산업용 수용가의 정전비용 산출을 위한 조사 분석(I) (Survey & Analysis for the Calculation on the Industrial Customer Interruption Costs)

  • 남기영;최상봉;류희석;정성환;이재덕;김대경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.122-124
    • /
    • 2003
  • In recent, the various electric & electronic machines are newly developed everyday and the electricity supply system & environment on the process from generation to consumption of electricity also is being changed. In other words, both supplier and consumer of electricity are required to be responsible for their interruption costs. So, it is very important and meaningful work for evaluating the interruption costs in quantitative. Additionally, since the restructuring of electric industry is on going in world wide, after restructuring, most of all electric utilities and consumer have to consider the supply reliability and quality as a important element of the calculating the related costs and contract because it takes costs to keep the supply reliability and quality highly. Especially, the interruption or the supply reliability will have influence on the bilateral contract between supplier and customer as a key point to determine the once in competitive electric market. Therefore, it has very important moaning to calculate the interruption costs in the present that it is prepared to open the competitive electric market. In this paper, international standards, i.e. IEC, IEEE, are applied to the analysis on the interruption costs used in the questionnaires which are newly designed including short duration interruption by the authors instead of traditional interruption criteria. Firstly, using the questionnaires, the authors got related data from industries according to the standard industry classification which are being used in electric utility and other national statistics in Korea. However, analysis results are hard to say typical value because of the not so many samples. So, the authors are going to survey and focus on not all kinds of industry but a few kinds of them that their facilities are effected or stop by short duration interruptions, so there are large economical damages. Finally, the authors hope to find the reliable and meaningful model in interruption costs of industrial customer.

  • PDF

정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구 (A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs)

  • 손창남;한운동;문종필
    • 전기학회논문지P
    • /
    • 제63권3호
    • /
    • pp.163-168
    • /
    • 2014
  • In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.

산업수용가의 순간정전에 따른 정전비용 검토 (A Survey on Short Duration Interruption Costs in Industrial Customer)

  • 남기영;최상봉;류희석;이재덕;정성환;김대경
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.189-191
    • /
    • 2004
  • This paper presents summary results of direct interview survey of Korean industrial customers conducted to evaluate the direct and short duration interruption costs resulting from local random electrical supply interruptions. The cost is evaluated using the questionnaires authors designed, which are mainly on the experience or preparatory actions consumers Predicted they would take. Economic evaluation of reliability that traditionally takes into account duration and frequency of interruption does not accurately reflect the lost value or economic impacts of industrial customer, especially large size, caused by any kind of interruption. So, to imply the substantial difference in costs incurred by different customer group, the authors apply the international standards, i.e. IEC, IEEE, to the analysis on the interruption costs.

  • PDF

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권2호
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

미시적 방법을 이용한 산업체 수용가의 공급지장비용 함수(SCDF) 산정 (Assessment of Interruption Costs on the Industry Load through Using the Microscopic Method)

  • 김용하;이평호;김영길;신형철;오석현;우성민
    • 조명전기설비학회논문지
    • /
    • 제25권4호
    • /
    • pp.88-96
    • /
    • 2011
  • This paper assesses interruption costs on the industry load through using the microscopic method. For assessment, the questionnaire was made on Korea Standard Industry Categorization which is composed of 28 type of industry Then, the survey was distributed to 1889 business in 12 area by staffs of KEPCO. The collected data is changed to the trustworthy data by using Bad Data Selection method and then the interruption costs of industry load was calculated by Tobit Regression which is tool analysing both collected data and the others.

거시적 방법을 이용한 지역별 정전비용 평가 (Assessment of Customer Interruption Cost by Regional Groups for Macro Approach)

  • 박충열;허창수
    • 조명전기설비학회논문지
    • /
    • 제19권1호
    • /
    • pp.124-129
    • /
    • 2005
  • 최근의 전기사업은 전력산업 구조개편과 맞물려 전력계통의 공급신뢰도가 큰 문제로 대두되고 있다. 또한 에너지-산업 간의 경쟁 심화로 공급자 측에서의 공급신뢰도와 관련된 환경조건 변화가 고려되어야 한다. 즉 다른 에너지와의 요금 격차로 인해 수용가가 전력에너지를 타 에너지로 변환할 가능성이 있어 전력공급 신뢰도의 일률적 향상은 반드시 필수적인 전략이라고 말할 수 없기 때문에 이와 같은 문제점에 효율적으로 대처하기 위해서는 수용가의 공급신뢰도와 정전비용에 대한 반응을 감지할 필요가 있다. 따라서 본 논문에서는 이와 같은 대내외적인 환경에 대처하기 위해 매크로 접근방법을 이용하여 국내 각 지역별로 수용가 정전비용을 년도별로 평가하였다. 즉 각 시도별로 공공용, 서비스업, 농림${\cdot}$어업, 광업, 제조업, 주택용 수용가에 대해 수용가 정전비용과 전기요금 단가에 대한 비율을 평가하였다.

배전계통 기기 유지보수를 위한 RCM 모델 (Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment)

  • 문종필;손진근
    • 전기학회논문지P
    • /
    • 제58권4호
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

산업단지내 배전계통의 공급신뢰도 및 정전비용 평가 (Evaluation of Reliability and Interruption Cost of Distribution Power System in Industrial Complex)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.95-96
    • /
    • 2006
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate distribution power system reliability by using customer interruption costs. Accordingly, it is increased for methodology to evaluate distribution power system reliability in power supply zones under competitive electricity market. This paper presents algorithm to evaluate system average interruption duration index. expected energy not supplied and system outage cost taking Into consideration failure rate of distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, distribution system of a dual supply system consisting of mostly high voltage customers in industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index and expected energy not supplied in sample industrial complex area are shown in detail.

  • PDF

국내 축산업 수용가의 정전비용 조사 및 평가 (Investigation and Assessment of Interruption Costs for Livestock Customers in Korea)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.347-349
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by livestock customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.

  • PDF

국내 공공용 수용가의 정전비용 조사 및 평가 (Investigation and Assessment of Interruption Costs for Public Customers in Korea)

  • 최상봉;남기영;김대경;정성환;류희석;이재덕
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.350-352
    • /
    • 2005
  • This paper presents the results of an investigation and assessment of the direct short term impacts of electric service interruption incurred by public customers. The study used a direct visit survey to determine the customer assessment of electric service interruption and characteristic. The variation in interruption cost with the characteristics of interruptions such as duration, time of day, frequency, and day of interruption was also investigated.