• Title/Summary/Keyword: differential shortening

Search Result 49, Processing Time 0.028 seconds

Analysis on Long Term Behavior in 120-Story High-Rise Buildings according to Lateral-Load-Resisting Systems (120층 규모 초고층 건물에 대한 횡력저항시스템 적용에 따른 장기거동 분석)

  • Kim, Gyeong-Chan;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.2
    • /
    • pp.119-129
    • /
    • 2022
  • It is essential to control the lateral displacement and differential axial shortening of the vertical elements in high-rise buildings. The differential axial shortening can cause challenges in the serviceability and safety of non-structural and structural elements, respectively. Hence, in this study, the differential axial shortening of the vertical elements and effects of long term behaviors of concrete are analyzed in 120-story high-rise buildings via the construction sequence analysis. Consequently, the axial shortening of the vertical elements is classified into elastic, creep, and shrinkage shortening, and dominant factors to the maximum axial shortening are analyzed. In addition, the serviceability of the non -structural elements is checked with a differential axial shortening at 30 years after completion of construction, and member forces at design and construction stages in girders and outrigger walls are compared.

Optimal Compensation of Differential Column Shortening in Tall Buildings for Multi Column Groups (고층건물의 멀티 기둥그룹에 대한 부등기둥축소량의 최적보정기법)

  • Kim, Yeong-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.2
    • /
    • pp.189-197
    • /
    • 2008
  • This study presents optimal compensation algorithm of differential column shortening for more than two column groups. The proposed algorithm produces the minimum story groups and their compensation thicknesses which satisfy constraint conditions on performance and construction and enables not only the relative compensation but also the mixed compensation considering absolute shortening. The simulated annealing algorithm is used as the main optimization technique. The applicability of the proposed algorithm was verified by applying it to the 61-storey building where compensation of differential column shortening had already been performed. Using, the proposed algorithm compensation was performed easily and the number of compensation was less than the field method.

Prediction and Compensation of Differential Column Shortening in 52 story Amatapura Apartment Building (52층 아마타푸라 아파트의 기둥 부등축소량 예측 및 보정에 관한 연구)

  • 조석희;송진규;정하선;이상순;이태규;김진근
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.04a
    • /
    • pp.397-402
    • /
    • 1998
  • The objectives of this paper are to estimate differential column Shortening and to determine appropreate compensation amount in 52 story Amatapura Apartment in Indonesia. for this, a computer program based on PCA and CEB-FIP code is developed. The results show that Elastic and Creep strain are the main factors of column shortening and the maximum differential shortening is appeared near the middle of the building height. The results between field survey and estimation have some difference, the most influential factor of the difference can be lateral restraints provided by horizontal members, which cannot be handled in this developed program. Hence introducing the modification factors from various field survey, this program can be used properly in design and construction procedures.

  • PDF

Minimization of differential column shortening and sequential analysis of RC 3D-frames using ANN

  • Njomo, Wilfried W.;Ozay, Giray
    • Structural Engineering and Mechanics
    • /
    • v.51 no.6
    • /
    • pp.989-1003
    • /
    • 2014
  • In the preliminary design stage of an RC 3D-frame, repeated sequential analyses to determine optimal members' sizes and the investigation of the parameters required to minimize the differential column shortening are computational effort consuming, especially when considering various types of loads such as dead load, temperature action, time dependent effects, construction and live loads. Because the desired accuracy at this stage does not justify such luxury, two backpropagation feedforward artificial neural networks have been proposed in order to approximate this information. Instead of using a commercial software package, many references providing advanced principles have been considered to code a program and generate these neural networks. The first one predicts the typical amount of time between two phases, needed to achieve the minimum maximorum differential column shortening. The other network aims to prognosticate sequential analysis results from those of the simultaneous analysis. After the training stages, testing procedures have been carried out in order to ensure the generalization ability of these respective systems. Numerical cases are studied in order to find out how good these ANN match with the sequential finite element analysis. Comparison reveals an acceptable fit, enabling these systems to be safely used in the preliminary design stage.

A Study on the Effect of Construction Time in the Column Shortening in High-Rise Building (초고층 구조물에서 기둥축소에 대한 시공기간의 영향에 관한 연구)

  • 정은호;김희철
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1996.10a
    • /
    • pp.267-274
    • /
    • 1996
  • Differential shortening of vertical members in high-rise buildings affect other structural members that have to be considered such as horizontal members and exterior cladding. of many elements which affect the total amount of shortening, different loading history mainly comes from the different construction time. Shortening of 66 story concrete columns were investigated and compared according to the different construction time, little difference was found between the total shortening of interior and that of exterior column.

  • PDF

Differential Column Shortening of Plaza zrakyat Office Tower Including Inelastic Effect (비산성효과를 고려한 Plaza Rakyat 오피스동의 기둥부등축소량)

  • 송화철;유은종;정석창;주영규;안재현;박칠림
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.475-480
    • /
    • 1997
  • Highrise concrete buildings are very sensitive to cumulative and differential shortening of their vertical element such as wall and columns. Inelastic deformation due to creep and shrinkage consist of various factors and load history af actual building is very complicated. Therefore, for the accurate prediction and compensation of axial shortening, special efforts in design and construction phase are required to ensure long-term serviceability and strength requirement. In this paper, axial shortening estimation and compensation procedure is presented, which utilized experimentally determined concrete properties and preliminary load history and computerized approach, in case of Plaza Rakyat office tower, 79-story reinforced concrete building under construction in Malaysia.

  • PDF

Development of Field-friendly Optimal Compensation System for Differential Column Shortening (현장 적용성을 고려한 기둥축소량의 최적보정시스템 개발)

  • Kim, Yeong-Min
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.2
    • /
    • pp.139-152
    • /
    • 2010
  • This study presents graphic-user interface computer program for optimal compensation of differential column shortening with high field applicability. The implemented system can perform both relative and mixed compensation while satisfying both performance and construction constraints. In the proposed system the shape of the structure before and after compensation can be checked graphically, and the results of compensation of each stories can be printed in drawings which can be directly used as the report of column shortening. The field-applicability of the implemented system was verified by applying it to the four reinforced concrete residental buildings of 61, 42, 49 and 53 stories where compensation of differential column shortening had already been performed. Using the implemented system, compensation can be performed easily with the various constraint conditions and was able to acquire rational compensation results for the cases where conventional method was not successful.

Column Shortening Analysis and Field Measurement of Haeundae I'Park (초고층 건축물의 기둥축소량 해석 및 현장계측 - 해운대 아이파크)

  • Chung, Kwang-Ryang;Lee, Dae-Yong;Song, Ho-Beom;Park, Kwang-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.67-70
    • /
    • 2011
  • The effect of column shortening is a major consideration in design and construction of tall buildings, especially in concrete and composite structural systems. To avoid unexpected demage in structural and nonstructural elements, differential shortening between vertical members resulting from differing stress levels, loading histories, volume-to-surface ratios and other factors in a high-rise building must be properly considered in the design process. This paper represents analyzed and measured shortening results of RC cores and columns at the 72 story Haeundae I'Park. It shows that WACS program based on ACI and PCA material model is effective for the prediction of column shortening.

  • PDF

Effects of Perimeter to Core Connectivity on Tall Building Behavior

  • Besjak, Charles;Biswas, Preetam;Petrov, Georgi I.;Streeter, Matthew;Devin, Austin
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.1-9
    • /
    • 2017
  • The Pertamina Energy Tower (PET) and Manhattan West North Tower (MWNT) are two supertall towers recently designed and engineered by Skidmore, Owings & Merrill (SOM). The structural system for both buildings consists of an interior reinforced concrete core and a perimeter moment frame system, which is primarily structural steel. As is typical for tall towers with both concrete and steel elements, staged construction analysis was performed in order to account for the long term effects of creep and shrinkage, which result in differential shortening between the interior concrete core and steel perimeter frame. The particular design of each tower represents two extremes of behavior; PET has a robust connection between the perimeter and core in the form of three sets of outriggers, while the perimeter columns of MWNT do not reach the ground, but are transferred to the core above the base. This paper will present a comparison of the techniques used during the analysis and construction stages of the design process with the goal of understanding the differences in structural behavior of these two building systems in response to the long term effects of creep and shrinkage. This paper will also discuss the design and construction techniques implemented in order to minimize the differential shortening between the interior and exterior over the lifespan of these towers.

An Evaluation for Vertical Structural Members Compensated during Design Process and These Compensated during Construction of High-rise Building under Seismic Load (설계 및 시공과정에 보정된 고층건물 구조재의 지진하중에 의한 영향 평가)

  • 정은호
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.3 no.1
    • /
    • pp.93-102
    • /
    • 1999
  • Increased height of buildings causes severe shortening of vertical structural members due to the accumulated axial load. It not only decreases the serviceability of a structure but also affects significantly the stability of a structure itself due to the secondary stress. The main purpose of estimating the shortening of vertical structural members is to compensate the differential shortening of adjacent members. This paper presents the comparison of stresses between the vertical structural members compensated during construction process and these compensated during design process under the seismic load and represents that the precise compensation of vertical structural members is important.

  • PDF