• Title/Summary/Keyword: data base construction

Search Result 503, Processing Time 0.025 seconds

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Data Base Construction of Representative Practical Colors of Domestic Fashion Industry in Korea (국내 패션업계에서 활용되는 대표색의 Color Data Base 구현)

  • Choo Sunhyung;Cho Ju-Yeon;Kim Youngin
    • Journal of the Korean Society of Costume
    • /
    • v.55 no.8 s.99
    • /
    • pp.144-153
    • /
    • 2005
  • The purpose of this study is to make a Web Color Data Base for practical design system for domestic fashion industry. The market segmentation was based on the results of the previous studies and the characteristics of fashion consumers. Finally, the 14,121 color samples are collected from the survey of 55 manufacturers of domestic fashion industry and 116 fashion brands of major department stores. These color samples are analyzed by the Munsell's H V/C and CIE L*a*b* value. The representative colors are selected concerning the density in CIE L*a*b* color space and the distance between the color samples. As a result, We suggested 2213 representative colors. Also, this color data was constructed on Web site. The data were sorted by the market, season and color code. In addition, the representative color sample book was made for the prototype of .

Electrical Fire Cause Diagnosis System based on Fuzzy Inference

  • Lee, Jong-Ho;Kim, Doo-Hyun
    • International Journal of Safety
    • /
    • v.4 no.2
    • /
    • pp.12-17
    • /
    • 2005
  • This paper aims at the development of an knowledge base for an electrical fire cause diagnosis system using the entity relation database. The relation database which provides a very simple but powerful way of representing data is widely used. The system focused on database construction and cause diagnosis can diagnose the causes of electrical fires easily and efficiently. In order to store and access to the information concerned with electrical fires, the key index items which identify electrical fires uniquely are derived out. The knowledge base consists of a case base which contains information from the past fires and a rule base with rules from expertise. To implement the knowledge base, Access 2000, one of DB development tools under windows environment and Visual Basic 6.0 are used as a DB building tool. For the reasoning technique, a mixed reasoning approach of a case based inference and a rule based inference has been adopted. Knowledge-based reasoning could present the cause of a newly occurred fire to be diagnosed by searching the knowledge base for reasonable matching. The knowledge-based database has not only searching functions with multiple attributes by using the collected various information(such as fire evidence, structure, and weather of a fire scene), but also more improved diagnosis functions which can be easily wed for the electrical fire cause diagnosis system.

A Function-Based Knowledge Base for Technology Intelligence

  • Yoon, Janghyeok;Ko, Namuk;Kim, Jonghwa;Lee, Jae-Min;Coh, Byoung-Youl;Song, Inseok
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.1
    • /
    • pp.73-87
    • /
    • 2015
  • The development of a practical technology intelligence system requires a knowledge base that structures the core information and its relationship distilled from large volumes of technical data. Previous studies have mainly focused on the methodological approaches for technology opportunities, while little attention has been paid to constructing a practical knowledge base. Therefore, this study proposes a procedure to construct a function-based knowledge base for technology intelligence. We define the product-function-technology relationship and subsequently present the detailed steps for the knowledge base construction. The knowledge base, which is constructed analyzing 1110582 patents between 2009 and 2013 from the United States Patent and Trademark Office database, contains the functional knowledge of products and technologies and the relationship between products and technologies. This study is the first attempt to develop a large-scale knowledge base using the concept of function and has the ability to serve as a basis not only for furthering technology opportunity analysis methods but also for developing practical technology intelligence systems.

Standardization of the Work Classification System in Spatial Data Construction - Laying Stress on the Basic Surveying - (공간데이터 구축의 공종분류체계 표준화 - 기본측량을 중심으로 -)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Kim, Sung-Soo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.2 s.36
    • /
    • pp.69-75
    • /
    • 2006
  • This study aims to standardize the work classification system in spatial data. It is the base frame to classify the general information systematically in spatial data construction process. Work process of the surveying firm and rules for basic surveying which is being accomplished in the NGII(National Geographic Information Institute) are investigated and analysed. Therefore, types, individual process, and results of surveying work is standardized. If the work classification system from this study is adopted as the national standard and is also advanced by construction methodology, the spatial data will be managed futuristically and systematically.

  • PDF

A Study on the Strength of Concrete Filled Tubular Columns according to Data-Base (Data Base에 의한 CFT 기둥의 내력에 관한 연구)

  • Seo, Jeong-Hwan;Yang, Young-Sung
    • Journal of Korean Society of Steel Construction
    • /
    • v.13 no.1
    • /
    • pp.71-79
    • /
    • 2001
  • The concrete filled tubular(CFT) columns have many excellent structural properites. such as high compressive strength high ductility and high absorption capacity However the confinement effect and limiting width-thickness ratio of CFT column have not yet been clarified. Therefore. this paper aims to clarify the confinement effect of steel tubes and strength of concrete filled steel tubular columns. And this paper presents results of a probabilistic analysis based on statistical data for strength of concrete filled steel tubular columns which has been tested in Korea for recent 10 years(1991.1~2000.6).

  • PDF

The Architecting and Interface Management and for Standard and Regulation of Urban Transit System (도시철도시스템의 표준화기준 아키텍쳐 구축 및 인터페이스 관리방안 연구)

  • Lee, Wool-Dong;Chung, Jong-Duk;Kim, In-Goo
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1235-1240
    • /
    • 2011
  • Urban transit system consist of complex system such as vehicle, signal, train control equipment, railway facilities, electricity facilities, station facilities and information & communications facilities. So a study on construction of management system for complex system. using system-engineering tool, Urban transit standardization of steps 2 perform architecture for urban transit standardization, requirement management and data-base construction. A study expect that provide more efficient and methodical information system to all user for using standardization.

  • PDF

The Study on Long-Term Monitoring System of Bridge (교량의 상시감시 시스템 구축에 관한 연구)

  • 박승범;조광연;홍석주;최상필
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.813-818
    • /
    • 1999
  • The construction of large scale civil and building structures which form the base of social economy has been grown greatly. As the increasing of aged and deteriorated structures, it is necessary to evaluate the safety of those structures. The deterioration, safety evaluation, repair and rehabilitation are important problems in the construction area that every country faces. This paper presents the general information on how to conduct a data analysis of long-term monitoring system and evaluate the characteristics of surveying methods.

  • PDF

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.