• Title/Summary/Keyword: design floods

Search Result 136, Processing Time 0.019 seconds

Derivatio of Optimal Design Flood by L-Moments and LH-Moments(II) - On the method of LH-Moments - (L-모멘트 및 LH-모멘트 기법에 의한 적정 설계홍수량의 유도(II)-LH-모멘트법을 중심으로)

  • 이순혁
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.41 no.3
    • /
    • pp.41-50
    • /
    • 1999
  • Derivatio of reasonable design floods was attempted by comparative analysis of design floods derived by Generalized Extreme Value(GEV) distribution using methods of L-moments and LH-moments for the annual maximum series at ten watersheds along Han, Nagdong. Geum, Yeongsan and Seomjin river systems, LH-coefficient of variation, LH-skewness and Lh-kurtosis were calcualted by KH-moment ration respectively. Paramenters were estimated by the Method of LH-Moments, Design floods obtained by Method of LH-Moments using different methods for plotting positionsi n GEV distribution and design floods were compared with those obtained using the Method of L-Moments by the Relative Mean Errors(RME) and Relative Absolute Errors(RAE). The results was found that design floods derived by the method of L-Moments and LH-Moments using Cunnane plotting position formula in the GEV distribution are much closer to those of the observed data in comparison with those obtained by methods of L-moments and LH-moments using the other formula for plotting positions from the viewpoint of Relative Mean Errors and Relative Absolute Errors. In viewpoint of the fact that hydrqulic structures including dams and levees are genrally using design floods with the return period of two hundred years or so, design floods derived by LH-Moments are seemed to be more reasonable than those of L-Moments in the GEV distribution.

  • PDF

Derivation of Optimal Design Flood by Gamma and Generalized Gamma Distribution Models(II) -On the Generalized Gamma Distribution Model- (Gamma 및 Generalized Gamma 분포 모형에 의한 적정 설계홍수량의 유도(II) -Generalized Gamma 분포모형을 중심으로-)

  • 이순혁;박명근;맹승진;정연수;류경선
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.2
    • /
    • pp.59-68
    • /
    • 1998
  • This study was conducted to derive optimal design floods by generalized gamma distribution model of the annual maximum series at eight watersheds along Geum, Yeongsan and Seomjin river systems. Design floods obtained by different methods for evaluation of parameters and for plotting positions in the generalized gamma distribution model were compared by the relative mean errors and graphical fit along with 95% confidence limits plotted on gamma probability paper. The results were analyzed and summarized as follows. 1. Basic statistics and parameters were calculated by the generalized gamma distribution model using different methods for parameters. 2. Design floods according to the return periods were obtained by different methods for evaluation of parameters and for plotting positions in the generalized gamma distribution model. 3. It was found that design floods derived by sundry averages method for parameters and Cunnane method for plotting position in the generalized gamma distribution are much closer to those of the observed data in comparison with those obtained by the other methods for parameters and for plotting positions from the viewpoint of relative mean errors. 4. Reliability of design floods derived by sundry averages method in the generalized gamma distribution was acknowledged within 95% confidence interval.

  • PDF

Flood Frequency Analysis by Wakeby and Kappa Distributions Using L-Moments (Wakeby 및 Kappa 분포의 L-모멘트법에 의한 홍수빈도분석)

  • Maeng, Seung-Jin;Lee, Soon-Hyuk;Lee, Hyeon-Gyu;Ryu, Kyong-Sik;Song, Gi-Heon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.5
    • /
    • pp.17-27
    • /
    • 2006
  • The objective of this study is to induce the design floods by the methodology of L-moment including test of homogeneity, independence and outlier of the data of annual maximum flood flows for 12 water level gaging stations of South Korea. To select appropriate distribution of the data for annual maximum flood flows, the distributions of Wakeby and Kappa are applied and the appropriateness is judged by Kolmogorov-smirnov (K-S) test. The parameters of selected Wakeby and Kappa distributions are calculated by the method of L-moment and the design floods are induced. Through the comparative analysis using the relative root mean square errors (RRMSE) and relative absolute errors (RAE) of design floods, the result shows that the design floods by Wakeby distribution are closer to the observed data than those obtained by the Kappa distribution.

Estimation of Design Floods Using 3 and 4 Parameter Kappa Distributions (3변수 및 4변수 Kappa 분포에 의한 설계홍수량 추정)

  • Maeng, Seung-Jin;Kim, Byeoung-Jun;Kim, Hyung-San
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.49-55
    • /
    • 2009
  • This paper is to induce design floods through L-moment with 3 and 4 parameter Kappa distributions including test of independence by Wald-Wolfowitz, homogeneity by Mann-Whitney and outlier by Grubbs-Beck on annual maximum flood flows at 9 water level gaging stations in Han, Nakdong and Geum Rivers of South Korea. After analyzing appropriateness of the data of annual maximum flood flows by Kolmogorov-Smirnov test, 3 and 4 Kappa distributions were applied and the appropriateness was judged. The parameters of 3 and 4 Kappa distributions were estimated by L-moment method and the design floods by water level gaging station was calculated. Through the comparative analysis using the relative root mean square errors (RRMSE) and relative absolute errors (RAE) calculated by 3 and 4 parameter Kappa distributions with 4 plotting position formulas, the result showed that the design floods by 4 parameter Kappa distribution with Weibull and Cunnane plotting position formulas are closer to the observed data than those obtained by 3 parameter Kappa distribution with 4 plotting position formulas and 4 parameter Kappa distribution with Hazen and Gringorten plotting position formulas.

Derivation of Design Flood by L-Moments and LH-Moments in GEV distributiion (L-모멘트 및 LH-모멘트에 의한 GEV 분포모형의 실계홍수량의 유도)

  • 이순혁;박명근;맹승진;정연수;김동주;류경식
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.479-485
    • /
    • 1999
  • This study was conducted to derived design floods by Generalized Extreme Value(GEV) distributiion for the annual maximum series at ten watersheds along Han, Nagdong, Geum , Yeongsan and Seomjin river systems. Adequency for the analysis of flood data used in this study was established by the test of Independence, Homogeneity , detection of Outliers. Coefficient of variation , skewness and kurtosis were calculated by the L-Moment, and LH-Moment ratio respectively. Parameters were estimated by the Method of L-Method of LH-Moment. Design floods obtained by Method of L-Moments and LH-Moments using different methods for plotting positions in GEV distributions and were compared with those obatined using the Method of L-Moments and LH-Moments by the Relative Mean Errors and Realtive Absoulte Errors. It was found that desgin floods derived by the method of L-Moments and LH-Moments using Cunnane plotting position foumula in the GEV distribution are much closer to those of the observed data in comparison with those obtained by methods of L-moments and LH-moments using the other formula for poltting postions from the viewpoint of Relative Mean Errors and Relative Absoulte Errors. In view of the fact that hydraulic structures indcluding dams and levees are generally usiong design floods with the return period of two hundred years or so, design floods derived by LH-Moments are seemed to be more reasonable than those of L-Moments in the GEV distribution.

  • PDF

Derivation of Design Floods by the Probability Weighted Moments in the Wakeby Distribution (Wakeby 분포모형의 확률가중모멘트기법에 의한 설계홍수량 유도)

  • 이순혁;송기헌;맹승진;류경식;지호근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.6
    • /
    • pp.63-71
    • /
    • 2000
  • The purpose of this study is to derive optimal design floods by the Wakeby distribution model using the probability weighted moments. Parameters for the Wakeby distribution were estimated by the probability weighted moments for the annual flood flows of the applied watersheds. Design floods obtained by the Wakeby and GEV distributions were compared by the relative mean errors, relative absolute errors and root mean square errors. In general, it has shown that the design floods by the Wakeby distribution using the methods of the probability weighted moments are closer to those of the observed data in comparison with those obtained by the GEV distribution.

  • PDF

Derivation of Design Floods by the Probability Weighted Moments in the Wakeby Distribution (Wakeby 분포모형의 확률가중모멘트기법에 의한 설계홍수량 유도(수공))

  • 송기헌;이순혁;박종화;맹승진;류경식;지호근
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.352-358
    • /
    • 2000
  • The objective of this study is to derive optimal design floods by the Wakeby distribution using the probability weighted moments. parameters for the Wakeby distribution were estimated by the probability weighted moments for the annual flood flows of the applied watersheds. Design floods obtained by the Wakeby and GEV distributions were compared by the relative mean errors, relative absolute errors and root mean square errors. In general, it has shown that the design floods by the Wakeby distribution using the methods of the probability weighted moments are closer to those of the observed data in comparison with those obtained by the GEV distribution.

  • PDF

Estimating design floods in ungauged watersheds through regressive adjustment of flood quantiles from the design rainfall - runoff analysis method (설계강우-유출 관계 분석법에 의한 확률홍수량의 회귀보정을 통한 미계측 유역의 설계홍수량 산정)

  • Chae, Byung-Seok;Lee, Jin-Young;Ahn, Jae-Hyun;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.9
    • /
    • pp.627-635
    • /
    • 2017
  • It is required to estimate reliable design floods for hydraulic structures in order to respond more effectively to recent climate change. In this study, differences of design floods that were estimated the flood frequency analysis (FFA) and the design rainfall-runoff analysis (DRRA) were analyzed. In Korea, due to lack of measured flood data, the DRRA method is used in practice to determine the design floods. However, assuming the design floods estimated by the FFA as true values, the DRRA method over estimated the design floods by 79%. Thus, this study proposed a practical method to estimated design flood in ungauaged watersheds through regressive adjustment of flood quantiles estimated from the DRRA method. To this end, after investigating the differences between design floods acquired from the FFA and the DRRA method, nonlinear regression analyses were performed to develop the adjustment formulas for 8 large-dam watersheds. Applying the adjustment formula, the accuracy was improved by 65.0% on average over the DRRA method. In addition, when considering the watershed size, the adjustment formula increases the accuracy by 2.1%p on average over when not considering the watershed size.

Uncertainty Analysis of Future Design Floods for the Yongdang Reservoir Watershed using Bootstrap Technique (Bootstrap 기법을 이용한 용당 저수지 유역의 미래 설계홍수량 불확실성 평가)

  • Lee, Do Gil;Kang, Moon Seong;Park, Jihoon;Ryu, Jeong Hoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.2
    • /
    • pp.91-99
    • /
    • 2016
  • To estimate design floods for hydraulic structures, statistical methods has been used in the analysis of rainfall data. However, due to the lack of rainfall data in some regions, it is difficult to apply the statistical methods for estimation of design rainfall. In addition, increased uncertainty of design rainfall arising from the limited rainfall data can become an important factor for determining the design floods. The main objective of this study was to assess the uncertainty of the future design floods under RCP (representative concentration pathways) scenarios using a bootstrap technique. The technique was used in this study to quantify the uncertainty in the estimation of the future design floods. The Yongdang watershed in South Korea, 2,873 ha in size, was selected as the study area. The study results showed that the standard errors of the basin of Yongdang reservoir were calculated as 2.0~6.9 % of probable rainfall. The standard errors of RCP4.5 scenario were higher than the standard errors of RCP8.5 scenario. As the results of estimation of design flood, the ranges of peak flows considered uncertainty were 2.3~7.1 %, and were different each duration and scenario. This study might be expected to be used as one of guidelines to consider when designing hydraulic structures.

Design Flood Estimation using Historical Rainfall Events and Storage Function Model in Large River Basins (과거강우사상과 저류함수모형을 이용한 대유역 계획홍수량 추정)

  • Youn, Jong-Woo;Lee, Dong-Ryul;Ahn, Won-Sik;Rim, Hae-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3B
    • /
    • pp.269-279
    • /
    • 2009
  • The design flood estimation in a large river basin has a lot of uncertainties in areal reduction factors, time-spatial rainfall distribution, and parameters of rainfall-runoff model. The use of historical concurrent rainfall events for estimating design flood would reduce the uncertainties. This study presents a procedure for estimating design floods using historical rainfall events and storage function model. The design rainfall and time-spatial distribution were determined through analyzing concurrent rainfall events, and the design floods were estimated using storage function model with a non-linear hydrology response. To evaluate the applicability of the procedure of this study, the estimated floods were compared to results of frequency analysis of flood data. Both floods gave very similar results. It shows the applicability of the procedure presented in this study for estimating design floods in practices.