• Title/Summary/Keyword: current cost

Search Result 3,921, Processing Time 0.037 seconds

A Study on the Problem about Oriental Treatment Fee Based on Valuation of Resources (투입자원 평가에 근거한 한방 침구 부항 시술 수가의 문제점에 관한 연구)

  • Kim, Yong-Ho;Lee, Won-Hui;Chang, Hye-Jung;Lim, Sa-Bi-Na
    • The Journal of Korean Medicine
    • /
    • v.29 no.1
    • /
    • pp.15-24
    • /
    • 2008
  • Objectives : The purpose of this study is to reexamine current oriental medical treatment fees based on valuation of input resources which are the treating time, the treatment's difficulty, and the material cost. Methods : This study obtained the following results by reviewing the answers given by 172 oriental medical doctors from March 1 to April 15, 2006. To investigate material cost, we took inventory of treatment materials used by 2 oriental hospitals. Results : The current system does not reflect well enough the treating time and treatment's difficulty. Considering current oriental treatment fees, material costs are too much of doctors' fees. Especially, Wang-ssuk-dduem, which is another form of moxibustion treatment, was spent as much as 74.6% on materials cost. Conclusions : The findings suggest the current oriental treatment fees should be revised to reflect the actual input resources into oriental medical doctor activities and to avoid a distortion of physicians' behavior.

  • PDF

The Optimization of Current Mode CMOS Multiple-Valued Logic Circuits (전류구동 CMOS 다치 논리 회로설계 최적화연구)

  • Choi, Jai-Sock
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.6 no.3
    • /
    • pp.134-142
    • /
    • 2005
  • The implementation of Multiple-Valued Logic(MVL) based on Current-Mode CMOS Logic(CMCL) circuits has recently been achieved. In this paper, four-valued Unary Multiple-Valued logic functions are synthesized using current-mode CMOS logic circuits. We properly make use of the fact that the CMCL addition of logic values represented using discrete current values can be performed at no cost and that negative logic values are readily available via reversing the direction of current flow. A synthesis process for CMCL circuits is based upon a logically complete set of basic elements. Proposed algorithm results in less expensive realization than those achieved using existing techniques in terms of the number of transistors needed. As an alternative to the cost-table techniques Universal Unary Programmable Circuit (UUPC) for a unary function is also proposed.

  • PDF

Hybrid Superconducting Fault Current Limiters for Distribution Electric Networks (하이브리드 방식을 적용한 배전급 초전도 한류기 개발)

  • Lee, B.W.;Park, K.B.;Sim, J.;Oh, I.S.;Lim, S.W.;Kim, H.R.;Hyun, O.B.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.102-103
    • /
    • 2007
  • In order to apply resistive superconducting fault current limiters into electric power systems, the urgent issues to be settled are as follows, such as initial installation price of SFCL, operation and maintenance cost due to ac loss of superconductor and the life of cryostat, and high voltage and high current problems. The ac loss and high cost of superconductor and cryostat system are main bottlenecks for real application. Furthermore in order to increase voltage and current ratings of SFCL, a lot of superconductor components should be connected in series and parallel which resulted in extreme high cost. Thus, in order to make practical SFCL, we designed novel hybrid SFCL which combines superconductor and conventional electric equipment including vacuum interrupter, power fuse and current limiting reactor. The main purpose of hybrid SFCL is to drastically reduce total usage of superconductor by adopting current commutation method by use of superconductor and high fast switch. Consequently, it was possible to get the satisfactory test results using this method, and further works for practical applications are in the process.

  • PDF

A Simple ZVZCS Sustain Driver for a Plasma Display Panel

  • Yi Kang-Hyun;Han Sang-Kyoo;Choi Seong-Wook;Kim Chong-Eun;Moon Gun-Woo
    • Journal of Power Electronics
    • /
    • v.6 no.4
    • /
    • pp.298-306
    • /
    • 2006
  • A high efficiency and low cost sustain driver for a plasma display panel (PDP) utilizing a current pumping method is proposed. The main concept of the proposed circuit is using the current source to charge and discharge the panel. As a result, all power switches can achieve zero voltage switching (ZVS) and every auxiliary switch can also achieve zero current switching (ZCS). Since the inductor current can compensate for the discharge current, the current stress of all the power switches can be reduced considerably. Furthermore, it has features such as a simpler structure, less mass, lower cost, and lower electromagnetic interference than in previous circuits.

Contract Awarding Process and its Reasonable Improvement for Defense Acquisition (공공사업 경쟁입찰에서 낙찰자 결정방법분석 및 국방획득사업의 합리적인 사업자결정 방안)

  • Eo, Hajoon;Kim, Sung-Chul
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.69-86
    • /
    • 2015
  • The current contract awarding process regulated by laws and ordinances is analyzed and more reasonable processes are suggested. To this end, the principle of economic analysis is described with emphasis on the cost-effectiveness analysis, and the laws and ordinances regulating the process are thoroughly examined. The current contract awarding rule is based on the weighted sum of effectiveness score and cost score. This may not conform to the framework of economic analysis where effectiveness is supposed to be measured as an output and cost measured as an input. An improvement is attempted to the defense acquisition system and it is recognized that the economic analysis and policy consideration should be performed separately. Concept of statistical testing is introduced to see if the results of the cost effectiveness analyses show the significant difference between the alternatives. It is suggested that the contract awarding process can be improved by performing significance test followed by the aggregation of the two analyses. A minor improvement is also suggested on the application of current rules.

Analysis on the Relating Factors of Profitability of Korean Public Corporation Medical Centers(KPCMCs) (지방공사 의료원의 수익성 관련요인 분석)

  • Moon, Jae-Woo;Park, Jae-San
    • Korea Journal of Hospital Management
    • /
    • v.9 no.2
    • /
    • pp.102-127
    • /
    • 2004
  • The objective of this study is to analyze a current trend of and relating factors on profitability of the Korean Public Corporation Medical Centers(KPCMCs, hereinafter, hospitals) in Korea. There are 34 hospitals in Korea as of 2004. Among these hospitals some are red ink hospitals, others are black inks in terms of profitability. Data were collected by Korea Health Industry Development Institute(KHIDI) Statistics for Hospital Management 2000-2002 and Ministry of Health and Welfare(MOHW) financial data of public hospitals which was planned to coordinate public health care services roadmap in the long run. The samples are 32 hospitals. Profitability was measured in the aspect of profit rate with normal profit to total assets, and normal profit to gross revenues as dependent variables in respective. Independent variables were classified by general factors, i.e., location, intern/resident training, period of opening, number of beds, and managerial factors(current ratio, fixed ratio, liability to total assets, total assets turnover, personnel costs, materials cost, administrative cost), and finally factors related to patient treatment(average length of stay, bed occupancy rate, admission ratio of outpatients). The methods of analysis are correlation and multiple regression analysis. This study shows firstly, a lot of hospitals are optimal current ratio. Hospitals in upper 100% current ratio are 81.2%. And the personnel cost in total costs are high. Secondly, the trend of normal profit to gross revenues of hospitals are deteriorating gradually. And lastly, as a result of multiple regression analysis, the factors had on significant effect on normal profit to total assets are fixed ratio(+), liability to total assets(-), bed occupancy rate(+), admissions of outpatients(+), etc. And the factors had on significant effect on normal profit to gross revenues are current ration(+), fixed ratio(+), personnel cost(-), administrative expenses(-), admissions of outpatients(+), etc. In conclusion, to improve the profitability of hospitals, the efforts to reduce personnel cost and average length of stay might be needed. And also beds utilization rate need to be increased.

  • PDF

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

Ratio Estimation of Indirect Cost Sector about Defense Companies by Statistic Technique (통계 기법에 의한 방산업체의 간접원가부문 비율 추정)

  • Lim, Hyeoncheol;Kim, Suhwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.4
    • /
    • pp.246-252
    • /
    • 2017
  • In the defense acquisition, a company's goal is to maximize profits, and the government's goal is to allocate budgets efficiently. Each year, the government estimates the ratio of indirect cost sector to defense companies, and estimates the ratio to be applied when calculating cost of the defense articles next year. The defense industry environment is changing rapidly, due to the increasing trend of defense acquisition budgets, the advancement of weapon systems, the effects of the 4th industrial revolution, and so on. As a result, the cost structure of defense companies is being diversifying. The purpose of this study is to find an alternative that can enhance the rationality of the current methodology for estimating the ratio of indirect cost sector of defense companies. To do this, we conducted data analysis using the R language on the cost data of defense companies over the past six years in the Defense Integrated Cost System. First, cluster analysis was conducted on the cost characteristics of defense companies. Then, we conducted a regression analysis of the relationship between direct and indirect costs for each cluster to see how much it reflects the cost structure of defense companies in direct labor cost-based indirect cost rate estimates. Lastly a new ratio prediction model based on regularized regression analysis was developed, applied to each cluster, and analyzed to compare performance with existing prediction models. According to the results of the study, it is necessary to estimate the indirect cost ratio based on the cost character group of defense companies, and the direct labor cost based indirect cost ratio estimation partially reflects the cost structure of defense companies. In addition, the current indirect cost ratio prediction method has a larger error than the new model.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

Effects of Extending Duration of Nighttime Road Construction (도로품질 향상을 위한 야간 도로공사 시간확대의 영향분석)

  • Lee, Dongmin;Choi, Junseong;Park, Jejin;Park, Yongjin
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.153-162
    • /
    • 2017
  • PURPOSES : This study was conducted to analyze the effects arising from extending the duration of nighttime road construction on improving road quality and durability. METHODS : Most previous studies estimating the social cost of various construction conditions did not consider road pavement cooling time as a factor in improving road pavement quality. This study investigated the feasibility of achieving higher road quality and durability by extending the duration of nighttime road construction time extension. For this investigation, the effects of such an extension on traffic conditions were analyzed based on micro-simulation studies and scenario-based cost-benefit analyses, using factors including traffic volume, delay, construction cost, and road pavement cooling time. RESULTS : The results of the traffic simulation studies and cost-benefit analyses indicate that the current road construction method that emphasizes completing nighttime road construction by 6 a.m. reduces pavement life while causing relatively little traffic delay. If the night construction time is instead extended to 2 p.m., road pavement lifetime is increased, reducing road re-construction cost. These savings are greater than the cost of congestion arising from extending the duration of nighttime construction. CONCLUSIONS : The current nighttime construction durations need to be extended in order to efficiently manage roads and reduce road management costs.