• Title/Summary/Keyword: crane equipment

Search Result 170, Processing Time 0.028 seconds

A Study on Fatigue Assessment of the Crane Post due to Vibration during the Emergency Stop (충격하중에 의한 Jib Crane Post의 피로 수명 평가)

  • Kim, Kuk-Su;Kim, Nho-Seong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.633-637
    • /
    • 2011
  • The tall and slender main crane is generally installed on the upper deck to load and unload the equipment or something heavy in the drilling rig or the ship. So the natural frequency of the crane equipment is very low, therefore, there is some possibility of excessive vibration at the emergency state due to sudden stop during the crane operation. This study describes a fatigue assessment due to heavy vibration during brake test of sudden stop because it is necessary the safety of crane is estimated against the heavy vibration. In order to find out the applied force, the vibration measurement and analysis have been performed.

  • PDF

A Study for Monitoring Operator of Container Terminal (컨테이너 터미널의 모니터링 운영에 관한 연구)

  • 김영호;김정수;박병열;이성관;배종일
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.64-64
    • /
    • 2000
  • The contributing proportion of the increase of port productivity is more increasing concerning not only the port industry, but also all the informations of container crane which is the representative equipment by the rapid increase of the volume of freight of port. The basic of rapid service is the improvement of the productivity, the information of operation as to the productivity of crane for the quick handling within yard and especially the informations of breakdown and to handle breakdown as soon as possible has a great effect on the increase of productivity.

  • PDF

Development of partial state feedback control algorithm for nonlinear overhead crane whose two axes are moved simultaneously (두 축이 동시에 운동하는 비선형 천장 크레인의 부분상태 궤환제어 알고리즘 개발)

  • 이종규;이상룡
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.395-398
    • /
    • 1996
  • In this study, when the nonlinear overhead crane which allows simultaneously travel and traverse motion moves a desired transport route, the object suspended the end of rope does undesirable swing motion. Nonlinear overhead crane pertubes in the vicinity of an operating point, therefore the nonlinear overhead crane is modified to linear overhead crane for the operating point. The linear overhead crane was controlled to swing angles of the object by the ratio of torque inputs to motors of the girder and the trolley. As a basis for the result of the linear overhead crane, the nonlinear overhead crane was controlled swing angles of the object and positions of the overhead crane without collision with environmental equipment by partial state feedback control.

  • PDF

Yard Design of the Container Terminal using the Simulation (시뮬레이션을 이용한 컨테이너 터미널의 장치장 설계)

  • 하태영;최용석;김우선
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.35-40
    • /
    • 2003
  • This paper presents a method for designing layout on the yard and evaluating alternative designs of the layout by applying simulation. The method is based on the concepts of the conventional port container terminal with a perpendicular yard layout. In general, yard design of the container terminal is consists of the two major parts. One is to divide yard area between the number of sections and the number of runs and the other is to decide the number of equipment that is the yard truck and yard crane. In the past days, this design was depended on the experience of the terminal operator and the structure of the conventional terminal layout because it is a very complex decision problem. In this paper we suggest the method of yard design as a conceptual procedure and estimate the efficiency of the container crane and the optimal the number of equipment using the simulation. Numerical examples are provided in order to illustrate the conceptual procedure. As the example, the suggested method and simulation are applied to the virtual container terminal with a perpendicular yard layout. In the results, the number of sections and runs on yard area, the number of yard truck per container crane and the number of yard crane per run are decided. In additional, the traffic among blocks on yard layout is estimated in terms of rate.

  • PDF

Analysis of Perceived Accident Causes and Special Training Status for Safety of Crane Operation (크레인 작업의 안전성 향상을 위한 작업자 체감 사고 원인 및 특별교육 현황 분석)

  • Lee, Yongseok;Jung, Kihyo
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.1
    • /
    • pp.91-98
    • /
    • 2022
  • Since cranes are a kind of complex human-machine systems, it is almost impossible to completely secure safety with current technologies. Therefore, managerial interventions to prevent human errors are needed for safely operating a crane. The Occupational Safety and Health law states that cabin-type crane operators should have crane drivers' licence and crane-related operators (e.g., pendent-type crane operators, slinging workers) should take a special safety training. However, statistics on industrial accidents showed that fatalities due to crane accidents (185 accidents occurred during 2013~2017) were the highest among hazardous machinery and equipment. To effectively control the crane-related accidents, voices of crane workers need to be analyzed to investigate the current status. This study surveyed perceived causes of crane accidents and status of special safety training for crane workers of 387. The survey revealed that 24.3% of the respondents experienced crane accidents and 31.4% eye-witnessed crane accidents. 79% of the respondents pointed human errors such as improper crane operation and improper slinging as the first cause. Lastly, only 16.7% of the respondents took a professional special safety training; but the rest took lecture-based or incomplete education. The findings of the present study can be applied to improve crane-related policies and special safety training systems.

Communication Networks for Automated Crane Terminals (자동화 크레인 터미널을 위한 통신망에 관한 연구)

  • 이경창;이석;이장명;이만형
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.357-361
    • /
    • 1999
  • Currently, many research projects are focusing on automation of various equipment such as cranes and AGV's for automated container terminals. However, for more productivity of these terminals, integration of the required equipment is most crucial as proved in Computer Integrated Manufacturing (CIM). The integration requires information exchange via a type of network interconnecting various pisces of equipment. In order to better design such networks, this paper presents the requirements, available protocols, and basic network structure for an communication network in an automated crane terminal

  • PDF

Basic research, according to the inspection of crane equipment (크레인 설비의 검사에 따른 기초연구)

  • An, Tae-Keon;Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.169-175
    • /
    • 2012
  • Self-Inspection is being used in the workplace hazardous, dangerous machinery and equipment to build capacity for the voluntary safety risks due to use of machinery and prevention of industrial accidents that inspect facilities for safety issues, is to check. However, December 31, 2008 as part of Article 36 of the Occupational Safety and Health Act (safety inspection), the financial vanish as the self-test, Safety inspection program has been changed., In each individual workplace that creates its own standards and regulations to use the existing inspection system is in some cases. This study is located in the southeast industrial complex as a risk reducer manufacturer, machine-based target zones in S Corp owns most of the crane based on the results of the tests is to analyze the problem. Then check the results - to bring its measures and information you need to know for sure is to propose.

A COMPARISON OF OLD AND NEW OSHA REGULATIONS ON CRANES AND DERRICKS USING COMPREHENSIVE GAP ANALYSIS

  • Chung-Suk Cho;Francis Boafo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.74-79
    • /
    • 2013
  • Aiming at reducing deaths and injuries involving construction crane operations, OSHA has recently updated its 40-year-old crane safety standards with new rules addressing the use of cranes and derricks in construction. The goal of this change in rule is to deal with the leading causes of fatalities related to crane and derrick operations. Employers in the construction industry are mandated to ensure that employees in the work zone are trained to recognize hazards associated with the use of the equipment and any related duties that they are assigned to perform. However, those responsible at construction sites for the supervision and management of safe crane operations often lack the integrated knowledge of the standards, regulations and best practices for conducting or supervising daily, monthly, or quarterly inspection of cranes. As such, proper planning, management and implementation of crane operations, including inspections are just as paramount to reducing accidents on the construction site. It is important that engineers responsible for the management and planning of crane operations understand the latest OSHA crane and hoisting standards to ensure a safer work environment is maintained. Many on site engineers overseeing crane operations do not have adequate training, experience, and knowledge of the inspection requirements to assess safe crane operation and too often rely on the crane operator's judgement. This paper highlights recent research effort in defining significant changes in new crane and hoisting standards and provides basis for safety construction operations.

  • PDF

Development of Intelligent Hydraulic Excavator System with Crane Function (크레인 기능 부착 지능형 유압 굴삭기 시스템 개발)

  • Lee, Hong-Seon;Lee, Min-Hee;Lim, Tae-Hyeong;Chun, Se-Young;Yang, Soon-Yong
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.15 no.5
    • /
    • pp.29-36
    • /
    • 2006
  • The hydraulic excavators are mainly applied for excavating, public works, quarrying, etc. In some of the construction site, however, they are used for crane works of relatively light materials, although the crane works by the hydraulic excavators are forbidden by law due to the safety reasons. The major construction equipment companies in forward countries have been developing the new systems, e.g. crane works by the hydraulic excavators, and they are working in the construction site. Therefore, the new system of crane works by the hydraulic excavators should be developed for the domestic construction site in order to prevent the accident. In this paper, the fundamental study and experiment are accomplished for the crane system application on the hydraulic excavators.

Vibration reduction of provision crane in a ship by structural dynamic modification (구조변경을 통한 선박용 Provision Crane의 진동저감)

  • 김극수;조성재;최수현
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.433-437
    • /
    • 2004
  • A provision crane is generally installed on the upper deck to the rear of the accommodation of the ship in order to load and unload engine part or something heavy. There are two types of provision cranes: one is jib-type and the other is monorail-type. So the natural frequency of the jib-type crane equipment is low, therefore, there are some possibility of resonance between crane structure and the main excitation sources of the ship in normal operating range. This study describe a vibration reduction technique for provision crane by applying a proper countermeasure through finite element analysis and modal test. In order to find out weak point in design of provision crane, a sensitive analysis has been performed.

  • PDF