• Title/Summary/Keyword: delay resolving

Search Result 24, Processing Time 0.024 seconds

Impact Analysis of Transportation Network by The Installation of Kiss & Ride Zone (Kiss & Ride Zone 설치에 따른 교통망 영향 분석)

  • Hong, Ki Man;Baek, Ba Ruem;Kim, Hyun Myung
    • International Journal of Highway Engineering
    • /
    • v.15 no.5
    • /
    • pp.145-156
    • /
    • 2013
  • PURPOSES : This research is a study on the changes in the road network of the surrounding area is installed according to the Kiss & Ride Zone. METHODS : Estimating the transportation mode of students by using the Metropolitan household Surveys(2006) and estimating the O/D by Kiss & Ride ratio with the estimated data, then being applied to a method of reducing the number of lanes for certain sections of the road which would be installed with Kiss & Ride Zone. RESULTS : The reason why it is different for delay resolving time and the affected roads as the Kiss & Ride percentage change, was the impact of the Kiss & Ride Zone's installation position. CONCLUSIONS : The purpose of the study was to analyze the impact of the road network in accordance with the installation of Kiss & Ride Zone by using speed and queue delay resolving time, and it is a need to develop a quantitative evaluation technique which was using various indicators in impact analysis according to the installation of the traffic safety facilities in the future.

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

Realization of All-Optical WDM Buffer Using Wavelength Routing (파장 라우팅 방식을 이용한 전광 WDM 버퍼 구현)

  • Choi Hoon;Eom Jin Seob
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.3A
    • /
    • pp.153-159
    • /
    • 2005
  • In this paper, we propose All-Optical WDM Buffer System for resolving the contention of Packets in Optical Packet Switching System. The proposed system consists of tunable wavelength converters based on SOA, N×N AWG, and fiber delay lines. This structure can reduce ASE and cross-talk noise because the contending packets are sent and buffered through each different path determined by a wavelength routing. We also performed buffering experiment for two contending WDM optical pulses with each 50ns width, and found that the contending problem is resolved well.

A Real-Time Synchronization Mechanism for Distributed Multimedia Applications (분산 멀티미디어 응용을 위한 실시간 동기화 메카니즘)

  • Park, Young-Sook;Lee, Syung-Won;Chung, Gi-Dong
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.12
    • /
    • pp.3785-3793
    • /
    • 2000
  • Effective synchronization specification model which can specify temrxlral relationship among media resolving asynchronous problem due to variable network delay is necessary in a distributed multimedia system. Therefore in this paper, we propose RTPN(Real- Time Petri Net) synchronization specification model based on Petri Net for multimedia application in a distributed real time environment. The proposed RTPN model supplies a tlexible decsription of the temporal relationship among various media objects by defining primary key media and relative key media according to delay and importance among media. Firing rule is instantly executed by firing function based on QoS values which supports intra-media and inter-media syncbronization. And asynchronous control algorithm for resynchronization of presentation level is possible more effective supporting of QoS.

  • PDF

Development of Primer Spouting Equipment to Secure Quality (품질확보를 위한 프라이머 뿜칠장비 개발)

  • Kim, Han-Sic;Ha, Jung-Soo;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.237-238
    • /
    • 2023
  • When primer is applied manually, adhesion performance decreases due to a decrease in primer penetration performance on the surface, and construction period delay may occur due to a long time due to a decrease in work efficiency when a large area is worked using a conventional roller. In addition, in the case of the roller method, precision work in corners and narrow spaces is not possible, so it is urgent to come up with measures to ensure uniform quality. In addition, secondary work occurs to remove fine powder from the surface before primer application, resulting in construction period delay due to the rise of the working stage. Therefore, in this study, equipment was used instead of manual work for primer work, and as a result, penetration performance and adhesion performance were improved about twice. From these results, it was confirmed that favorable results such as improving work speed, securing high quality, improving the working environment, and resolving the shortage of functional workers can be obtained.

  • PDF

Delayed use of Operating Rooms in a University Hospital (한 대학병원의 수술실 이용 지연요인과 개선방안에 관한 연구)

  • Kim, Kyung-Ae;Yu, Seung-Hum;Kim, In-Sook;Sohn, Tae-Yong;Park, Eun-Cheol
    • Korea Journal of Hospital Management
    • /
    • v.7 no.3
    • /
    • pp.44-62
    • /
    • 2002
  • Advanced surgical technology demands more precise, meticulous, and time-consuming procedures. In addition, the patient's preference of tertiary health providers makes over crowding of the University Hospitals. Therefore, it has been necessary to maximize utilization of the operating room of such hospitals to accommodate these requirements. This study, targeting 1,302 surgical cases performed in 22 operating rooms at a university hospital in Seoul from October 8 to November 1, 2001, analyzed reasons for delay, and factors that caused delayed use of operating rooms. This study also assessed that the rate of operating room use would increase if the sources for possible reform were improved. 1. Among total of 1,302 cases of surgery, the incidence of surgeries in which there were no time delays and no factors for delay were discovered is 71.4% or 930 cases: the incidence in which surgeries were delayed was 28.6% or 372 cases. 2. As results of logistic regression for delay, procedures involving women were delayed 1.4 times more frequently than those of men. Compared to Department A, Department B was 1.8 times more likely to be delayed, and Department H was 0.4 times less likely to be delayed. Regional anesthesia was 2.4 times more likely to be delayed than general anesthesia, and surgeries that PCA was applied were 0.6 times less likely to be delayed than those when it was not. Surgeries performed on the Thursday were 1.7 times more likely to be delayed than those performed on the Monday. Compared to surgeries performed between 07:00-07:59, those performed between 08:00-08:29 were 4.3 times higher. 3. The reasons for delay were related to surgeon, surgical department, patient, anesthesia, administrative system, sick ward, and support services. Among these, 5,755 minutes for 276 delayed cases could be resolved easily, and resolving delays of 3,320 minutes for 131 cases would be more difficult. Among the causes for delay that could be improved, delays due to patient's transfer and surgeon's factor were the most common, 21.6% and 17.4% respectively. 4. If resolvable delays are improved, pre-anesthesia room is administered, and regional anesthesia and PCA are done ahead of time, use of emergency operating rooms will increase, we can increase overall utilization by 4.09%, we will save 744 minutes a day, we can reduce the time the operation room is used after 4 PM by 35%, and we can resolve the operation cancellations due to insufficient operating rooms. For the increase in the use of operating rooms, we need to maximally decrease the delays that could be improved, by allocating block time based on used totals hours of elective cases, giving accurate information on surgery schedule, voluntary cooperation by staff participating in surgeries in reducing delay time, and the hospital management's will to improve delay.

  • PDF

Design of a High-Level Synthesis System for Automatic Generation of Pipelined Datapath (파이프라인 데이터패스 자동 생성을 위한 상위수준 합성 시스템의 설계)

  • 이해동;황선영
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.31A no.3
    • /
    • pp.53-67
    • /
    • 1994
  • This paper describes the design of a high-level synthesis system. SODAS-VP. which automatically generates hardwares executing operation sequences in pipelined fashion.Target architecture and clocking schemes to drive pipelined datapath are determined, and the handling of pipeline hazards which degrade the performance of pipeline is considered. Partitioning of an operation into load, operation, and store stages, each of which is executed in partitiones control step, is performend. Pipelinecl hardware is generated by handling pipeline hazards with internal forwarding or delay insertion techniques in partitioning process and resolving resource conflicts among the partitioned control steps with similarity measure as a priority function in module allocation process. Experimental results show that SODAS-VP generates hardwares that execute faster than those generated by HAL and ALPS systems. SODAS-VP brings improvement in execution speed by 17.1% and 7.4% comparing with HAL and ALPS systems for a MCNC benchmark program, 5th order elliptical wave filter,respectively.

  • PDF

Comparative Legal Study on the Arbitral Award under Arbitration Laws in Northeast Asian Nations (동북아국가들의 중재법상 중재판정의 비교법적 고찰)

  • Choi, Seok-Beom
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.27
    • /
    • pp.29-65
    • /
    • 2005
  • Northeast Asian economies have achieved high levels of growth due to a stable economic environments and economic policy reforms for free trade. As Northeast Asia has been risen as big bloc in the world and in the future in case free trade agreement could be concluded, trade volume could be increased dramatically. And it is evident that disputes will be increased in Northeast Asian economic bloc. Arbitration must be popular in resolving international commercial disputes in Northeast Asian bloc in order to increase the volume of intra-trade in the bloc. Through arbitration, the parties can have full autonomy and can resolve disputes independently, impartially and without delay. But in order for the parties to make use of arbitration in the bloc, they must be fully aware of the arbitration laws of Northeast Asian nations in view of the similarity and difference of the laws. Therefore, this paper deals with arbitral award in Northeast Asian Nations' arbitration laws in view of comparative law.

  • PDF

A Method for the Performance Ehancement of PRMA Protocol for Mobile Voice/Data Integration (음성/데이터 통합형 PRMA 프로토콜의 성능 개선 기법)

  • 송재섭;김연수
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.3B
    • /
    • pp.423-430
    • /
    • 2000
  • Future microcellular systems will require distributed network control. A packet-switched network is suitable for this requirement. The packet reservation multiple access(PRMA) is a Reservation-ALOHA like protocol for wireless terminals to transmit packet speech to a base station. It allows spatially distributed users in cellular systems to transmit packeted voice and data to a common base station using a shared channel. In the existing PRMA, the problem is that the voice packets may collide with the data packets due to simultaneous channel access. the problem may be a major performance degradation factor to a voice and data mixed system. We propose a new PRMA method that integrates voice and data traffic efficiently by resolving the collision problem between data and voice packets. The proposed PRMA method gives a performance improvement than the existing PRAMA method in terms of voice packet dropping probability and data delay characteristic. From analytic results, we can confirm that the proposed PRMA method show a performance improvement than the existing PRMA protocol.

  • PDF

Direct Time-domain Phase Correction of Dual-comb Interferograms for Comb-resolved Spectroscopy

  • Lee, Joohyung
    • Current Optics and Photonics
    • /
    • v.5 no.3
    • /
    • pp.289-297
    • /
    • 2021
  • We describe a comb-mode resolving spectroscopic technique by direct time-domain phase correction of unstable interferograms obtained from loosely locked two femtosecond lasers. A low-cost continuous wave laser and conventional repetition rate stabilization method were exploited for locking carrier and envelope phase of interferograms, respectively. We intentionally set the servo control at low bandwidth, resulting in severe interferograms' fluctuation to demonstrate the capability of the proposed correction method. The envelope phase of each interferogram was estimated by a quadratic fit of carrier peaks to correct timing fluctuation of interferograms in the time domain. After envelope phase correction on individual interferograms, we successfully demonstrated 1 Hz linewidth of RF comb-mode over 200 GHz optical spectral-bandwidth with 10-times signal-to-noise ratio (SNR) enhancement compared to the spectrum without correction. Besides, the group delay difference between two femtosecond pulses is successfully estimated through a linear slope of phase information.