• Title/Summary/Keyword: damage recovery

Search Result 724, Processing Time 0.029 seconds

Ingestion of Korean Red Ginseng after Noise Exposure Can Potentiate Rapid Recovery of Hearing in Mice

  • Kang, Woo-Seok;Chung, Jong-Woo
    • Journal of Ginseng Research
    • /
    • v.34 no.4
    • /
    • pp.336-341
    • /
    • 2010
  • One mechanism of inner ear damage by noise-induced hearing loss (NIHL) is the production of reactive oxygen species (ROS). Because Korean red ginseng (KRG) has an anti-ROS effect in various tissues, KRG may have a role in preventing NIHL. A window period exists in which ROS formations continue after noise exposure, and further damage can be prevented by antioxidants. In this study, we aimed to investigate the effects of KRG after exposure to noise. KRG (200 mg/kg) was fed to mice for 3 days after noise exposure. The change in hearing level was analyzed by measuring the auditory brainstem response. To induce a temporary threshold shift (TTS) of hearing, mice were exposed to 110 dB white noise for 3 hours. Fast recovery of hearing was observed in mice fed KRG 1 hour and 1 day after noise exposure for 3 days. The expression of 8-oxoguanine was not observed in the inner ears of mice fed KRG 1 hour after noise exposure, but was evident in the stria vascularis of mice in the control group (noise exposure only). From this study, we conclude that KRG acted as an effective inhibitor of NIHL in TTS cases.

Monitoring of Vegetation Recovery According to Natural and Artificial Restoration Methods After Forest Fire Damage Using Satellite Imagery (위성영상을 이용한 산불피해 이후 자연복원과 인공복원 방법에 따른 식생회복 모니터링)

  • Hwang, Yeong In;Kang, Won Seok;Park, Ki Hyung;Lee, Kyeong Cheol;Han, Sang Gyun;Kweon, Hyeong Keun
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.24 no.3
    • /
    • pp.33-43
    • /
    • 2022
  • This study was conducted to monitor the vegetation recovery in the areas damaged by the forest fires on the east coast that occurred in April 2000. The study site was a forest fire-damaged area in Samcheok-si, Gangwon-do, and 21 monitoring areas (12 natural restoration sites, 9 artificial restoration sites) were selected to analyze the vegetation recovery trend since 1998. The vegetation recovery trend was compared by calculating the values according to the year using the difference Normalized Burn Ratio (dNBR) and Normalized Difference Vegetation Index (NDVI) based on satellite images (Landsat TM/ETM+ and Sentinel-2A). As the result of this study, all 21 sites, vegetation was recovered, and both groups showed the greatest recovery in summer. In the case of the dNBR, the artificial restored sites showed higher values than the natural restored sites, and in the case of the NDVI, the natural restored sites were higher than the artificially restored sites in summer and autumn. However, the difference between the two groups of natural and artificial restoration sites was not significant. Therefore, the direction of forest restoration after forest fire damage can be effectively restored if properly implemented for the purpose of restoration of the target site.

Dopant Activation and Damage Recovery of Ion Shower Doped Poly-Si According to Various Annealing Techniques

  • Park, Jong-Hyun;Kim, Dong-Min;Ro, Jae-Sang;Choi, Kyu-Hwan;Lee, Ki-Yong
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2003.07a
    • /
    • pp.149-152
    • /
    • 2003
  • Soruce/drain (or, LDD) formation technology is critical to device reliability especially in the case of short channel LTPS-TFT devices. Ion shower doping with a main ion source of $P_2H_x$ was conducted on ELA Poly-Si. We report the effects of annealing methods on dopant activation and damage recovery in ion-shower doped poly-Si.

  • PDF

Damages, Human Behaviour and Recovery of Urban Residents in the 2005 West off Fukuoka Earthquake

  • Murakami, H.
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.13-18
    • /
    • 2008
  • The 2005 west off Fukuoka earthquake with Mjma 7.0 occurred in the vicinity of Fukuoka city with 1.4 million populations, which had been regarded as rather seismically inactive in Japan. The strong motion records by K-net indicated PGV of 64 cm/s in Fukuoka city and some condominium buildings sustained extensive non-structural damages. In this study, we conducted a questionnaire survey for residents of 8 condominium buildings located in the downtown area of Fukuoka city after the earthquake. The results indicate that damaged nonstructural walls and distorted doors disrupted evacuation route for many occupants, and furniture and content damage on upper floors became severer resulting in higher rates of human casualty. Earthquake preparedness for indoor safety was raised after the earthquake, though further safety measures can be advised. In the phase of post-earthquake emergency and restoration period, residents' management organizations play important roles, so that neighborhood activities to promote communication networks are important in urban environment with aging population.

  • PDF

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Mortality in Pine Stand and Vegetation Recovery after Forest Fire (산불발생 후 소나무 피해 및 식생복원 실태분석)

  • Lee, Si-Young;Jun, Kye-Won;Lee, Myung-Woog;Chun, Kun-Woo
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.71-79
    • /
    • 2008
  • To find out the effect of the vegetation recovery and the problems of forest land, the researches of the mortality in pine stand and vegetation recovery have been carried out from the burned site. In area which is damaged by fire scar on crown and stem, rate of dead is higher. Where stand growing stocks were totally damaged by crown forest fire, most of vegetation was recovered by sprouts and planted seeds. Vegetation recovery power were depending on the condition of soil depth condition. For the artificial recovery, the damage happened by insects in the planted birches plantation. Rate of growth was somewhat different between Pinus densiflora and Pinus thunbergii in the plantation, because of individual growth rate.

Monitoring of Forest Burnt Area using Multi-temporal Landsat TM and ETM+ Data

  • Lee, Seung-Ho;Kim, Cheol-Min;Cho, Hyun-Kook
    • Korean Journal of Remote Sensing
    • /
    • v.20 no.1
    • /
    • pp.13-21
    • /
    • 2004
  • The usefulness of the multi-temporal satellite image to monitoring the vegetation recovery process after forest fire was tested. Using multi-temporal Landsat TM and ETM+data, NDVI and NBR changes over times were analyzed. Both NDVI and NBR values were rapidly decreased after the fire and gradually increased for all forest type and damage class. However, NBR curve showed much clearer tendency of vegetation recovery than NDVI. Both indices yielded the lowest values in severely damaged red pine forest. The results show the vegetation recovery process after forest fire can detect and monitor using multi-temporal Landsat image. NBR was proved to be useful to examine the recovering and development process of the vegetation after fire. In the not damaged forest, however the NDVI shows more potential capability to discriminate the forest types than NBR..

Study on Disaster Prevention and Monitoring System for Forest Fire Using Multi-Source GSIS Data (GSIS 다증자료를 이용한 방재 탐지체계에 관한 연구)

  • Lee Kang-Won;Kang Joon-Mook
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.319-326
    • /
    • 2006
  • All around tile world there has been great human and economical damage continuously by disasters like the earthquakes and storms(Tsunami) in eastern asia which recently occurred, and like the New Orleams hurricane in USA. The situation is our countries damage from natural disasters due to heavy snow, storms, forest fires have been increasing In this research we obtained GSIS data of the 05' Yang-yang forest fire disaster area using multi-sensors like airborne laser data, GPS/INS, aerial photograph surveying. In result we produced digital topographical maps, digital elevation models, digital external models, digital images, infrared images. By, analyzing and comparing with past aerial photography we obtained the exact damage area, amount of damage, estimated tile areas where a landslide might occur, and we analyzed vegetations amount of damage and possibility of recovery.

  • PDF

A New Energy Recovery Snubber for Boost Converter (부스트 컨버터용 새로운 에너지재생 스너버)

  • 김만고;김진환
    • Proceedings of the KIPE Conference
    • /
    • 1997.07a
    • /
    • pp.124-130
    • /
    • 1997
  • The main switch of high-frequency boost converter may be failed because the high switching current or voltage can damage this switch. The high switching stress can be reduced by snubber circuit. In this paper, a new passive snubber circuit which can recover trapped snubber energy without added control is proposed for boost converter. The control of boost converter with proposed snubber is the same as the conventional one. In addition, the energy recovery circuit can be implemented with a few passive components. The analysis for proposed circuit is presented, and the validity of the circuit is verified through simulation and experiment.

  • PDF

A Case Study on Local-Based Community Recovery Program in Disaster Affected Areas (재난피해지역 내 지역사회기반 공동체 회복 프로그램 사례 연구)

  • Lee, Young Uk;Nam, Dong Yup;Jeong, Hye Min;Park, Sang Hyun;Lee, Ji Hyang
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.106-114
    • /
    • 2020
  • The two major trends that have emerged in recent years in relation to disaster recovery and recovery are 'regional infrastructure', 'regional leadership' and 'community recovery'. In the former case, it is to avoid disaster recovery and recovery by using external personnel and resources, and to maximize the resources in the area under the initiative of the residents of the affected area. And through this process, it is to prepare a new growth engine for disaster-affected areas. In addition, the latter expands disaster recovery targets to the general population living in affected areas and is not limited to victims. Through this, we can expect to recover the 'community' beyond the individual's recovery. In the Ansan of Gyeonggi-do, where many families of 'Sewolho' live, and in the Heunghae-eup of Pohang, Gyeongbuk-do, where the damage was severe, projects are underway to restore communities. And In these areas local activists and civic groups are actively utilized to efforts are being made to increase efficiency. Nevertheless, in the case of the community recovery program being promoted in Korea, there are limitations that it can be promoted only on the basis of special laws and that participation of various actors is necessary. This study intends to propose the limitations of current projects and ways to solve them by analyzing domestic and foreign cases related to the community recovery program for disaster-affected communities using local resources. we suggest two way. One is the relaxation of the national dependence of the community recovery program, and the other is to expand the area of disaster relief through.