분포형 수문모형을 이용한 유역기반의 PMF 및 유사-유출량 산정 (Watershed-based PMF and Sediment-runoff Estimation Using Distributed Hydrological Model)

  • 유완식;이기하;김영규;정관수
    • 한국농공학회논문집
    • /
    • 제60권2호
    • /
    • pp.1-11
    • /
    • 2018
  • Probable Maximum Flood (PMF) is mostly applied for the designs of large-scale hydraulic structures and it is estimated by computing the runoff hydrograph where Probable Maximum Precipitation (PMP) is inserted as design rainfall. The existing PMP is estimated by transferring the heavy rainfall from all watersheds of korea to the design watershed, however, in this study, PMP was analyzed by selecting only rainfall events occurred in the design watershed. And then, Catchment-scale Soil Erosion Model (CSEM) was used to estimate the PMF and sediment-runoff yield according to the watershed-based estimated PMP. Although the PMF estimated in this study was lower than the existing estimated PMF in the Yongdam-dam basin, it was estimated to be higher than the 200-year frequency design flood discharge. In addition, sediment-runoff yield was estimated with a 0.05 cm of the maximum erosion and a 0.06 cm of the maximum deposition, and a total sediment-runoff yield of 168,391 tons according to 24-hour PMP duration.

나팔형 여수로를 가진 기존댐의 수리·수문학적 안전성평가에 관한 연구 (A Study on Evaluation for Hydraulic and Hydrologic Safety of an Existing Dam with Morning Glory Spillway)

  • 신은우;김경덕
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.269-278
    • /
    • 2004
  • 본 연구에서는 절대적인 안전성이 요구되는 댐의 홍수방어능력을 확보하기 위해서 나팔형 여수로를 가진 기존댐에 대한 수리 수문학적 안전성을 평가하였다. 검토결과 현재의 설계홍수량인 520cms(EL. 170.30m)에 대해서는 홍수소통과 연직관의 부압발생의 문제가 없는 것으로 나타났으나, 오리피스 흐름으로 변환되는 EL. 170.70m를 초과하는 방류에는 한계가 있는 것으로 나타났으며, 웨어의 정점 부근에서 부압발생의 가능성이 있는 것으로 판단된다. 여유고를 고려한 댐최고수위는 EL. 170.5m를 넘지 않아야 하는데, 금번 저수지 홍수추적 결과 댐최고수위 EL. 172.46m로 약 2m 상회하는 것으로 나타나 이에 대한 근본적인 대책이 필요하다고 판단된다.

댐 비상방류 설계기준 선정을 위한 수리수문학적 검토(I) (Hydraulic & Hydrologic Design Criteria for an Emergency Discharge of Reservoir (I))

  • 손광익;이재응
    • 한국수자원학회논문집
    • /
    • 제48권3호
    • /
    • pp.149-158
    • /
    • 2015
  • 비상방류시설은 안전한 댐 운영 및 유지관리를 위해서 절대적으로 필요한 시설임에도 불구하고 국내 댐의 경우 이를 고려한 설계가 이루어지지 않아 각 댐의 비상방류 대응 적정성을 판단하기 곤란한 상황이다. 특히 국내 댐의 경우 비상방류시설규모를 산정하는 기준이 일정치 않을 뿐만 아니라 대부분의 용수댐은 별도의 방류시설 조차도 없는 실정이다. 따라서 본 연구에서는 기존댐 방류시설 현황 분석, 국내외 비상방류시설 설계기준 등의 검토와 함께 국내 댐설계기준을 적용한 가상 댐체와 수어댐을 대상으로 수위에 따른 방류능 분석을 수행하였다. 또한 SEEP 프로그램 등을 활용, 수위저하 속도에 따른 제체의 사면 안정성을 검토함으로써 비상방류 시설의 적정규모 산정기준을 제시하고자 하였다. 이를 위하여 수리학적 해석을 통해 저류수심에 따른 제체에 작용하는 힘을 분석하였으며 수위저하 속도 변화에 따른 제체의 안정성을 검토하여 허용수위저하 속도 범위를 제시하였다. 수위 25% 저감은 하중을 50%까지 감소시켜 초기수위 저감이 중요한 것을 알 수 있었다. 가상 댐체는 물론 수어댐에 수위저하 속도 1 m/일을 적용하더라도 제체의 안전성은 보장됨을 확인하였다. 다만, 방류능과 방류 소요일수는 수위별 저류용량 등 저류지 특성과 밀접한 관계가 있어 초기대응을 위해서는 7~10일 이내에 저류수심의 25%를 먼저 방류시키고 나머지 방류량은 1~2개월 이내에 방류할 것을 제안하였다.

Goal Programming을 이용한 홍수기 저수지 최적 운영 (Optimal Reservoir Operation Using Goal Programming for Flood Season)

  • 김혜진;안재황;최창원;이재응
    • 한국방재학회 논문집
    • /
    • 제11권2호
    • /
    • pp.147-156
    • /
    • 2011
  • 홍수기 다목적댐 운영의 목적은 홍수조절용량을 최대한 이용하여 하류 주요 지점의 첨두홍수량을 저감시키거나, 계획홍수량을 초과하지 않도록 방류량과 방류시점을 조절함으로써 홍수피해규모를 최소화하는 것이다. 따라서 홍수기 다목적댐 운영에 있어 가장 중요한 것은 최적의 방류시점과 방류량의 결정이며 이를 통해 홍수기말 이수용량을 최대로 확보 하는 점이다. 본 연구에서는 다목적 최적화기법의 하나인 goal programming을 이용하여 홍수기 저수지 최적운영을 실시하였다. goal programming은 선형계획법 또는 비선형계획법을 이용하여 두 개 이상의 목적을 가진 문제의 최적 대안을 구하기 위해, 목표값으로부터의 편차의 합을 최소화하여 최적화하는 기법이다. 홍수기 다목적댐 운영에서 goal programming의 적용성을 검토하기 위해 실제 홍수 사상을 이용하여, 단일저수지 운영과 저수지 연계운영을 실시하였다. 단일저수지 운영을 적용하기 위한 시험유역으로는 충주댐 유역을 선정하였고 저수지 연계운영을 적용하기 위한 시험유역으로는 안동댐과 임하댐 유역을 선정하였다. goal programming의 결과 분석을 위해 저수지 모의운영 모형인 HEC-5 모형의 결과와 비교, 분석하였다. 검토 결과 goal programming을 이용할 경우 홍수기 말에 저수지 수위를 홍수기제한수위로 유지할 수 있었으며 주요 지점의 홍수량을 매 시간 적절히 계획홍수량 아래로 유지할 수 있었다. goal programming을 이용한 최적 운영의 경우 전 구간의 유입량을 알고 있다고 가정한 점에서 실제 저수지 운영과는 차이가 있으나, 적절한 제약조건을 적용하고 홍수예경보를 이용하여 예보된 유입량을 활용하면 최적의 방류량 시점과 방류량을 산정하여 홍수기 다목적댐을 효율적으로 운영할 수 있으며 주요 지점의 홍수량도 저감할 수 있을 것으로 판단된다.

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

실측 자료를 이용한 국내하천의 조도계수 산정 -적용성 및 한강의 계획홍수위 검토- (Optimization for Roughness Coefficient of River in Korea - Review of Application and Han River Project Water Elevation -)

  • 김주영;이정규;안종서
    • 대한토목학회논문집
    • /
    • 제30권6B호
    • /
    • pp.571-578
    • /
    • 2010
  • 국내 3대 하천인 한강, 낙동강, 금강에 대한 조도계수 산정 결과를 바탕으로 FLDWAV 모형과 HEC-RAS 모형을 이용하여 본 연구에서 산정한 조도계수와 기존 하천정비기본계획의 조도계수 그리고 하상토 입경을 이용해 산정한 조도계수를 비교분석하고 적용성을 검토하였다. 두 모형에 적용한 바 본 연구에서 제시하고 있는 조도계수를 이용한 계산 홍수위가 관측치와 매우 잘 일치하였다. 또한 기존 선행연구의 FLDWAV 모형에 의한 조도계수와 다양한 수리특성인자와의 상관관계를 검토한 결과 상관성은 거의 없었다. 끝으로 팔당댐 하류 한강 본류에 대하여 본 연구에서 산정한 조도계수를 이용하여 HEC-2 모형으로 기존 하천정비기본계획의 계획홍수위를 검토하였으며, 기존 제방의 일부가 안전성면에서 미흡한 것으로 나타났다.

이상기후대비 노후저수지 홍수 대응을 위한 사전방류 기술개발 및 평가 (Development and assessment of pre-release discharge technology for response to flood on deteriorated reservoirs dealing with abnormal weather events)

  • 문수진;정창삼;최병한;김승욱;장대원
    • 한국수자원학회논문집
    • /
    • 제56권11호
    • /
    • pp.775-784
    • /
    • 2023
  • 최근 이상기후로 수공 구조물의 설계빈도를 상회하는 극한호우의 증가 경향이 뚜렷함에 따라 과거에 설계된 농업용 저수지의 안전성 검토가 필요하다. 그러나 한국농어촌공사 관할 일정 규모 이상의 저수지를 제외한 지자체 관리 저수지는 비상시 긴급 방류가 가능 저수지는 전무하다(13,685개소). 이러한 경우 이동식 사이펀을 현장에 빠르게 투입하여 사전 방류하는 방법이 긴요하며, 본 연구에서는 사전 및 긴급방류 기능을 동시에 수행할 수 있는 직경 200 mm, 최소 수위차 6 m, 420(m2/h), 10,000(m2/day)의 이동식 사이펀을 경주시 유금저수지를 대상으로 적용 가능성을 평가하였다. 테스트베드인 유금 저수지는 1945년 준공되어 공용기간이 78년 정도 경과한 시설물로 수문학적 안정성 분석 결과 현재 댐마루 구간의 최저높이는 27.15(EL.m)로 검토 홍수위 27.44(EL.m) 보다 0.29 m 낮아 제방을 통한 월류 가능성이 있고 여유고도 1.72 m 부족한 것으로 나타나 수문학 안전성을 확보하지 못하는 것으로 검토되었다. 유금저수지는 수위-유량 계측이 주기적으로 이루어진지 얼마 되지 않아 저수지의 수위-유량 관계 곡선식을 명확하게 확립하기 어려워 수위-용적 곡선을 임의로 도출하였으며 도출된 곡선을 기반으로 중소규모 노후저수지 운영 알고리즘을 통해 사전방류시간, 여수로 방류량을 고려하고 빈도별 홍수량에 따른 저수지 월류시간을 예측함으로써 사전에 대피 시간을 확보하고 붕괴위험을 저감할 수 있는 기술을 확보하였다. 직경 200 mm 이동식사이펀 1열 기준, 30년 빈도 홍수량 유입 시 상한수위 기준 80% 수준(약 30,000 m2)을 유지하면서 주민대피 시간(약 1시간)을 확보할 수 있는 최적 사전방류시간은 12시간 이전으로 분석되었다. 중소규모 노후저수지를 대상으로 사이펀 활용 사전방류기술 및 저수지 운영 알고리즘에 따라 이상기후 대비 사전에 방류를 시행하고 관리자의 의사결정을 돕는다면, 저수지 붕괴 위험지역 내의 주민들의 안전을 확보하고 주민대피 지원체계 구축을 통해 주민들의 불안감 해소, 저수지 위험상황 시 위험회피 수단 제공으로 위험요소 감소가 충분히 가능하다.

중소유역의 수문학적 특성이 하천유사량에 미치는 영향 (The Effects of Hydrologic Characteristics on Sediment Discharge in Streams with Small and Medium Size Watersheds)

  • 김활곤;서승덕
    • 한국농공학회지
    • /
    • 제38권3호
    • /
    • pp.127-136
    • /
    • 1996
  • The purpose of this study is to provide with information for the water resources development and management in stream management planning, such as information on the sediment trensport, design of dam and water facilities, river improvement and flood plains management. The major results obtained from the field measurement and analysis of the watershed characteristics, hydraulic and sediment characteristics are as follows ; 1. The rating curve formulas obtained from the analysis of the hydraulic characteristics data collected are ; Q-=110.563 $(H-0.474)^2$ for 0.7m$(H-0.146)^2$ for 0.4m$Sr=aX{^2} {_1} X^{c}{_2}$, in the experimental watershed.

  • PDF

다중 강우유출자료를 이용한 Clark 단위도의 Bayesian 매개변수 추정 (Bayesian parameter estimation of Clark unit hydrograph using multiple rainfall-runoff data)

  • 김진영;권덕순;배덕효;권현한
    • 한국수자원학회논문집
    • /
    • 제53권5호
    • /
    • pp.383-393
    • /
    • 2020
  • 본 연구에서는 소양강댐 유역에서의 실측 단일사상 강우-유출 자료를 활용하여 Clark 단위도 방법의 매개변수를 최적화 하였으며, 그 결과를 제시하였다. 일반적으로 국내에서는 유역특성인자 최적화 분석시 미육군공병단의 HEC-1, HEC-HMS 등의 모형을 사용하고 있다. 그러나 해당 모형의 경우 유출수문곡선의 형상, 크기 등의 재현에만 초점이 맞춰져 있으며, 산정된 매개변수들의 평균을 사용하고 있어 실제 강우-유출 관계를 묘사하는데 어려움이 존재하고 있다. 이러한 점에서 본 연구에서는 기존 Clark 합성단위도법과 계층적 Bayesian 기법을 결합하여 수집된 강우-유출 자료를 동시에 활용하여 매개변수를 산정할 수 있는 모형을 개발하였다. 본 연구에서 개발된 모형을 적용한 결과 개별 단일사상 기반의 최적화 기법에 비해 다중 강우-유출 자료를 Pooling하여 매개변수를 산정하는 계층적 Bayesian 모형에서 BIC 결과 및 다수의 통계적 지표를 통해 모형의 우수성을 확인할 수 있었다. 더불어 홍수량에 따른 유역특성인자 매개변수 반응에 대한 관계규명을 기반으로 향후 댐 설계 또는 PMF 산정시 본 연구의 결과가 활용이 가능할 것으로 판단된다.

남강의 지배유량에 대한 하도지형 및 수리 특성 분석 (An analysis on geomorphic and hydraulic characteristics of dominant discharge in nam river)

  • 김기흥;이형래;정혜련
    • 한국수자원학회논문집
    • /
    • 제49권2호
    • /
    • pp.83-94
    • /
    • 2016
  • 하도지형, 하상재료 및 수리의 특성은 치수 및 환경적 측면에서 하천의 계획, 설계 및 유지관리를 위한 기초정보이며, 이러한 정보를 안정하도 설계에 활용하는 것은 아주 중요하다. 본 연구에서는 남강댐 상류 구간에 대하여 지배유량을 산정하고, 지배유량 유하시의 하도지형 및 수리 특성을 분석하였다. 또한, 화상처리기법으로 하상재료분포 특성을 분석하였고, 하상재료와 흐름저항의 상호관계를 평가하였다. 대상구간의 지배유량은 1.5년 빈도의 유량으로 산정되었고, 하천유형은 세그먼트 1과 세그먼트 2 구간으로 분류되었다. 또한 여울-소의 출현 빈도는 4.4로 나타났는데, 이는 연구 대상구간에는 하천횡단구조물이 없는 자연하천의 특성을 가지고 있기 때문이다. 지배유량 유하시 하상재료에 의한 흐름저항을 산정하기 위하여 수심-대표입경 비($h/d_{50}$)와 평균유속-마찰력 비($V/u_*$)의 관계를 분석한 결과, 자갈-호박돌-전석이 지배적인 하상재료인 구간에서는 Julien 공식이 적합한 것으로 평가되었으며, 자갈, 호박돌 및 전석이 지배적인 하천구간에서 면격자를 이용한 화상처리기법은 향후 하상재료 분석 시 쉽게 활용할 수 있는 방법임을 확인하였다.