• Title/Summary/Keyword: crown cover

Search Result 57, Processing Time 0.027 seconds

Exploring Relationships between Urban Tree Plantings and Microclimate Amelioration (도시 수목식재와 미기후 개선의 상관성 구명)

  • Jo, Hyun-Kil;Ahn, Tae-Won
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.5 s.118
    • /
    • pp.70-75
    • /
    • 2006
  • The purpose of this study is to explore the effects of difference in urban tree plantings on microclimate amelioration, and to suggest essential information for quantifying urban energy budgets and energy savings. This study was focused on measuring and analyzing air temperature and relative humidity in summer. Daytime air temperatures at places with 8%, 24%, 44%, 79%, and 100% cover of woody plants were, respectively, $0.6^{\circ}C,\;1.3^{\circ}C,\;2.4^{\circ}C,\;3.5^{\circ}C,\;and\;4.8^{\circ}C$ cooler, compared to a place with 0% cover. A 10% increase of woody plant cover was estimated to reduce the temperature by approximately $0.55^{\circ}C$. The temperature reduction effects were relatively greater between places with lower cover of woody plants than between those with higher cover. Woody plant cover and crown volume were the appropriate indicators which quantified the effects of tree plantings on air temperatures, based on the correlation analysis. Regression equations to estimate temperature change ($Y:^{\circ}C$) using woody plant cover ($X_1:%$) or crown volume ($X_2:m^3$) as independent variables are as follows: $$1nY=3.3233-0.0018X_1\;(r^2=0.99,\;p<0.0001)\;Y=27.5297-0.0019X_2\;(r^2=0.96,\;p=0.0007)$$

Estimation of Canopy Cover in Forest Using KOMPSAT-2 Satellite Images (KOMPSAT-2 위성영상을 이용한 산림의 수관 밀도 추정)

  • Chang, An-Jin;Kim, Yong-Min;Kim, Yong-Il;Lee, Byoung-Kil;Eo, Yan-Dam
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.20 no.1
    • /
    • pp.83-91
    • /
    • 2012
  • Crown density, which is defined as the proportion of the forest floor concealed by tree crown, is important and useful information in various fields. Previous methods of measuring crown density have estimated crown density by interpreting aerial photographs or through a ground survey. These are time-consuming, labor-intensive, expensive and inconsistent approaches, as they involve a great deal of subjectivity and rely on the experience of the interpreter. In this study, the crown density of a forest in Korea was estimated using KOMPSAT-2 high-resolution satellite images. Using the image segmentation technique and stand information of the digital forest map, the forest area was divided into zones. The crown density for each segment was determined using the discriminant analysis method and the forest ratio method. The results showed that the accuracy of the discriminant analysis method was about 60%, while the accuracy of the forest ratio method was about 85%. The probability of extraction of candidate to update was verified by comparing the result with the digital forest map.

Field Measurements with the Construction of Cut and Cover Tunnel (복개 터널구조물의 현장 시공에 따른 계측 분석 사례)

  • 박시현;이석원;이규필;배규진;전오성;이종성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.149-156
    • /
    • 2002
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process of the ground material. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells, installed after construction of the tunnel lining, measure the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measuring results in the field, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process of the ground material. Considerations on the validity of the measuring results were paid. For the analysis of measurements, after dividing back fill process into three steps, various factors which affect on the behavior of tunnel lining were investigated at each step.

  • PDF

A study on the shallow tunneling method using cover structure (복개 구조물을 이용한 저토피 계곡부 터널의 통과방안에 대한 연구)

  • Chung, Yong-Jin;Nam, Hyun-Woo;Choi, Ho-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.564-569
    • /
    • 2005
  • Usually, Steel pipe grouting method or cut and cover method has been applied to tunnel with very shallow overburden or it is situated in valley. However, in case of lack of overburden height to reinforcement tunnel crown which is very difficult to construction. Also, application of cut and cover method that do not consider surrounding site condition causes popular enmity generation and environmental damage. It is the best alternative method that reduces the amount of excavated soil and excavate tunnel under ground to solve these problems. The tunneling method using cover structure which is to prevent a tunnel from collapse because this method can be reduce excavation area and construct tunnel under ground after set a cover structure and backfill ground. In this study, to know more effective structure type, comparative analysis was performed to behavior characters of slab and arch type construction that can be used to cover structure. Also a 2D and 3D numerical analysis have been performed to verify the stability of ground during excavation. As the result, the tunneling method using cover structure that it can be good alternative method for tunnel with shallow overburden and it through valley

  • PDF

Population Dynamics of Pinus densiflora for. erecta at Sokwang-Ri, Uljin-Gun in Southeastern Korea

  • Yun, Chung-Weon;Bae, Kwan-Ho;Hong, Sung-Cheon
    • The Korean Journal of Ecology
    • /
    • v.24 no.6
    • /
    • pp.341-348
    • /
    • 2001
  • Population dynamics of the oldest relic stand of Pinus densiflora for. erecta which remains as a status of patch in Sokwang-Ri area, Uljin-Gun, was studied to provide the basic data for conservation of the oldest pine stand in Korea. The upper slope site and ridge site including total 12 plots mainly represented Pinus densiflora for. erecta and Quercus mongolica. These two tree species showed reverse J-shaped distribution. From this information, it was concluded that intensive interspecific competition between two species could be occurring. Age distribution of P. densiflora for. erecta on the sites above middle slope area was indicated bi-modal type or tri-modal type which was known as an age structure of climax forest. Therefore, it was estimated that Pinus densiflora for. erecta population could be continuously maintained in the each patch above middle slope area. In the valley sites, hardwood species such as Q. mongolica, Q. variabilis, Styrax obassia and Acer pseudosieboldianum occupied most part of the under crown-cover area and their seedlings and saplings were developing into the closed upper layer crown because the height of upper layer crown reached about 35 meters and such a high crown height was more suitable for light utilization by plants of under layer. The growth patterns were mainly fluctuated for the entire life time of the oldest tree caused by frequent disturbance. And the initial growth curves of the mature trees and suppressed juvenile trees showed different tendencies along the sites.

  • PDF

Various Turf Covers for Kentucky bluegrass Growth and Spring Green-up

  • Lee, Sang-Kook
    • Weed & Turfgrass Science
    • /
    • v.2 no.3
    • /
    • pp.292-297
    • /
    • 2013
  • Winter turfgrass injury is one of the critical problems of many golf courses in Korea. Turfgrass loss from freezing injury due to low temperature leads to many types of damages including weed invasion, increased herbicide cost, increased soil erosion, and expensive re-establishment. Although Kentucky bluegrass (Poa pratensis L.) which is the most widely used among cool-season grasses in Korea is well known as cold tolerance species, freezing injuries to Kentucky bluegrass during winter are often found. Protecting the turfgrass crown is necessary to recover from low temperature stress in winter because shoots and roots can be recovered from the crown. Turf covers may protect the crowns from direct low temperatures and desiccation. Six different turf covers were installed to cover Kentucky bluegrass during a period of low temperatures. Turf covers had positive effects for spring green-up of Kentucky bluegrass based on the study. Applying any type of turf covers on Kentucky bluegrass resulted in an increase average and minimum temperature compared to the uncovered plot. Among turf covers, clear PVC film without holes produced the longest root length and the highest turfgrass quality.

Analysis on the Field Measurements with the Construction of Cut and Cover Tunnel (복개 터널구조물의 현장 시공에 따른 계측 분석 사례)

  • 이석원;박시현;최순욱;배규진
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.125-137
    • /
    • 2003
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells measured the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measurements, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process. Considerations on the validity of the field measurements were paid.

Improvement of Roll Profile Prediction Model in Hot Strip Rolling (열간압연 공정에서 롤 프로파일 예측모델 향상)

  • Chung, J.S.;You, J.;Park, H.D.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2007.05a
    • /
    • pp.229-232
    • /
    • 2007
  • In hot strip rolling, the work roll profile is one of the main factors in predicting and correcting the strip profile. Various studies concerning the wear profile and the thermal crown of work roll have been performed, and the results of these studies have shown that the work roll profile must be predicted accurately so as to efficiently control the strip qualities such as thickness, crown, flatness, and camber. Therefore, a precise prediction model of roll profile is called for in a perfect shape control system. In this paper, a genetic algorithm was applied to improve on the roll profile prediction model in hot strip rolling. In this approach, the optimal design problem is formulated on the basis of a numerical model so as to cover the diverse design variables and objective functions. A genetic algorithm was adopted for conducting design iteration for optimization to determine the coefficient of the numerical model for minimization of errors in the result of the calculated value and the measured data. A comparative analysis showed a satisfactory conformity between them..

  • PDF

Improvement of Roll Profile Prediction Model in Hot Strip Rolling (열간압연 공정에서 롤 프로파일 예측모델 향상)

  • Chung, J.S.;You, J.;Park, H.D.
    • Transactions of Materials Processing
    • /
    • v.16 no.4 s.94
    • /
    • pp.250-253
    • /
    • 2007
  • In hot strip rolling, the work roll profile is one of the main factors in predicting and correcting the strip profile. Various studies concerning the wear profile and the thermal crown of work roll have been performed, and the results of these studies have shown that the work roll profile must be predicted accurately so as to efficiently control the strip qualities such as thickness, crown, flatness, and camber. Therefore, a precise prediction model of roll profile is called for in a perfect shape control system. In this paper, a genetic algorithm was applied to improve on the roll profile prediction model in hot strip rolling. In this approach, the optimal design problem is formulated on the basis of a numerical model so as to cover the diverse design variables and objective functions. A genetic algorithm was adopted for conducting design iteration for optimization to determine the coefficient of the numerical model for minimization of errors in the result of the calculated value and the measured data. A comparative analysis showed a satisfactory conformity between them.

Simplified Failure Mechanism for the Prediction of Tunnel Crown and Excavation Front Displacements

  • Moghaddam, Rozbeh B.;Kim, Mintae
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.101-112
    • /
    • 2019
  • This case study presented a simplified failure mechanism approach used as a preliminary deformation prediction for the Mexico City's metro system expansion. Because of the Mexico City's difficult subsoils, Line 12 project was considered one of the most challenging projects in Mexico. Mexico City's subsurface conditions can be described as a multilayered stratigraphy changing from soft high plastic clays to dense to very dense cemented sands. The Line 12 trajectory crossed all three main geotechnical Zones in Mexico City. Starting from to west of the City, Line 12 was projected to pass through very dense cemented sands corresponding to the Foothills zone changing to the Transition zone and finalizing in the Lake zone. Due to the change in the subsurface conditions, different constructions methods were implemented including the use of TBM (Tunnel Boring Machine), the NATM (New Austrian Tunneling Method), and cut-and-cover using braced Diaphragm walls for the underground section of the project. Preliminary crown and excavation front deformations were determined using a simplified failure mechanism prior to performing finite element modeling and analysis. Results showed corresponding deformations for the crown and the excavation front to be 3.5cm (1.4in) and 6cm (2.4in), respectively. Considering the complexity of Mexico City's difficult subsoil formation, construction method selection becomes a challenge to overcome. The use of a preliminary results in order to have a notion of possible deformations prior to advanced modeling and analysis could be beneficial and helpful to select possible construction procedures.