In this paper under the distributed system for efficient distribution resource to system's each node must be designed to get right decision making. Thus we considered computing time to estimate fault such as delay on communication network, communication period and other decision making. Aiso, using direct communitation mode improve the availity of total system.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.185-188
/
2009
Recently clients requirements and social requirements are complex and large sized in construction projects. Futhermore, processes and steps are more complexed than before. Unsuitable reflection of clients brings mistaken opinions. A phase of middle change makes delay and change. It brings problems of waste expense and time. 80, first stage of planning and schematic design processes have to reflect of clients opinion actively. by increasing of constructions project competitiveness. Recently, BIM(Building Information Modeling is being researched frequently. Through visualization of information proceed step by step and it helps cognition of adapting information. 80, this paper finds and suggests solution of reflecting clients opinion and requirements and non professional clients and positively support of client participation watching based on BIM.
Journal of Korean Academy of Dental Administration
/
v.10
no.1
/
pp.1-8
/
2022
This study introduces research on the quality of medical services, optimization of medical services, dental medical services, implant medical services, and time schedules, as well as the effective process of dental implant medical services, which is expensive and requires a long treatment period. For improvement, it is suggested to evaluate using a time schedule. In this method, a time schedule is prepared in which each step, starting from the patients appointment until the completion of the treatment process, is allotted a certain time. This schedule was finalized in consultation with the employees. When performing all implant operations, the starting time of each item was checked to evaluate the degree of compliance and to understand any reasons for delay in each step. After identifying the causes for delay at each step, suitable steps to rectify the drawbacks were developed, and an optimal plan for patient management was determined. Changes in waiting time and human resource utilization were shown as concrete data, suggesting that such a schedule is meaningful as a decision-making support tool.
This paper deals with on the efficiency questions of the left-turn prohibit at an isolated intersection and a corridor with 5-phase signal system. Its objectives are three-fold ; (1) to analyze the efficiency of the left-turn prohibit with the use of an imaginary network, (2) to evaluate various factors under consideration in decision making on the left-turn prohibit, (3) to provide a framework for estimating and evaluating overall impacts of the left-turn prohibit in traffic network. the major findings using an imaginary network and computer packages such as MINUTP, TRANSYT-7F and STATGRAPH are followings. First, left-turn prohibit reduces cycle length by 33 seconds and delay time per vehicle by 36 seconds at an isolated intersection, and cycle length by 31 seconds and delay time per veicle by 43 seconds along a corridor. Second, total vehicle mile of travel and total travel time at an isolated intersection seem up to increase 38.85 miles(57.36km), 14.4 hour on the average, Regarding to a corridor, total vehicle mile of travel is increased by 50.14 miles(80.22km), but total travel time is decreased by129.9 hours. Third, the efficiency of left-turn prohibit are affected the following eight factors including left-turn volume(veh/hr) and ratio(%), average delay time per vehicle(sec/veh) and others. Finally, several simple and multiple regression models to evaluate the impacts on the left-turn prohibit are formulated from the above eight factors. It can be expected that these models will take an important role in decision-making of left-turn prohibit.
The purpose of this study was to identify the effects of the delay reasons in consumer decision making on experienced emotion and shopping mall satisfaction under the Internet shopping environment. A survey was conducted for this study and 500 answer sheets were analyzed using structural equation modeling. The results are as follows: First, performance risk, financial risk, and social risk significantly have a positive effect on negative emotions for Internet shopping. Second, performance risk has a significant negative effect on positive emotions for Internet shopping. Third, social risk and procedural uncertainty significantly have a positive effect on positive emotions and this shows these reasons are related to pleasure and fun. Forth, needs uncertainty has a negative effect on negative emotions for Internet shopping. Finally, positive and negative emotions that consumer experienced for Internet shopping affect Internet shopping mall satisfaction.
Journal of the Korean Society of Marine Environment & Safety
/
v.25
no.6
/
pp.698-707
/
2019
The removal of oil spilled by the sinking of a foreign ship in Korea's Exclusive Economic Zone (EEZ) began in May 2019 four years after the ship sunk near Jeju Island. The cleanup was conducted by a foreign company that was contracted to the ship-owner's protection & indemnity (P&I) insurance company. In contrast to the time taken to begin the cleanup, the operation itself was completed in just 22days. Compared to similar cases, the decision to begin the removal was a delayed one. This study analyzes all 93 documents related to the ship's sinking and the eventual cleanup, confirming delays in administrative decision-making on the removal, and identifies factors that influenced this delay. These factors include a neglect of accident-related data verification, and other, legal, technical, environmental, and human aspects. Finally, this study suggests ways to improve decision-making efficiency. As the first study dealing with the cleanup in the EEZ, this research is expected to facilitate decision-making and influence the formulation of policies in the future.
In this study, we figured out that music modes and item types could affect people's urged decision making through a k-value which results from a delay discounting's hyperbolic function. Generally, high k-value is related to impulsive decision making. Concretely, there was a significant interaction between items and music. For the luxury item, the k-value was higher while listening to major music than minor. However, for the non-luxury item condition the k-value difference was not significant between two pieces of music. Moreover, we expected mood could be manipulated after listening to the music and mediate a difference of tendency. We used first movement as an allegro and second as an andante of Mozart piano concerto No.5 D-major and No.20 D-minor for stimuli. As a result, mode and tempo's main effects were not significant. Nevertheless, there was a significant two-way interaction. To put it concretely, the k-value of major condition was marginally higher than minor condition on allegro. However, the k-value of major condition was significantly lower than minor condition on andante. Also, depressed degree difference was significant but it was not significant as a mediator. Set depressed degree as a predict variable and future time span as a mediator, further research found future time perception partially mediated the effect that depressed degree affects impulsivity.
Yun, Ilsoo;Oh, Cheol;Ahn, Hyunkyung;Kim, Kyunghyun;Han, Eum;Kang, Nam Won;Yoon, Jung Eun
International Journal of Highway Engineering
/
v.16
no.5
/
pp.109-119
/
2014
PURPOSES : The control delay in seconds per vehicle is the most important traffic operational index to evaluate the level of service of signalized intersections. Thus, it is very critical to calculate accurate control delay because it is used as a basic quantitative evidence for decision makings regarding to investments on traffic facilities. The control delay consists of time-in-queue delay, acceleration delay, and deceleration delay so that it is technically difficult to directly measure it from fields. Thus, diverse analysis tools, including CORSIM, SYNCHRO, T7F, VISTRO, etc. have been utilized so far. However, each analysis tool may use a unique methodology in calculating control delays. Therefore, the estimated values of control delays may be different by the selection of an analysis tool, which has provided difficulties to traffic engineers in making solid judgments. METHODS : This study was initiated to verify the feasibility of diverse analysis tools, including HCM methodology, CORSIM, SYNCHRO, T7F, VISTRO, in calculating control delays by comparing estimated control delays with that measured from a field. RESULTS : As a result, the selected tools produced quite different values of control delay. In addition, the control delay value estimated using a calibrated CORSIM model was closest to that measured from the field. CONCLUSIONS : First, through the in-depth experiment, it was explicitly verified that the estimated values of control delay may depend on the selection of an analysis tool. Second, among the diverse tools, the value of control delay estimated using the calibrated microscopic traffic simulation model was most close to that measured from the field. Conclusively, analysts should take into account the variability of control delay values according to the selection of a tool in the case of signalized intersection analysis.
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.120-129
/
2016
The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.
International conference on construction engineering and project management
/
2020.12a
/
pp.50-59
/
2020
The 21st century is witnessing a rapid growth of tall buildings in urban centers globally to create more urban space for an anticipated urban population. Tall buildings, however suffer from incessant delays and sometimes total abandonment. Consequently, this study investigated and ranked the causes of delay in tall building projects, while focusing on the Gulf Cooperation Council (GCC) countries. Initially, 36 common delay causes investigated globally were categorized into 9 groups, and then further ranked utilizing the Relative Importance Index (RII) through a questionnaire survey. Tall building professionals in the GCC countries (Saudi Arabia, United Arab Emirates, Bahrain, Kuwait, Oman and Qatar) were contacted. The respondents' categories include Consultants, Contractors, and Clients' Representatives/Facility Managers. The results reveal that the top three causes include "client's cash flow problems/delays in contractor's payment", "contractor's financial difficulties", and "poor site organization and coordination between various parties". The findings from this study could help construction professionals develop guidelines and controls for delay mitigation, as well as support them in risk-based decision making in the planning of tall building projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.