IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리 (Document Management for Jordan Research and Training Reactor Project by ANSIM)

  • 박국남;최민호;권용세
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축 (C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects)

  • 강형석;이상석;노상도;이광명
    • 한국CDE학회논문집
    • /
    • 제15권2호
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

요르단연구로건설사업 문서관리시스템 구축 (Establishment of Document Control System for the Jordan Research and Training Reactor Project)

  • 박국남;고영철;우상익;오수열;이두정
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

PROJECT MANAGEMENT STRATEGY FOR SUSTAINABLE INTEGRATION OF STADIUMS

  • Sven Schmedes
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.269-272
    • /
    • 2011
  • The impact of a new stadium on the urban context and regional development is significant. Especially where several new stadiums are built for single mega events like the Olympic Games, Commonwealth Games or the Soccer World Cup the impact is even higher. Objective of this paper is to identify and analyze the key drivers for sustainable integration of stadiums within the existing context. The level of sustainability is analyzed based on four different categories: urban, social, environmental and economics. Particular focus is on the project management strategy for implementation of the key drivers during pre-design, design and execution. In conclusion key elements of the project management strategy for sustainable integration of a stadium within the urban, environmental, social and economic context are summarized.

  • PDF

PMO 기반 프로젝트 관리 시스템의 설계 및 적용 (Design and Application of PMO-Based Project Management Systems)

  • 정천수;김승렬;김남규
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제20권4호
    • /
    • pp.119-143
    • /
    • 2011
  • Recently, Information System (IS) development projects such as the next generation IS project of the financial business domain have shown tendency to become large and complex. Accordingly, a large number of enterprises have introduced a Project Management Office (PMO) to successfully manage multiple complex large-scaled projects. Many researches and empirical studies have proved the positive results of PMO-based projects. For example, most PMO-based projects have been accomplished successfully without exceeding the planned deadline and budget. However, even in the case of PMO-based projects, participants are still supported by legacy Project Management Systems (PMS) developed without considering the PMO. It implies that recent large projects are hardly performed efficiently because of the large gap between the legacy PMS tools developed only for single small projects and the real process of PMO-based project management. Therefore, we attempt to design and develop a PMO-based PMS in which the role and responsibility of PMO are completely implemented. To demonstrate our systems practicality, we applied the devised system to the real project management cases of "K" bank in The Republic of Korea. According to the results of case analysis, all of the four projects supported by our PMO-based PMS have been completed without exceeding planned deadline and budget, and the quality of their final outcome is appraised to be superior.

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

국가 산.학.연 협력 연구개발을 위한 과제목표관리 정보시스템의 설계 및 효과 분석 (The Design & Effect Analysis of Project Objective Management Information System for National R&D cooperated by Industries, Universities and Government-supported research institutes)

  • 손권중;유왕진;이철규
    • 기술혁신연구
    • /
    • 제16권1호
    • /
    • pp.107-139
    • /
    • 2008
  • We studied how to achieve successful implementation of massive research and development projects requiring collaboration among industries, universities and government-supported research institute. We have set up an engineering process innovation model to be deemed most adequately for all practical purposes, relying on the theoretical studies on the merits and analysis of the effect of the information system based on Milestone Management, Work Breakdown Structures and Web, which is known to be effective for research project (schedule) management and the objective management, and implemented a real-world web-based project objective management system. After a review of various R & D Project Schedule Management methods, we found that this information system was very compatible with project objective management. This project objective management information system carries out research and development projects effectively and efficiently, getting together in cyber-space and sharing information, and has been equipped with an Early Warning Subsystem to allow for pre-analysis and timely response to potential problems arising from the course of the project. The system also contains an Executive Information System that in real time, automatically provides the management information required by managers with the rate of project progress (achievement, fulfillment and delay). Lastly, actual progress can be cross-checked through both on-line objective management on the web-based information system and design review meeting held on site, to improve the efficiency and validity of the information system. Moreover, overall effect was analyzed through questionnaires on how well the system and generated information meet requirements and on the ultimate impact of the system upon objective management and communication. The questionnaire on the system effect revealed that the information system was useful to objective management and communication, and that the quality of the system was more than acceptable as well.

  • PDF

UML기반의 공공부문 정보화프로젝트관리모델에 관한 연구 (A Prefect Management Model for Developing Information Systems in Public Sector with UML)

  • 옹상순;최재현;박제원;이남용
    • 한국IT서비스학회지
    • /
    • 제8권3호
    • /
    • pp.101-109
    • /
    • 2009
  • For half a century, PMM(Project Management Model) continually has been advanced by many researchers and managers. Especially, the model for civil and construct engineering has now high maturity, but the model for IT engineering has not acceptable maturity. PMI(Project Management Institute) provides the knowledge of protect management for general purpose, it is not adequate for IT prefect management without complements. In this paper, we propose IT project management model based the knowledge of PMI using UML. IT project management model provides not only functions for project planning, budgeting, design and Implement, but also the knowledge for managing IT protect efficiently. We use uses case diagrams to describe the details of the model. We expect the model to be used in management of IT project efficiently in public sector.