• Title/Summary/Keyword: development stage duration

Search Result 175, Processing Time 0.024 seconds

Growth and Development of Acartia steueri (Copepoda: Calanoida) in the Laboratory (실험실에서 요각류 Acartia steueri의 성장과 발생)

  • KANG Hyung-Ku;KANG Yong Joo
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.31 no.6
    • /
    • pp.842-851
    • /
    • 1998
  • Development and growth of Acartia steueri from Ilkwang Bay, southeastern coast of Korea, were determined under various temperatures and food condition (Isochrysis galbana and Dunaliella salina) in the laboratory. Relationship between egg hatching time ($D_E$, day) and temperature (T, $^{\circ}C$) was $D_E=744(T+3.5)^{-1.97}$. Mean hatching success was $88.4\%$ in temperature range of $8.4\~26.2^{\circ}C$. This suggests that A. steueri may be adapted to the temperature ranges in temperate regions. Post-embryonic development pattern was equiproportional rather than isochronal, with longer stage duration of copepodites than that of the nauplii. Stage duration of NI was the shortest of all developmental stages, while the duration of NII was the longest in duration of the other nauplii. Male was morphologically distinguished from female in CIV stage, and male was developed faster than female. Median development time at a given temperature was calculated from the Belehradek equation by proper multiplication of proportional constant for embryonic development. Body carbon weight at $19.1^{\circ}C$ was increased exponentially with time. Mean specific growth rate of nauplii (0.200 $d^{-1}$), except for NI stage, was not significantly different from that of copepodites (0.190 $d^{-1}$), with the lowest rate in NVI stage (0.107 $d^{-1}$), probably due to energy consumption for metamorphosis rather than somatic growth. The results suggest that although the development pattern determined in this study was not identical with Uye's result for A. steueri (e.g. Uye, 1980b), median development time may be applicable to calculate the stage duration of A. steueri in this study area.

  • PDF

Effect of Waterlogging Duration on Growth Characteristics and Productivity of Forage Corn at Different Growth Stages Under Paddy Field Conditions

  • Jung, Jeong Sung;Choi, Gi-Jun;Choi, Bo-Ram
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.39 no.3
    • /
    • pp.141-147
    • /
    • 2019
  • The purpose of this study was to determine the effect of waterlogging duration on the growth characteristics and productivity of forage corn at different growth stages under paddy field conditions. Treatments consisted of waterlogging at two growth stages (V7 or V14) for four waterlogging durations (no waterlogging, 48 hours, 72 hours, and 96 hours, respectively). The V14 growth stage was more vulnerable to waterlogging than the V7 stage. Among the waterlogging durations, the lodging score increased at 48 hours. The stem height of forage corn decreased with the increase in waterlogging duration at the different growth stages (V7 and V14). Increase in waterlogging duration reduced the stem dry matter yield, ear dry matter yield, and total dry matter yield at both growing stages (V7 and V14). The waterlogging treatments at the V14 stage affected ear dry matter yield more than those at the V7 growing stage. Thus, the management of forage corn under paddy field conditions must be strengthened during early (V7) and grain fill stages (V14). When waterlogging occurs, surface and subsurface drainage should be implemented within 48 hours to control (no waterlogging) the groundwater level and, thus, minimize economic losses due to forage corn damage.

Effects of IVM and IVF Duration on In Vitro Development and Cell Numbers of Embryos in Korean Native Cattle

  • Park Yong-Soo
    • Reproductive and Developmental Biology
    • /
    • v.28 no.4
    • /
    • pp.221-226
    • /
    • 2004
  • The present study was performed to investigate the effects of in vitro maturation (IVM) and in vitro fertilization (IVF) duration on the development of Korean Native Cattle embryos. The time of blastocyst formation and the quality of blastocysts based on cell numbers were examined. The cleavage rate increased with the length of IVF duration in the groups of 18-hr IVM, but was constant in the groups of 24-hr IVM. The development rate to the 8-cell stage was significantly higher in the IVM 18: IVF 20 group than in the IVM 24: IVF 24 group. The development rate to the blastocyst stage was highest in the IVM 18: IVF 20 group, significantly different from that of the IVM 18: IVF 16, IVM 24: IVF 20 and IVM 24: IVF 24 group. The time of blastocysts formation tended to be shorter when IVM and IVF duration were decreased. The number of inner cell mass, trophoblast and the total cells were significantly higher in the IVM 18: IVF 16 group than in the IVM 24: IVF 24 group (P<0.05). These results demonstrated that the IVM and IVF duration should be adequate for the efficient production of bovine embryos, and it might particularly be essential to determine the proper combination of IVM and IVF duration.

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

Relationship between Plastochrone and Development Indices Estimated by a Nonparametric Rice Phenology Model

  • Lee, Byun-Woo;Nam, Taeg-Su;Yim, Young-Seon
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.44 no.2
    • /
    • pp.149-153
    • /
    • 1999
  • Prediction of rice developmental stage is necessary for proper crop management and a prerequisite for growth simulation as well. The objectives of the present study were to find out the relationship between the plastochrone index(PI) and the developmental index(DVI) estimated by non-parametric phenology model which simulates the duration from seedling emergence(DVI=0) to heading(DVI=l) by employing daily mean air temperature and daylength as predictor variables, and to confirm the correspondency of developmental indice to panicle developmental stages based on this relationship. Four japonica rice cultivars, Kwanakbyeo, Sangpungbyeo, Dongjinbyeo, and Palgumbyeo which range from very early to very late in maturity, were grown by sowing directly in dry paddy field five times at an interval of two weeks. Data for seedling emergence, leaf appearance, differentiation stage of primary rachis branch and heading were collected. The non-parametric phenology model predicted well the duration from seedling emergence to heading with errors of less than three days in all sowings and cultivars. PI was calculated for every leaf appearance and related to the developmental index estimated for corresponding PI. The stepwise polynomial analysis produced highly significant square-rooted cubic or biquadratic equations depending on cultivars, and highly significant square-rooted biquadratic equation for pooled data across cultivars without any considerable reduction in accuracy compared to that for each cultivar. To confirm the applicability of this equation in predicting the panicle developmental stage, DVI at differentiation stage of primary rachis branch primordium was calculated by substituting PI with 82 corresponding to this stage, and the duration reaching this DVI from seedling emergence was estimated. The estimated duration revealed a good agreement with that observed in all sowings and cultivars. The deviations between the estimated and the observed were not greater than three days, and significant difference in accuracy was not found for predicting this developmental stage between those equations derived for each cultivar and for pooled data across all cultivars tested.

  • PDF

Development of Systematic Process for Estimating Commercialization Duration and Cost of R&D Performance (기술가치 평가를 위한 기술사업화 기간 및 비용 추정체계 개발)

  • Jun, Seoung-Pyo;Choi, Daeheon;Park, Hyun-Woo;Seo, Bong-Goon;Park, Do-Hyung
    • Journal of Intelligence and Information Systems
    • /
    • v.23 no.2
    • /
    • pp.139-160
    • /
    • 2017
  • Technology commercialization creates effective economic value by linking the company's R & D processes and outputs to the market. This technology commercialization is important in that a company can retain and maintain a sustained competitive advantage. In order for a specific technology to be commercialized, it goes through the stage of technical planning, technology research and development, and commercialization. This process involves a lot of time and money. Therefore, the duration and cost of technology commercialization are important decision information for determining the market entry strategy. In addition, it is more important information for a technology investor to rationally evaluate the technology value. In this way, it is very important to scientifically estimate the duration and cost of the technology commercialization. However, research on technology commercialization is insufficient and related methodology are lacking. In this study, we propose an evaluation model that can estimate the duration and cost of R & D technology commercialization for small and medium-sized enterprises. To accomplish this, this study collected the public data of the National Science & Technology Information Service (NTIS) and the survey data provided by the Small and Medium Business Administration. Also this study will develop the estimation model of commercialization duration and cost of R&D performance on using these data based on the market approach, one of the technology valuation methods. Specifically, this study defined the process of commercialization as consisting of development planning, development progress, and commercialization. We collected the data from the NTIS database and the survey of SMEs technical statistics of the Small and Medium Business Administration. We derived the key variables such as stage-wise R&D costs and duration, the factors of the technology itself, the factors of the technology development, and the environmental factors. At first, given data, we estimates the costs and duration in each technology readiness level (basic research, applied research, development research, prototype production, commercialization), for each industry classification. Then, we developed and verified the research model of each industry classification. The results of this study can be summarized as follows. Firstly, it is reflected in the technology valuation model and can be used to estimate the objective economic value of technology. The duration and the cost from the technology development stage to the commercialization stage is a critical factor that has a great influence on the amount of money to discount the future sales from the technology. The results of this study can contribute to more reliable technology valuation because it estimates the commercialization duration and cost scientifically based on past data. Secondly, we have verified models of various fields such as statistical model and data mining model. The statistical model helps us to find the important factors to estimate the duration and cost of technology Commercialization, and the data mining model gives us the rules or algorithms to be applied to an advanced technology valuation system. Finally, this study reaffirms the importance of commercialization costs and durations, which has not been actively studied in previous studies. The results confirm the significant factors to affect the commercialization costs and duration, furthermore the factors are different depending on industry classification. Practically, the results of this study can be reflected in the technology valuation system, which can be provided by national research institutes and R & D staff to provide sophisticated technology valuation. The relevant logic or algorithm of the research result can be implemented independently so that it can be directly reflected in the system, so researchers can use it practically immediately. In conclusion, the results of this study can be a great contribution not only to the theoretical contributions but also to the practical ones.

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

A Predictive Model for Software Development Team Size and Duration Based on Function Point (기능점수 기반 소프트웨어 개발팀 규모와 개발기간 예측 모델)

  • Park, Seok-Gyu;Lee, Sang-Un
    • The KIPS Transactions:PartD
    • /
    • v.10D no.7
    • /
    • pp.1127-1136
    • /
    • 2003
  • Estimation of software project cost, effort and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of models estimate the development effort using the function point that is measured from the requirement specification. This paper presents optimal team size and duration prediction based on function point in order to provide information that can be used as a guide in selecting the most Practical and productive team size for a software development project. We introduce to productive metrics and cost for decision criteria of ideal team size and duration. The experimental is based on the analysis of 300 development and enhancement software project data. These data sets are divide in two subgroups. One is a development project; the other is a maintenance project. As a result of evaluation by productivity and cost measured criteria in two subgroups, we come to the conclusion that the most successful projects has small teams and minimum duration. Also, I proposed that predictive model for team sire and duration according to function point size based on experimental results. The presented models gives a criteria for necessary team site and duration according to the software size.

Developmental Duration and Morphology of the Sea Star Asterias amurensis, in Tongyeong, Korea

  • Paik, Sang-Gyu;Park, Heung-Sik;Yi, Soon-Kil;Yun, Sung-Gyu
    • Ocean Science Journal
    • /
    • v.40 no.3
    • /
    • pp.177-182
    • /
    • 2005
  • The process of embryogenesis and larval development of the asteroid sea star Asterias amurensis $(U{\ddot{u}}tken)$ was observed, with special attention paid to morphological change and larval duration. In reproductive season, mature sea stars were collected under floating net cages, located in Tongyeong, southern Korea. The mature eggs are $138\;{\mu}m$ in average diameter, semi-translucent and orange in color, sperms in good condition appear light cream to white-gray in color. Embryos develop through the holoblastic equal cleavage stage and a wrinkled blastula stage that lasts about 9 hours after fertilization. Gastrulae bearing an expanded archenteron hatch from the fertilization envelope 22 hours after fertilization. At the end of gastrulation, rudiments of the left and right coelom are formed. By day 2, larvae possess complete alimentary canal and begin to feed. At this stage, the larva is called early bipinnaria. In 6-day-old larvae, the pre- and post- oral ciliated bands form complete circuits and the bipinnarial processes start to develop. By day 12, the lateral and anterior projection of the larval wall processes along the ciliated bands begins to thicken and curl, and the ciliated bands become more prominent. By day 32, early brachiolaria are presented with three pairs of brachiolar arms. Advanced brachiolaria with a well-developed brachiolar complex (three pairs of brachia and central adhesive disc) occur 6 weeks after fertilization. In the field, spawning of the sea star was observed in April to May, settlement form larvae and just settlements seem to occur from June to July, and early juveniles occur from August to September. Although we had not described the end of brachiolaria stage, it can be tentatively estimated that the duration of the pelagic stage of A. amurensis is 40 to 50 days.

Marsupial Development and Molt Cycle of Archaeomysis kokuboi (Crustacea: Mysidacea)

  • Ma Chae Woo;Hong Sung Yun;Jo Soo Gun
    • Fisheries and Aquatic Sciences
    • /
    • v.5 no.4
    • /
    • pp.271-280
    • /
    • 2002
  • Ovarian cycle, marsupial development and molt cycle of Archaeomysis kokuboi were studied to understand these processes as a whole event. Based on morphological characters the marsupial development is divided into 3 stages, Embryonic stage (duration time of 4 days), Nauplioid stage (5 days) and Postnauplioid stage (4 days). Morphological description was ma de for the 3 stages, and each stage was examined in relation to the corresponding stages of ovarian cycle and molt cycle.