• Title/Summary/Keyword: destressing

Search Result 4, Processing Time 0.018 seconds

A study on the Longitudinal Force Variation of CWR according to the Condition of Track Maintenance (궤도보수 작업 조건별 장대레일 축력변화에 관한 연구)

  • Won, Yong-Hoan;Kim, Kwan-Hyung;Kwon, Soon-Jung;Lee, Seung-Youl
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.99-105
    • /
    • 2009
  • This research presents the method to decide proper locations for destressing of CWR using a non-destructive equipments to measure the longitudinal force(installation temperature) in CWR. The effect and necessity of destressing were analyzed by estimating changes of longitudinal force. The installation temperature was measured to find changes of longitudinal force in high speed and conventional lines before and after destressing or track maintenance at the locations where destressing was planed or where change of longitudinal force was expected during track maintenance. Past destressing was carried out within qualitative decision criteria. This research proposes the quantitative criteria to decide the priority order of the destressing locations reasonably by considering the difference of air temperature and stress free temperature during the track maintenances, the grade of ballast resistance force recovering and the length of destressing, etc.

  • PDF

The Installation of Turnout on High Speed Operating Line (고속철도 운행선구간에서의 분기기 설치 기법)

  • Choi, You-Bok;Kim, In-Jae;Ha, Bok-Su;Shin, Soon-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.273-281
    • /
    • 2010
  • To install turnout on the main line of high speed railway running 300km/h, measures of rail destressing of existing line, speed-up plan, shortening the installation time and other important technical measures should be considered to reduce the inconvenience of passenger. In particular, for the newly constructing Ohsong and Kimcheon-Gumi station in KyongBu high speed line, it must be difficult to install divided turnout part because it should be done within short night block out hours (6 hours per day) and KTX trains are safely serviced just in time, which is not only the first time in the domestic and but also very rare practical experience in the world. This thesis is covered with experienced work conditions, required equipments and various safety measures, etc.

  • PDF

Multimetric Measurement Data Monitoring System Using Sigmoid Function (시그모이드 함수를 이용한 다중 계측데이터 모니터링 시스템)

  • Jeong-Ho Song;Jun-Woo Shin;Heui-Soo Han
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.137-149
    • /
    • 2023
  • In order to intuitively grasp the earth pressure direction acting on the structure and displacement state, displacement data in the horizontal and vertical directions were processed using the sigmoid function. A displacement coordinate system was set up for each axis. The system can intuitively check the current displacement and assess the management stage of each point. A displacement path can be compiled from continuously recorded points, allowing trends in the displacement's history and stress direction to be known. Analysis of data measured for excavated ground, found that displacement occurred in the direction of destressing at all points, and that the points' management state steady. Similar behavior trends were found among measurement points with high spatial correlation, whereas differing behavior trends occurred among measurement points with low spatial correlation. If the correlation analysis of the precursor and behavior area is performed using the continuously distributed surface settlement data and displacement coordinate system, it will be possible to predict the failure time and area.

A Novel Method for In Situ Stress Measurement by Cryogenic Thermal Cracking - Concept Theory and Numerical Simulation (저온 열균열 현상을 이용한 초기 응력 측정법 - 개념, 이론 및 수치해석)

  • Ryu, Chang-Ha;Ryu, Dong-Woo;Choi, Byung-Hee;Synn, Dong-Ho;Loui, John P.
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.343-354
    • /
    • 2008
  • A new method is suggested herein to measure the virgin earth stresses by means of a borehole. This novel concept is basically a combination of borehole stress relieving and borehole fracturing techniques. The destressing of the borehole is achieved by means of inducing thermal tensile stresses at the borehole periphery by using a cryogenic fluid such as Liquid Nitrogen($LN_2$). The borehole wall eventually develops fractures when the induced thermal stresses exceed the existing compressive stresses at the borehole periphery in addition to the tensile strength of the rock. The above concept is theoretically analyzed for its potential applicability to interpret in situ stress levels from the tensile fracture stresses and the corresponding borehole wall temperatures. Coupled thermo-mechanical numerical simulations are also conducted using FLAC3D, with thermal option, to check the validity of the proposed techniques. From the preliminary theoretical and numerical analysis, the method suggested for the measurement of in situ stresses appears to be capable of accurate estimation of the virgin stresses by monitoring tensile crack formation at a borehole wall and recording the wall temperatures at the time of crack initiation.