• Title/Summary/Keyword: current collection

Search Result 1,064, Processing Time 0.031 seconds

Dynamic Analysis of Current Collection System in High Speed Train (고속전철용 집전시스템의 동적해석)

  • 최연선;최진민;경진호
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1995.10a
    • /
    • pp.142-147
    • /
    • 1995
  • Dynamic characteristics of current collection system is one of the major factors which decide the performance of high speed train. To find good design parameters of the current collection system design guide is prepared through the engineering analysis in this study. The analysis starts from the statics of catenary system which results in the sinusoidal variation of stiffness, which is inherently nonlinear Mathieu equation. Simple physical models of rigid trolley wire and Mathieu equation are considered. To simulate the dynamic response of current collection system, numerical integration based on central difference method and modal analysis are presented. The calculated results of central difference method show superior to those of Euler based algorithm.

  • PDF

A simulation study on predicting the current collection performance in 400km/h on establishing the maximum speed test plan of the next Korean high speed train development project (차세대 고속철도의 최고속도 시험 계획 수립을 위한 집전 성능 예측 시뮬레이션)

  • Kwon, Sam-Young;Park, Chun-Soo;Cho, Yong-Hyeon;Lee, Ki-Won;Park, Young
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.428-432
    • /
    • 2008
  • The next Korean high speed train development project is started. In testing stage of this project, the 400km/h maximum speed test will be conducted. In Korean railway infrastructure conditions the 400km/h seems to be a critical speed especially in the aspect of the overhead contact lines. The current collection performance of the 400km/h which is predicted by dynamic interaction simulation are described in this paper. To discuss the permissible criteria of contact forces, displacements and percentage contact loss, the French 575km/h current collection conditions are simulated. Furthermore, review of the simulation results of the Korean 400km/h current collection conditions is conducted through comparison with that of the French 575km/h.

  • PDF

Measurement and Analysis of Current Collection Signals in Korean High-speed Railway

  • Kim, Jung-Soo
    • International Journal of Safety
    • /
    • v.5 no.2
    • /
    • pp.1-5
    • /
    • 2006
  • A data acquisition and processing system for measuring the current collection signals of the Korean High-speed Railway is developed. The current collection system is composed of a pantograph and the overhead catenary that supplies electrical power to the train through the pantograph. The system simultaneously measures the signals generated at the interface between the catenary and the pantograph through the accelerometers, load cells and strain gauges placed at various locations. The on-track test data are processed to evaluate the current collection reliability. The fiequency analysis of the signals reveals the presence of several structural vibration modes in the pantograph, as well as the components arising from the periodicity in the structure of the catenary and pantograph at the interface. The feasibility of predicting the contact performance from the measured signals is also demonstrated.

Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System (350km/h 전차선로 집전성능 시험 및 결과 분석)

  • Heo, Yong-Seok;Lee, In-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.2
    • /
    • pp.365-369
    • /
    • 2016
  • The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

A Study on Design of Linear Induction Motor in Dynamic Tester for Catenary-current Collection (주행 집전계 시험기의 주행 대차용 선형 유도전동기 설계에 관한 연구)

  • Ham, Sang-Hwan;Cho, Su-Yeon;Lee, Ju
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.771-775
    • /
    • 2011
  • This paper presents design process of linear induction motor in dynamic tester for catenary-current collection. To minimize length of rail for dynamic tester for catenary-current collection, accelerating performance of the linear induction motor is very important. So the design process of linear induction motor considered in this paper is different with general design process of linear induction motor, because dynamic tester has three type driving region, as accelerating region, constant speed region, and braking region. Considering accelerating performance of motor, distance and time from starting point to constant speed region were concerned for load condition of motor. Designed linear induction motor was analyzed by 2-dimensional finite element method. Using mechanical dynamics simulation with analysis result of 2-dimensional finite element method and accelerating performance of designed motor was proved.

Voltage-controlled Over-current Relay for Loop-connected Distributed Generators (환상형 분산전원 단지 보호를 위한 전압제어 과전류 계전기)

  • Kim, Tae-Hee;Kang, Sang-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.1979-1985
    • /
    • 2016
  • A protection algorithm using a voltage-controlled overcurrent element for a looped collection circuit in a wind farm is suggested in this paper. Because the proposed algorithm uses voltage relaying signals as well as current relaying signals, any fault in the looped collection circuit can be cleared by voltage-controlled overcurrent relays located at the two adjacent relaying points, the nearest place in each direction from the fault point. The algorithm can also distinguish the external faults which occur at the outside of a wind farm from the internal faults. It means that the proposed algorithm can provide the proper ability of protection coordination to the relays in the looped collection circuits of a large wind farm. The performance of the proposed algorithm is verified under various fault conditions using PSCAD/EMTDC simulations.

Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line (수서고속철도 전차선로의 설치조건의 따른 집전상태 분석)

  • Na, Kyung-min;Park, Young;Lee, Kiwon;Cho, Yong Hyeon;Kwon, Sam-young;Park, Chulmin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.4
    • /
    • pp.727-732
    • /
    • 2017
  • This paper describes the dynamic characteristics depending on installation condition between a pantograph and an OCL (Overhead Contact Line) on a new high speed line in Korea. The current collection performance between the pantograph and the OCL was tested during train operation from Suseo to Jije stations. The current collection performance is evaluated based on the duration of an arc by using an arcing measurement system. The system consists of an optical sensor for measuring the duration of an arc and a camera for monitoring current collection performance. An arcing duration is defined as a percentage of arcing in international standards. This test aims to analyze the locations of repetitive arcing depending on installation conditions of OCLs on a new high speed line in order to use the result as reference data for correct construction and maintenance.

A Test Study on Interface Dynamics of Current Collection System in High Speed Trains

  • Kim, Jung-Soo;Han, Jae-Hyun
    • International Journal of Railway
    • /
    • v.4 no.2
    • /
    • pp.34-41
    • /
    • 2011
  • Using a test run data, the dynamics of the interface between the catenary and pantograph constituting the current collection system in high-speed trains are investigated. The test run signals are analyzed to determine the dynamic parameters critical to the current collection performance. There are found to be frequency components of the pantograph motion that are dependent on train speed as well as components that are stationary such as the resonant mode of the panhead suspension in the pantograph. From contact force measurement using load cell, the mean contact force was found to be stable while the fluctuating component was found to be dependent on the range of the frequency of the pantograph motion taken into account. The finding implies that numerical investigations reported in the literature that are based on lumped element models of the catenary and/or pantograph provide accurate predictions on the mean value but are of limited use in estimating fluctuation of the contact force. It is concluded that simulation studies based on lumped-element models which do not incorporate panhead structural vibration modes is inaccurate at high train speeds.

An Implement of Vision based Measurement Technology for Traction Power System up to 250 km/h (250 km/h급 전철설비의 비전기반 검측 기술 구현)

  • Park, Young-Sig;Na, Kyung-Min;Park, Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.7
    • /
    • pp.976-980
    • /
    • 2018
  • The traction power system is configured to transmit electricity to the vehicles through mechanical contact between the OCL (Overhead Contact Line) and the pantograph. The system measures the current collection performance of the OCL, or the OCL installation condition is examined through maintenance for commercial operation. Maintenance continues to check the conditions through visual inspection by walking and inspection vehicles. The current collection performance is divided into the percentage of arcing(%), the contact force, and the uplift. The percentage of arcing is composed of a vision based system and used to verify the performance of a new OCL. However, it is not always possible to measure the current collection performance during commercial operation, and maintenance based on human resources can not be replaced. This paper presents the minimum performance condition of video devices in the current collection system of commercial vehicles. In addition, a continuous arcing was measured, and current collection performance was examined on the traction power system at the 250 km/h. It was analyzed with a minimum duration of arc of 1 ms. The frame rate is then shown by comparing the number of frames in the image at the time intervals of the number of the arcing. It is expected that the result of this study can be used for examining the minimum performance of video devices depending on their purpose.