • pp.1-12
    • /
    • 2021
  • In 2009, Japanese government requires exporters to have individual export licenses for certain items and removes South Korea from White Countries. The export control and regulations are likely to be affected by political factors. This study aims to analyze Japan-South Korea trade dispute with a sequential game with incomplete information. The results show that Japan may apply trade regulations on Korea regardless of efficiency of Korea and the possibilities of regulations increases when political factors are important in its decision on export policy.

A Study on Dispute Resolution Procedures under the German Consumer Alternative Dispute Resolution Act (독일의 대체적 소비자분쟁해결법상 분쟁해결 절차에 관한 연구 -분쟁조정인의 법적 지위와 역할을 중심으로-)

  • Sung, Joon-Ho
    • Journal of Arbitration Studies
    • /
    • v.32 no.1
    • /
    • pp.71-91
    • /
    • 2022
  • The legal integration in the European Union that seeks a unified system in consumer disputes and the German Consumer Dispute Mediation Act based on this pursues the procedural fairness of consumer disputes and the equality of results. The role and legal status of the dispute mediator, who plays a very important role in this process, and the stable operation of the dispute resolution system and the guarantee of reasonable results through the guarantee of fairness and independence are very important values. In particular, the dispute mediator under the Act is conceptually different from the existing mediator or mediator, and through this distinction, the duties and contents of the dispute mediator are also distinguished. For this reason, the qualifications of dispute mediators that affect the outcome of dispute mediation are strictly stipulated. There have been some criticisms of this strictness, and such strictness is also seen as an excessive limitation. However, these standards can be understood as one of the efforts to make the dispute mediation procedure more systematic and to operate objectively in accordance with laws and procedures. In addition, in relation to the issue of independence and impartiality of the dispute mediator, the status of the dispute mediator is guaranteed in various aspects. In economic terms, it is not influenced by external factors, and furthermore, in order to guarantee job stability, the results of job security and dispute resolution are not linked. By examining the appropriate level of discipline for these dispute mediators, we expect the developmental growth of the consumer dispute resolution system under our Act.

Identifying and Analyzing Pre-Dispute Factors for Construction Projects (건설공사 사전분쟁요인 도출 및 분석)

  • Park, Sung-Yong;Yang, Jin-Kook;Kim, Byeong-Ok;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.48-57
    • /
    • 2009
  • As recent construction projects have gradually become larger in size and complex, construction documents such as drawings and specifications revealed the limitations that can not express all the necessary information. Due to the lack of stipulations on the contract, disputes arise among contracting parties. Traditionally, many construction companies in Korea make an unfair agreement with the clients so that the irrational items are included in their contract documents. Potential dispute factors are triggered as a result of misleading or omitted items on the written documents. This paper analyzed the civic counseling cases obtained from the public procurement service in Korea, and identified the potential dispute factors that can occur during pre-dispute stage alone with their influence analysis. The results found from this study can be used for the development of checklists that prevent the dispute in the process of construction projects.

On the Use of Legal Measures to entice Participation in Online Dispute Resolution System (ODR 시스템으로의 사용자 참여유인을 위한 법적 장치의 활용)

  • Kim, Sun-Kwang
    • International Commerce and Information Review
    • /
    • v.10 no.1
    • /
    • pp.279-293
    • /
    • 2008
  • The number of participants in an online dispute resolution(ODR) system is crucial to its survival. Securing participation is nonetheless difficult. Clearly, it is important to offer a system that is fair, transparent and offers an efficient service at low cost. These factors are fundamental to ensure trust and to build a returning customer base to the system, but are not what attracts a party to submit a dispute for settlement. This paper describes and discusses four main categories of legal measures found in the online dispute resolution services offered by SquareTrade and WIPO. In spite of shortcomings in the offered, the legal measures have contributed to attract large numbers of participants. Large participation secures the long-term economic viability of an online dispute resolution system. The four categories of legal measures described and discussed in this paper need to be part of the specifications and the design and development of future ODR system.

  • PDF