• Title/Summary/Keyword: dam watershed

Search Result 453, Processing Time 0.029 seconds

Spatial Analysis of BOD Data in Namgang-Dam Watershed for TMDLs (오염총량관리를 위한 남강댐유역 BOD 자료의 공간특성 분석)

  • Kim, Sang-Min;Kim, Sung-Min;Park, Tae-Yang
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.3
    • /
    • pp.81-88
    • /
    • 2010
  • The purpose of this study is to analyze the spatial characteristics of Namgang-Dam watershed for a Total Maximum Daily Loads (TMDL). Three TMDL target sites, Gyeonghogang1, 2, Namgang-Dam2, are located within Namgang-Dam watershed. Under the current criterion for TMDLs, 3-year arithmetic mean BOD concentration of the target sites should not exceed the target concentration for 2 consecutive years. Two and three times of violation were observed for Gyenghogang2 and Namgang-Dam2 sites while no violation was found for Gyeonghogang1 site. However, no violation was found since 1999 for all three sites. Correlation between each 12 stations within the watershed were analyzed and cluster analysis was conducted to figure out the spatial characteristics of the watershed. Correlation coefficient between Gyonghogang1 and 2 was high (0.758) while the coefficients between lake station (Namgang-Dam2) and stream stations (Gyonghogang1 and 2) were very low. Dendrogram indicated that all of three Namgang-Dam stations were very close and Gyenghogang1, 2 stations were also close.

Analysis of Korean TMLD Design Flow Variation due to Large Dam Effluents and Water Use Scenarios

  • Shin, Hyun-Suk;Kang, Doo-Kee;Kim, Sang-Dan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.74-83
    • /
    • 2007
  • The goal of this study is to establish an integrated watershed hydrologic model for the whole Nakdong River basin whose area is an approximately 24,000 km2. Including a number of watershed elements such as rainfall, runoff, water use, and so on, the proposed model is based on SWAT model, and is used to improve the flow duration curve estimation of ungauged watersheds for Korean Total Maximum Daily Load (TMDL). The model is also used to recognize quantitatively the river flow variation due to water use elements and large dam effluents in the whole watershed. The established combined watershed hydrologic model, SWAT-Nakdong, is used to evaluate the quantified influences of artificial water balance elements, such as a dam and water use in the watershed. We apply two water balance scenarios in this study: the dam scenario considering effluent conditions of 4 large multi-purpose dams, Andong dam, Imha dam, Namgang dam, and Habcheon dam, and the water use scenario considering a water use for stream line and the effluent from a treatment plant. The two scenarios are used to investigate the impacts on TMDL design flow and flow duration of particular locations in Nakdong River main stream. The results from this study will provide the basic guideline for the natural flow restoration in Nakdong River.

  • PDF

Temporal and Spatial Analysis of BOD data in Namgang-Dam Watershed for TMDLs (오염총량관리를 위한 남강댐유역 수질자료의 시.공간적 특성 분석)

  • Kim, Sang-Min;Kim, Sung-Min;Park, Tae-Yang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.1355-1359
    • /
    • 2010
  • The purpose of this study is to analyze the spatial characteristics of Namgang-Dam watershed for a Total Maximum Daily Loads(TMDL). Three TMDL target sites, Gyeonghogang1, 2, Namgang-Dam2, are located within Namgang-Dam watershed. Under the current criterion for TMDLs, 3-year arithmetic mean BOD concentration of the target sites should not exceed the target concentration for 2 consecutive years. Two and three times of violation were observed for Gyenghogang2 and Namgang-Dam2 sites while no violation was found for Gyeonghogang1 site. However, no violation was found since 1999 for all three sites. Correlation between each 12 stations within the watershed were analyzed and cluster analysis was conducted to figure out the spatial characteristics of the watershed. Correlation coefficient between Gyonghogang1 and 2 was high (0.758) while the coefficients between lake station (Namgang-Dam2) and stream stations (Gyonghogang1 and 2) were very low. Dendrogram indicated that all of three Namgang-Dam stations were very close and Gyenghogang1, 2 stations were also close.

  • PDF

Application of Remotely Sensed Data and Geographic Information System in Watershed Management Planning in Imha, Korea

  • CHAE Hyo-Sok;LEE Geun-Sang;KIM Tae-Joon;KOH Deuk-Koo
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.361-364
    • /
    • 2005
  • The use of remotely sensed data and geographic information system (GIS) to develop conservation-oriented watershed management strategies on Imha Dam, Korea, is presented. The change of land use for study area was analyzed using multi-temporal Landsat imagery. A soil loss model was executed within a GIS environment to evaluate watershed management strategies in terms of soil loss. In general, remotely sensed data provide efficient means of generating the input data required for the soil loss model. Also, GIS allowed for easy assessment of the relative erosion hazard over the watershed under the different land use change options. The soil loss model predicted substantial declines in soil loss under conservation-oriented land management compared to current land management for Imha Dam. The results of this study indicate that soil loss potential (5,782,829 ton/yr) on Imha Dam in 2003 is approximately 1.27 times higher than that (4,557,151 ton/yr) in 1989. This study represents the first attempt in the application of GIS technology to watershed conservation planning for Imha Dam. The procedures developed will contribute to the evolution of a decision support system to guide the land planning and dam management in Imha Dam.

  • PDF

Long-term Sediment Discharge Analysis in Yongdam Dam Watershed due to Climate Change

  • Felix, Micah Lourdes;Kim, Joocheol;Choi, Mikyoung;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.327-327
    • /
    • 2020
  • Increase in Earth's surface temperature, higher rainfall intensity rate, and rapid changes in land cover are just some of the most evident effects of climate change. Flooding, and river sedimentation are two inevitable natural processes in our environment, and both issues poses great risks in the dam industry when not addressed properly. River sedimentation is a significant issue that causes reservoir deposition, and thus causes the dam to gradually lose its ability to store water. In this study, the long-term effects of climate change on the sediment discharge in Yongdam Dam watershed is analyzed through the utilization of SWAT, a semi-distributed watershed model. Based from the results of this study, an abrupt increase on the annual sediment inflow trend in Yongdam Dam watershed was observed; which may suggests that due to the effects of climate change, higher rainfall intensity, land use and land cover changes, the sedimentation rate also increased. An efficient sedimentation management should consider the increasing trend in sedimentation rate due to the effects of climate change.

  • PDF

Assessment of Dam Seismic Safety using the Relationship between Acceleration and JMA Intensity (가속도와 JMA진도 관계를 이용한 댐 시설의 지진 안정성 평가)

  • Kang, Gi-Chun;Choi, Byoung-Seub;Cha, Kee-Uk;Cheung, Sang-In;Lee, Jong-Wook
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.6
    • /
    • pp.271-278
    • /
    • 2014
  • Seismic intensity deduced from instrumental data has been evaluated using the empirical relationship between intensity and peak ground acceleration (PGA) during an earthquake. The Japan Meteorological Agency (JMA) developed a seismic intensity meter, which can estimate the real-time seismic intensity from seismic motions observed at a local site to evaluate the damage during the earthquake more correctly. This paper proposes a practical application of the JMA intensity to dams during the 2013 earthquake in Yeongcheon, Korea. In the present paper, seismic intensity was estimated from the relationships between accelerations observed at Yeongcheon Dam. Estimated seismic intensities were in the range of 0 to 3, which was verified from the displacements of dams and the variation of the ground water level observed at Yeongcheon dam during the earthquake. The JMA intensity, which is determined by considering the frequency, duration of cyclic loading, etc., was 0 (zero) and there was no damage to Yeoncheon dam during the earthquake.

Influence of Rainfall observation Network on Daily Dam Inflow using Artificial Neural Networks (강우자료 형태에 따른 인공신경망의 일유입량 예측 정확도 평가)

  • Kim, Seokhyeon;Kim, Kyeung;Hwang, Soonho;Park, Jihoon;Lee, Jaenam;Kang, Moonseong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.2
    • /
    • pp.63-74
    • /
    • 2019
  • The objective of this study was to evaluate the influence of rainfall observation network on daily dam inflow using artificial neural networks(ANNs). Chungju Dam and Soyangriver Dam were selected for the study watershed. Rainfall and dam inflow data were collected as input data for construction of ANNs models. Five ANNs models, represented by Model 1 (In watershed, point rainfall), Model 2 (All in the Thiessen network, point rainfall), Model 3 (Out of watershed in the Thiessen network, point rainfall), Model 1-T (In watershed, area mean rainfall), Model 2-T (All in the Thiessen network, area mean rainfall), were adopted to evaluate the influence of rainfall observation network. As a result of the study, the models that used all station in the Thiessen network performed better than the models that used station only in the watershed or out of the watershed. The models that used point rainfall data performed better than the models that used area mean rainfall. Model 2 achieved the highest level of performance. The model performance for the ANNs model 2 in Chungju dam resulted in the $R^2$ value of 0.94, NSE of 0.94 $NSE_{ln}$ of 0.88 and PBIAS of -0.04 respectively. The model-2 predictions of Soyangriver Dam with the $R^2$ and NSE values greater than 0.94 were reasonably well agreed with the observations. The results of this study are expected to be used as a reference for rainfall data utilization in forecasting dam inflow using artificial neural networks.

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

The Assessment of Water Pollution Accident on Dam Watershed using GIS (GIS에 의한 댐 유역 수질오염사고 평가)

  • Myeong, Gwang Hyeun;Jeong, Jong Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.4
    • /
    • pp.489-496
    • /
    • 2011
  • The water pollution such as oil spill from stream and river because of car accidents have been frequent cases in the watershed of Dam. However we don't have any simulation methods about flow modeling on the watershed and stream tree. In this study aims to analyze water pollution accidents area on impact range for ANDONG-Dam. The focused watershed and the risk range of path analysis model was designed by GIS database. The frequency of transportation accidents which may occur from road accidents in the level of quantitative and qualitative analysis to map flow analysis using ArcHydro Model and Open Geospatial Consortium(OGC) API. and the path way from the accident point to the reservoir stayed on the path was simulated. The area of risk accessment index was displayed with cell and grid of dam area.

Development and Evaluation of SWAT Topographic Feature Extraction Error(STOPFEE) Fix Module from Low Resolution DEM (저해상도 DEM 사용으로 인한 SWAT 지형 인자 추출 오류 개선 모듈 개발 및 평가)

  • Kim, Jong-gun;Park, Youn-shik;Kim, Nam-won;Chung, Il-moon;Jang, Won-seok;Park, Jun-ho;Moon, Jong-pil;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.4
    • /
    • pp.488-498
    • /
    • 2008
  • Soil and Water Assessment Tool (SWAT) model have been widely used in simulating hydrology and water quality analysis at watershed scale. The SWAT model extracts topographic feature using the Digital Elevation Model (DEM) for hydrology and pollutant generation and transportation within watershed. Use of various DEM cell size in the SWAT leads to different results in extracting topographic feature for each subwatershed. So, it is recommended that model users use very detailed spatial resolution DEM for accurate hydrology analysis and water quality simulation. However, use of high resolution DEM is sometimes difficult to obtain and not efficient because of computer processing capacity and model execution time. Thus, the SWAT Topographic Feature Extraction Error (STOPFEE) Fix module, which can extract topographic feature of high resolution DEM from low resolution and updates SWAT topographic feature automatically, was developed and evaluated in this study. The analysis of average slope vs. DEM cell size revealed that average slope of watershed increases with decrease in DEM cell size, finer resolution of DEM. This falsification of topographic feature with low resolution DEM affects soil erosion and sediment behaviors in the watershed. The annual average sediment for Soyanggang-dam watershed with DEM cell size of 20 m was compared with DEM cell size of 100 m. There was 83.8% difference in simulated sediment without STOPFEE module and 4.4% difference with STOPFEE module applied although the same model input data were used in SWAT run. For Imha-dam watershed, there was 43.4% differences without STOPFEE module and 0.3% difference with STOPFEE module. Thus, the STOPFEE topographic database for Soyanggang-dam watershed was applied for Chungju-dam watershed because its topographic features are similar to Soyanggang-dam watershed. Without the STOPFEE module, there was 98.7% difference in simulated sediment for Chungju-dam watershed for DEM cell size of both 20 m and 100 m. However there was 20.7% difference in simulated sediment with STOPFEE topographic database for Soyanggang-dam watershed. The application results of STOPFEE for three watersheds showed that the STOPFEE module developed in this study is an effective tool to extract topographic feature of high resolution DEM from low resolution DEM. With the STOPFEE module, low-capacity computer can be also used for accurate hydrology and sediment modeling for bigger size watershed with the SWAT. It is deemed that the STOPFEE module database needs to be extended for various watersheds in Korea for wide application and accurate SWAT runs with lower resolution DEM.