• Title/Summary/Keyword: critical delay factors

Search Result 56, Processing Time 0.029 seconds

Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems

  • Kim, Hyun-Mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.636-647
    • /
    • 2012
  • Construction projects have become so large, complicated and incredibly high-tech that process management is currently considered one of the most important issues. Unlike typical manufacturing industries, most major construction activities are performed in the open air and thus are exposed to various environmental factors. Many studies have been conducted with the goal of establishing efficient techniques and tools for overcoming these limitations. Productivity analysis and prediction, one of the related research subjects, must be considered when evaluating approaches to reducing construction duration and costs. The aim of this research is to present a quantified impact analysis of construction delay factors on construction productivity of a steel staircase system, which has been widely applied to high rise building construction. It is also expected to improve the process by managing the factors, ultimately achieving an improvement in construction productivity. To achieve the research objectives, this paper analyzed different delay factors affecting construction duration by means of multiple regression analysis focusing on steel staircase systems, which have critical effects on the preceding and subsequent processes in structure construction. Statistical analysis on the multiple linear regression model indicated that the environment, labor and material delay factors were statistically significant, with 0.293, 0.491, and 0.203 as the respective quantified impacts on productivity.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

Burn Delay Analysis of the Lunar Orbit Insertion for Korea Pathfinder Lunar Orbiter

  • Bae, Jonghee;Song, Young-Joo;Kim, Young-Rok;Kim, Bangyeop
    • Journal of Astronomy and Space Sciences
    • /
    • v.34 no.4
    • /
    • pp.281-288
    • /
    • 2017
  • The first Korea lunar orbiter, Korea Pathfinder Lunar Orbiter (KPLO), has been in development since 2016. After launch, the KPLO will execute several maneuvers to enter into the lunar mission orbit, and will then perform lunar science missions for one year. Among these maneuvers, the lunar orbit insertion (LOI) is the most critical maneuver because the KPLO will experience an extreme velocity change in the presence of the Moon's gravitational pull. However, the lunar orbiter may have a delayed LOI burn during operation due to hardware limitations and telemetry delays. This delayed burn could occur in different captured lunar orbits; in the worst case, the KPLO could fly away from the Moon. Therefore, in this study, the burn delay for the first LOI maneuver is analyzed to successfully enter the desired lunar orbit. Numerical simulations are performed to evaluate the difference between the desired and delayed lunar orbits due to a burn delay in the LOI maneuver. Based on this analysis, critical factors in the LOI maneuver, the periselene altitude and orbit period, are significantly changed and an additional delta-V in the second LOI maneuver is required as the delay burn interval increases to 10 min from the planned maneuver epoch.

A Study on the Critical Meteorological Factors Influencing the Flight Cancelation and Delay: Focusing on Domestic Airports (국내 항공운항에서 기상현상이 결항 및 지연에 미치는 영향 분석)

  • Lee, Joong-Woo;Ko, Kwnag-Kun;Kwon, Tae-Sun;Lee, Ki-Kwang
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.19 no.1
    • /
    • pp.29-37
    • /
    • 2011
  • Last April, Europe was severly damaged as all social and economic activities came to a halt prompted by the cancellation of all flights resulting from volcanic ash. This exemplifies that the meteorology conditions have significant influence on the flights of airplanes. Hence, in this research the influence that the meteorology has on the domestic flights and its characteristics will be examined, and the core meteorological factors that influence flights in each airport will be drawn. In order to do this, statistical analysis on the influence that the meteorology has on flights was carried out in order to analyze the data about flight cancelation and delay and also its cause, primarily based on the Gimpo, Gimhae, and the Jeju airports. As a result, first, the meteorological factors which impact flight cancellation and delay were different among the domestic airports, and second, it was analyzed that fog was the main meteorological factor in the Gimpo airport, strong wind in the Jeju airport, and fog in the Gimhae airport. Third, between the day the flights were cancelled and delayed occurred, and the day that weren't, the fact that there existed a difference among the actual meteorological factors was statistically drawn. With the result of such analysis, meteorological factors pertaining to the cancellation and delay of flights must be considered seperately by each airport and specialized meteorological information must be provided accordingly. Further, when selecting the position of an airport that is to be constructed in the future, implications that there is a definite need for the meteorology effect evaluation based on past meteorology data can be drawn.

An Improvement in Intra-Slice Low Delay Video Coding for Digital TV Broadcasting (디지틀 TV 방송을 위한 저지연 intra-slice 영상 부호화 방식의 개선 방법)

  • 권순각;김재균
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.19 no.12
    • /
    • pp.2376-2385
    • /
    • 1994
  • In receiving the digital TV signal, both decoding delay and the channel hopping delay are very critical factors in applications. The intra-slice coding in the MPEG-2 SIMPLE PROFLE of No B-picture is one of the primary methods for short delay time in video decoding. It has the advantage of short decoding delay, but has the drawback of long channel hopping delay time. In this paper, we propose a method to reduce the channel delay with negligible loss in SNR performance. It is shown that dividing pictures into several regions of slices and adding some restriction in motion vector search for inter-frame coding. hence the random acess points are effectively increased. and the channel hopping delay is reduced.

  • PDF

Factors Determining the Timing of Tracheostomy in Medical ICU of a Tertiary Referral Hospital

  • Park, Young-Sik;Lee, Jin-Woo;Lee, Sang-Min;Yim, Jae-Joon;Kim, Young-Whan;Han, Sung-Koo;Yoo, Chul-Gyu
    • Tuberculosis and Respiratory Diseases
    • /
    • v.72 no.6
    • /
    • pp.481-485
    • /
    • 2012
  • Background: Tracheostomy is a common procedure for patients requiring prolonged mechanical ventilation. However, the timing of tracheostomy is quite variable. This study was performed to find out the factors determining the timing of tracheostomy in medical intensive care unit (ICU). Methods: Patients who were underwent tracheostomy between January 2008 and December 2009 in the medical ICU of Seoul National University Hospital were included in this retrospective study. Results: Among the 59 patients, 36 (61.0%) were male. Median Acute Physiology And Chronic Health Evaluation (APACHE) II scores and Sequential Organ Failure Assessment scores on the admission day were 28 and 7, respectively. The decision of tracheostomy was made on 13 days, and tracheostomy was performed on 15 days after endotracheal intubation. Of the 59 patients, 21 patients received tracheostomy before 2 weeks (group I) and 38 were underwent after 2 weeks (group II). In univariate analysis, days until the decision to perform tracheostomy (8 vs. 14.5, p<0.001), days before tracheostomy (10 vs. 18, p<0.001), time delay for tracheostomy (2.1 vs. 3.0, p<0.001), cardiopulmonary resuscitation (19.0% vs. 2.6%, p=0.049), existence of neurologic problem (38.1% vs. 7.9%, p=0.042), APACHE II scores (24 vs. 30, p=0.002), and $PaO_2/FiO_2$ <300 mm Hg (61.9% vs. 91.1%, p=0.011) were different between the two groups. In multivariate analysis, APACHE II scores${\geq}20$ (odds ratio [OR], 12.44; 95% confidence interval [CI], 1.14~136.19; p=0.039) and time delay for tracheostomy (OR, 1.97; 95% CI, 1.11~3.55; p=0.020) were significantly associated with tracheostomy after 2 weeks. Conclusion: APACHE II scores${\geq}20$ and time delay for tracheostomy were associated with tracheostomy after 2 weeks.

A study of the enhanced ATM cell transmission in satellite communication system using variable-size block interleaving (위성망에서 가변블록 인터리빙 기법을 이용한 ATM 셀 전송 성능향상에 관한 연구)

  • 김은경;김낙명
    • Journal of the Korean Institute of Telematics and Electronics S
    • /
    • v.35S no.5
    • /
    • pp.1-10
    • /
    • 1998
  • Satellite communication is getting more important in the coming 21st century because of its wide areas sevice capability, ease of access, and fast channel establishment. As such, satellite communication networks will be the basis of the global communication system in cooperation with the ground ATM networks. In this paper, we consider an efficient transmission methodology of ATM cells over the satellite communication channel. We first analyze possible bottlenecks and performance deterioration factors in the case, and then propose an enhanced cell trasmission mechanism. In order to use satellite channel for ATM cell transmission, the application of complicated channel coding is inevitable. However, the forwared error control such as convolutional encoding brings forth burst errors, which calls for the application of some kind of interleaving mechanism to randomize the burst errors at the receiver. Another aspect which should b econsidered in satellite communication system is the inherent transmission delay, which can be very considered in satellite communication system is te inherent transmission delay, which can be very critical to the delay-sensitive ATM traffic. Therefore, we propose that the processing delay at the block interleaving stage should be controlled propose a variable-size block interleaving mechanism which utilizes the predicted transmission delay for each traffic in the queues of the transmitter. According to the computer simulation, the proposed mechanism could improve the overall performance by drastically reducing the ATM cell drop rate owing to the excessive transmission delay.

  • PDF

A Study on the Combustion Characteristics of Diesel Engine by the Change of the Intake Air Composition (흡기조성 변화에 따른 디젤 기관의 연소 특성 변화)

  • 김세원;임재문
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.18 no.2
    • /
    • pp.91-96
    • /
    • 1994
  • Intake gases other than air, which is composed of oxygen, nitrogen, carbon dioxide, and argon, are used to study their effects on the performance of the diesel engine experimentally. The engine is operated at constant speed and fixed fuel injection timing, and cylinder pressure and heat release rate are measured at various intake gas compositions. The results show that increase of oxygen concentration improves the performance of the engine generally. The adverse effect is observed when the oxygen concentration is increased over the critical oxygen concentration of this test, mainly because of the over-shortened ignition delay. Increase of carbon dioxide concentration degardes the performance of the engine, mainly due to the lower specific heat ratio of carbon dioxide. Adding argon gas to the intake gas improves the overall performance. Finally, it is found that two most influencing factors affecting the performance of the diesel engine in this study are ignition delay and speific heat ratio of the intake gas.

  • PDF

IDENTIFYING CRITICAL RISKS IN PUBLIC PRIVATE PARTNERSHIP PROJECTS IN SINGAPORE

  • Xianbo Zhao;Bon-Gang Hwang;Mindy Jiang Shu Gay
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.444-450
    • /
    • 2013
  • Public private partnership (PPP) procurement was introduced into Singapore in 2003, and 10 PPP projects was successfully completed and have been in operation. The objective of this study is to identify the critical risk factors and risk allocation preferences for PPP projects in Singapore. To achieve this objective, a comprehensive literature review was carried out and 42 risks were identified and grouped into three meta levels, i.e. macro, meso and micro levels. The questionnaire survey produced 48 completed questionnaires from 48 different contractors. The survey results indicated that 23 risk factors had significantly high criticalities and that four macro-level risks, four meso-level risks and two micro-level risks were among the top 10 risk ranking. "Lack of support from government", "availability of finance" and "construction time delay" were perceived as the top three critical risks. Also, the result implied that micro-level risks had a higher criticality mean score than macro-level and meso-level risks. The findings of this study help both public and private sectors to better understand the risks and their allocation in PPP projects, providing valuable information for organizations that intend to participate in PPP projects in Singapore.

  • PDF

Estimating Utilization Factor of Left Turn Lane for Through Traffic, Intersection Capacity, and Optimum Signal Timings (직진교통의 좌회전차선 이용률 추정과 교차로용량 및 최적신호등시간 산정)

  • 도철웅
    • Journal of Korean Society of Transportation
    • /
    • v.1 no.1
    • /
    • pp.56-63
    • /
    • 1983
  • Intersection control has dual-purposes; increasing capacity and reducing delay. The primary concern of efficient intersection control under oversaturated condition as in Korea is to increase capacity. Prevailing intersection operation technique permits thru traffic to utilize left turn lane, because the intersection without left turn pocket has left turn signal interval. In this situation, it seems not to be valid to calculate capacity, delay, and signal timings by conventional methods. By critical lane technique, capacity increases as cycle length increases. However, when thru traffic utilize LT lane, the capacity varies according to LT volume, LT interval as well as cycle length, which implies that specific cycle length and LT interval exist to maximize capacity for given LT volume. The study is designed is designed to calculate utilization factors of LT lane for thru traffic and capacities, and identify signal timings to yield maximum capacity. The experimental design involved has 3 variables; 1)LT volumes at each approach(20-300 vph), 2)cycle lengths (60-220 sec), and 3)LT intervals(2.6-42 sec) for one scenario of isolated intersection crossing two 6-lanes streets. For LT volume of 50-150 vph, capacity calculated by using the utilization factor is about 25% higher than that by critical lane method. The range of optimum cycle length to yield maximum capapcity for LT volume less than 120 vph is 140-180 sec, and increases as LT volume increases. The optimum LT interval to yield maximum capacity is longer than the intrval necessary to accommodate LT volume at saturation flow rate.

  • PDF