Since the late 1990s Korean housing authorities and private companies have been pursuing various initiatives towards sustainable neighbourhood design, however, there has been no attempt to examine their progress. This research aims to suggest a sustainability evaluation framework and analyse the progress of sustainability of a cutting edge project: Shinjung Environmentally Friendly Housing Estate Development, using that framework. The results of the analysis suggest that the project failed to make Significant progress in the sustainability evaluation criteria compared to normal projects in Korea and there exist significant barriers: economic/financial barriers; institutional/structural barriers; and implementation barriers within current planning and design practices. Most of the project's design strategies were simply adopted and used as a marketing tool without public participation, sustainability targets or benchmarking for sustainability. Furthermore, most of the responsibility for maintenance was left to residents who normally lack the knowledge, experience, interest and money to carry out such tasks. These problems cause significant concerns over the future success of the project toward sustainability. The experience of the Shinjung project also highlights the need for a more proactive central and local government stance towards sustainable neighborhood design.
Objective: This paper discussed the characteristics of service design process by comparing with product design process. Background: Service design has different design outcomes, project participants, and design constraints than product design. Method: The comparison took two perspectives: one was shorter-term, design process of a service, and the other was longer-term, process of service development. Results: It was discussed that service design process is similar in overall, but has four differences. First, the role of design is required earlier and longer in the process, which means service designers need to participate from the begging of the project to service operation. Thus service designers are required to have holistic viewpoint of the project. Second, service design requires many design expertise thus collaboration needs to be well defined and managed throughout the process. Third, since service provider has limited resources, regulations, and market competition, some service features cannot be provided. Service designers are required to know both customers' needs and functional constraints. Last, service design is highly coupled with service operation. Designing and providing service happens at the same time and evolves over time. Conclusion: Consequently it was asserted that the role of designers in service design is essential for success. In specific, the role of service design architect, who manages design process and design outcomes, is a new and important role in service design project.
Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.242-245
/
2004
Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.
Building restoration is a complex process with a high level of uncertainty. Restoration professionals can significantly benefit from the well-established discipline of project management to achieve their targets; however, available evidence shows that the use of the project management body of knowledge in restoration projects is far from the desired level. Several historical organisations have since been established with the goal of preserving and governing cultural identity, and numerous studies have supported the need of preserving architectural heritage. Many owners, investors, academics, and developers believe that it would be considerably more expensive to renovate and restore an old building than to create a new one. Although the project management process is generally recognised, the concept of project management for architectural heritage projects differs due to the uniqueness of each project. It differs from many construction projects in terms of the need for research-based practices to define scope, planning, scheduling, supervision,decision-making,and also performance. The Greco-Roman Museum in Alexandria's planning, design, and building phases are being studied with the aim of identifying and analysing the variables that contribute to project delays. Three project management pillars were established as a result of gathering this data from the project's stakeholders: the first pillar addresses time management for the existing phase and how it will be incorporated into the new extension phase; the second pillar addresses performance in relation to project management issues in the delivery of the best quality of a construction project; and the third pillar addresses the scope of the new extension because it will significantly impact the other two pillars. This paper argues that a contemporary perspective which utilizes project management tools and techniques can contribute to the conservation of architectural heritage in line with the conservation principles.
Korean Journal of Computational Design and Engineering
/
v.20
no.3
/
pp.269-280
/
2015
Although BIM has been recognized as one of the main streams that advance the construction industry worldwide, it is difficult to ensure the quality of BIM data due to the problems such as internal errors of BIM tools and lack of guidelines that enhance design quality. Such problems cause designers, constructors, and project owners to hesitate applying it to their business. The main objective of this research is to develop a BIM guide for public project owners that is to be usable at the design phase of the public projects. To meet the objective, the study invited 10 BIM experts from Korean construction industry and operated workshops with focus group interview methodology. As well, a number of BIM guidelines from the BIM advanced countries were reviewed to identify valuable contents for the guide. There are four main parts in the guide developed: BIM design procurement process guide, Request for Proposal development guide for BIM design, BIM execution plan development and evaluation guide, and BIM output and deliverables review and evaluation guide.
Park, Kook-Nam;Ko, Young-Cheol;Wu, Sang-Ik;Oh, Soo-Youl;Lee, Doo-Jeong
Journal of Korean Society of Industrial and Systems Engineering
/
v.34
no.4
/
pp.49-56
/
2011
The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.
Journal of the Korean Institute of Landscape Architecture
/
v.35
no.5
/
pp.16-28
/
2007
In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.
Won, Jong Ho;Park, So Hyun;Lee, Tae Won;Kim, Seung Chul
The Journal of Information Systems
/
v.32
no.2
/
pp.109-135
/
2023
Purpose This study is based on previous studies related to the function and operating system of the project management system for efficient project management. The purpose of the study is, first, to find out how the project performance is affected by the utilization of the project management system and the involvement of the PMO. Second, the mediating effect of implementing integrated management between the project management system and project performance is to be demonstrated. Design/methodology/approach Based on previous studies related to project management, this study designed a research model by integrating functional factors derived from project management system design studies, integrated management factors, and factors derived from PMO function studies. Findings As a result of the empirical analysis, this study first confirmed that high utilization of the project management system and high involvement of the PMO are factors that affect project performance. In addition, it was confirmed that the establishment of the system and the introduction of PMO do not guarantee project performance. Second, it was confirmed that the execution of integrated management has a mediating effect between the system and the project performance, and that the high utilization of the system has a positive effect on the mediating effect.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.