• Title/Summary/Keyword: delayed system

Search Result 1,133, Processing Time 0.027 seconds

Analysis on Awareness of Construction Labors about Resolution Step of the Delayed Wage Payment (임금체불 해소절차에 대한 건설근로자 인식 분석)

  • Yang, Gi Nam;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.553-560
    • /
    • 2016
  • Wage is a very important issue not only for the workers' current living but also for the future laboring landscape. As of 2014, it is reported that about 290,000 workers suffer from delay in payment of wage. The construction industry is particularly labor-intensive, which implies that delay in payment of wage is a serious problem. Despite this fact, in terms of the delayed payment of wage most studies have been conducted on the improvement of a system to resolve delayed payment in exclusion of labor workers' awareness and thinking. Thus, the purpose of this study is to understand construction labor' awareness and analyze the effectiveness of the resolution step of the delayed payment of wage based on construction labors' awareness. In the research result, more than 30 percent of all construction labors and managers are never aware of the settlement procedure of the delayed payment, and it appears that the resolution step system needs to be greatly improved. In conclusion, it is expected that this study will be utilized as fundamental data for the settlement procedure of the delayed payment, and the influence of delayed payment on construction labors' safety behavior and productivity should be further studied in the future.

Delayed state feedback controller for the stabilization of ordinary systems

  • Lee, Gi-Won;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10b
    • /
    • pp.947-950
    • /
    • 1988
  • A New type of controller for stabilization of ordinary system in which delayed states are included in feedback loop, is presented. Simple conditions are proposed for the stabilization of ordinary systems with the delayed state feedback controller. Under these conditions, controller gains can be chosen such that desired system performances are satisfied. It is shown that by using this controller the performance and robustness of the resulting closed loop system are much improved compared to the conventional memoryless state feedback controllers.

  • PDF

CONTROLLER DESIGN FOR A ROBOTIC MANIPULATOR DELAYED FEEDBACK (Delayed Feedback을 이용한 로보트 제어기의 설계)

  • ;Chyung, Dong H.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10a
    • /
    • pp.145-148
    • /
    • 1990
  • In this paper, the problem of designing a feedback controller for a robotic manipulator, which is activated by a D.C. motor through a gear train and a flexible shaft or chain, is considered. When the response of the closed loop control system is relatively slow, a satisfactory controller may be designed as a PID controller. As the speed of the control system increases, however, the spring effect of the linkage becomes profound, and as a result, the transient response exhibits a substantial oscillation. To eliminate this oscillation, it is necessary to design the controller based on at least a fourth order system model. This, in turn, requires the feedback of the entire state variables. In practice, however, only the position of the manipulator and the velocity of the motor are readily measurable. The state variable reconstruction method or a state observer cannot be used because of the system nonlinearities such as the Coulomb frictions. In this study, an alternative controller, which is based on delayed feedback of the output variable only, is proposed, and a successful delayed feedback controller is designed and implemented on an actual experimental manipulator.

  • PDF

LPG/LTR Method for Output-Delayed System (출력 시가 지연 시스템의 LQG/LTR 방법)

  • 이상정;홍석민
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.5
    • /
    • pp.827-837
    • /
    • 1994
  • This paper presents robustness propertis of the Kalman Fiter and the associated LQG/LTR method for linear time-invariant output-delayed systems. It is shown that, even for minimum phase plants, the LQG/LTR method can not recover the target loop transfer function. Instead, an upper bound on the recovery error is obtained using an upper bound of the solution of the Kalman filter Riccati equations. Finally, some dual properties between output-delayed systems and input-delayed systems are exploited.

  • PDF

FPGA Implementation and Experiment of a Time-Delayed Controller for Humanoid Robot Arm Control (다관절 휴머노이드 로봇 팔의 제어를 위한 시간지연 제어기의 FPGA 구현 및 실험)

  • Lee, Woon-Kyu;Jeon, Hyo-Won;Jung, Seul
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.7
    • /
    • pp.649-655
    • /
    • 2007
  • In this paper, a time-delayed controller for position control of humanoid robot arms is designed and implemented on a field programmable gate array(FPGA) chip. The time-delayed control algorithm is simple to implement, and robust to reject disturbances. The time-delayed control method uses the one sample time-delayed previous information to cancel out uncertainties in the system. Since the sampling time is so fast with the current hardware technology, the time-delayed controller can be implemented. However, inertia values should be correctly estimated to have the better performance. The position tracking tasks of humanoid robot arms are tested to compare performances of several control algorithms including the time-delayed controller.

The Application of Early-maturing Corn to Cropping System of Forrage Crop I. The late-sowing adaptability of corn varieties requiring the short period to maturing (조숙 옥수수에 의한 사료작물 작부체계 구성 I. 조숙 옥수수 품종의 만파적응성)

  • 임근발;양종석;한흥전;최영원
    • Journal of The Korean Society of Grassland and Forage Science
    • /
    • v.11 no.2
    • /
    • pp.137-142
    • /
    • 1991
  • For the constitution of forage cropping system including the double-cropping of corn, attention has been directed towards the early and short maturing varieties of corn such as Comet 80, Comet 85 and Linda as a component forage crop of forage cropping system. Four corn varieties, Comet 80, Comet 85, Linda and Suwon 19 were planted delayedly by each of 45, 55 and 65 days from the recommended sowing date of suwon 19. Under these condition, growth characteristics and late-sowing adaptability of 4 corn varieties were investigated, and the results are summarized as follows; 1. The variety of suwon 19 did not reach the stage of silking in the occasion of late sowing by 50 days from the optimum sowing time for mono cropping of suwon 19. However early varieties such as Comet 80, Comet 85 and Linda silked under the condition of 65 days-delayed sowing from the recommended sowing time of Suwon 19 for mono-cropping. 2. Early varieties of Comet 80, Comet 85 and Linda were so grown by approximately 92% in plant height, 66% in ear height, 88% in stem diameter and 81% in leaf number respectively compared to Suwon 19 at each of three delayed sowing time that exhibited the dwarfish appearance of canopy. 3. Days from sowing to silking decreased as the sowing time was delayed and the average days from sowing to silking in the sowing treatments of 55 days-delayed of Suwon 19, Comet 80, Comet 85 and Linda were 61, 46, 47 and 51 days, respectively. 4. The size of variations of plant height and ear height influenced by delayed-sowing time was comparatively larger in the varieties of Suwon 19 and Linda than in those of Comet 80 and Comet 85. 5. As sowing time was delayed from the optimum sowing time of Suwon 19 for mono-cropping, ear content decreased from 0% of Suwon 19 at 55 day-delayed sowing treatment to 3540% of Comet 80 and Comet 85 at 65 days-delayed sowing treatment.

  • PDF

Using the Under Voltage Load Shedding for Stability Enhancement of Power Systems Considering Induction Motor Load (유도전동기 부하 고려 시 저전압 부하차단을 이용한 전력계통 안정도 향상 방안)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.1
    • /
    • pp.1-6
    • /
    • 2016
  • Recently, proportion of the induction motor load is gradually increased. When a contingency in the power systems, it has been discovered phenomenon that the voltage is delayed recover caused mechanical characteristics of the induction motor load. It can be a serious impact on the voltage stability of the power system considering induction motor load. The scheme to mitigate this phenomenon tripping off the motors to prevent voltage drop and delayed voltage recovery on the load demand side. Fault induced delayed voltage recovery phenomenon is caused by stalling of small induction motor load in transmission level contingencies. In this paper, fault induced delayed voltage recovery phenomenon mitigation method implementation under voltage load shedding on the korean power system considering induction motor load.

TIME DELAYED CONTROLLER를 이용한 유압 시스템의 위치 제어

  • 진성무;현장환;이정오
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.10a
    • /
    • pp.204-208
    • /
    • 2001
  • Position control of the electro-hydraulic servo indexing system in a flexible forging machine was investigated Flexible forging machine forges an axial type workpiece in the radial direction as well as in the axial direction. The role of the indexing system is to rotate a workpiece fast and accurately to a desired position for continuous shaping. Since the inertia of a workpiece changes during each forging step, a control technique which is robust to inertia variation should be adopted to the position control of the workpiece. In this study, time delayed control technique is applied to the servo system. Time delayed control method does not depend on estimation of specific parameters. Rather, it depends on the direct estimation of a function representing the effect of uncertainties. Direct estimation is accomplished using time delay and the gathered information is used to cancel the unknown dynamics is accomplished using disturbances simultaneously. Experimental result show that the time delayed controller is robust to inertia variation of the load, and satisfactory performance on the sposition accuracy is obtained compared to the contentional feedback control.

Assessment on Aging Management of Delayed Neutron Monitoring System Tubing for Continued Operation of Wolsong Unit 1 (월성1호기 계속운전 관련 결함연료위치탐지계통 배관의 열화관리평가)

  • Song, Myung Ho;Kim, Hong Key;Lee, Young Ho
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.2
    • /
    • pp.14-20
    • /
    • 2011
  • The end of design lifetime for Wolsong unit 1 will be reached on 20th November in 2012. So the license renewal documents for the continuous operation of Wolsong unit 1 is under reviewing now. Major components of primary system such as pressure tubes, feeder pipes including delayed neutron monitoring system tubing are being replaced and many components of secondary system are also being repaired. In this paper, the assessment on the wear degradation of delayed neutron monitoring system tubing(on the other hand, DN tube was called) was performed for the ageing management of the same component. The wear defects of this component was one of causes that resulted in heavy water leakage accidents. Therefore design specifications of Wolsong uint 1 and heavy water leakage accidents of pressurized heavy water reactors were reviewed and causes of wear defect for DN tubes were analyzed. Wear propagation equations based on the heavy water leakage history were made and the proper repairing time was possible to be expected if the continued operation was considered. Finally design change items of DN tubes that were conducted for the long term operation of Wolsong unit 1 are introduced.

Effect of Limestone Powder on Hydration of $C_{3}A-CaSO_{4}$ $\cdot$ $2H_{2}O$ system ($C_3A-CaSO_4\cdot2H_2O$ 계의 수화반응에 미치는 석회석미분말의 영향)

  • Lee Jong-Kyu;Chu Yong-Sik
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05b
    • /
    • pp.349-352
    • /
    • 2005
  • In this work, effects of limestone powder on hydration of $C_3A-CaSO_4\cdot2H_2O$ system was discussed based on the XRD Quantitative analysis, and the possibility of Delayed Ettringite Formation was also discussed. The early hydration of $C_{3}A$ was delayed by addition of $CaCO_{3}$ powder. The delay effect was enhanced by increasing of $CaCO_{3}$ content and finer powder of $CaCO_{3}$ addition. After consumption of $CaSO_4\cdot2H_2O$, the reaction of $CaCO_{3}$ is started. Delayed Ettringite Formation would take place because monosulfoaluminate is not stable in presence of $CaCO_{3}$. In order to prevent the delayed ettringite formation in $C_3A-CaSO_4\cdot2H_2O-CaCo_3$ system, the reduction of monosulfoaluminate formation is important. Therefore, by increasing the amount of $CaCO_{3}$ addition and finer $CaCO_{3}$ powder addition, the delayed ettringite formation can be prevented.

  • PDF