Carbonation is one of the major detrimental factors to the reinforced concrete structures owing to penetration of atmospheric CO2 through the micro pores, thereby it reduces the durability of the concrete. The maintenance periods and cost for concrete according to the coefficient variation of different finishing materials is documented in literature. However, it is required to carry out the systematic and well planned studies. Therefore, keeping them in mind, surface repair was carried out to the carbonated concrete and the maintenance cost was calculated to measure the durability life after repair with different variable. The deterministic and probabilistic methods were applied for durability and repair cost of the concrete. In the existing deterministic model, the cost of repair materials increases significantly when the concrete structure reaches its service life. In present study using a stochastic model, the maintenance period and cost was evaluated. According to obtained results, there was no significant difference in the number of maintenance of the coefficient variation. The initial durability has a great influence on the maintenance time and cost of the structure. Unlike the deterministic model, the probabilistic cost estimating model reduces the number of maintenance to the target service life expectancy.
공공아파트 프로젝트의 기획단계에서 수행되는 적정 공사비 예측은 기획부터 유지관리까지 전(全) 단계에 걸쳐서 영향을 미치게 되므로 명확한 예측기준 및 방법이 제시되어야 한다. 그러나 현재까지 다양한 다중회귀모델을 활용한 공사비 예측 방법이 개발되어 왔으나, 정성변수를 포함하여 공사비를 예측하는 방법에 대한 연구는 부족한 상황이다. 따라서 본 연구에서는 기획단계 활용을 위한 정성변수를 포함하는 공사비 예측모델을 개발하고자 하였다. 이를 위하여 공사비 영향요인을 분석 및 추출하고, 회귀분석을 위한 독립변수를 선정하였다. 그리고 정성변수를 포함하는 공사비 예측모델을 개발하며 사례적용을 통한 검증을 실시하였다. 개발된 공사비 예측모델과 "RESAMPLING 기법"을 사용하여 구조형식별 공사비 가산비율을 제시하였다. 본 연구에서 제시한 더미회귀모델과 가산비율을 활용하면, 일반적인 공사비 예측과 함께 동일한 평형, 세대수, 연면적에서 평면형식과 구조형식을 변경시켰을 때의 공사비 예측이 가능할 것으로 기대된다.
During the design phase of a product, reliability and design engineers are called upon to evaluate the reliability of the system, The question of how to meet target reliability for the system arises when estimated reliability or cost is inadequate. This then becomes a problem of reliability allocation and system structure design. This study proposes the optimization methodology to achieve target reliability with minimum cost through construction of the cost function of system. In cost function, total cost means the sum of initial cost, repair cost and maintenance cost. This study constructs optimization problem about system structure design and reliability allocation using cost function. This problem constructed is solved by Multi-island Genetic Algorithm(MIGA), and applies to urban transit brake system. Current brake system of the urban transit is series system. Series system is the simplest and perhaps one of the most common system, but it demands high reliability and maintenance cost because all components must be operating to ensure system operation. Thus this study makes a comparative study by applying k-out-of-n system to brake system. This methodology presented can be a great tool for aiding reliability and design engineers in their decision-makings.
The current study aims to help field managers of companies providing foodservice for institutions to establish the more appropriate cost management strategy by analyzing the cost structure of foodservice center in institutions by operating types and the number of people served. From the result analyzing 161 foodservice centers, the number of factories was highest with 39.8% while offices 26.7%, schools 20.5%, and hospitals 13%. In terms of the number of people served, below 500 persons was 27.6%, 501${\sim}$l,000 persons was 23.9%, 1,001${\sim}$2,000 persons was 22.7%, and over 2,001 persons was 25%. In the demographic characteristics of managers, women occupied over 92%. The reason for this is usually dieticians perform management duties. For the age of workers, 70.8% were older than 40s, which ran become the cause of a rise in cost by causing the decrease of productivity by aging. Therefore, appropriate countermeasures are required. In case of workers in production, women occupy 962 persons (82.2%) rating absolute majority like mangers. This is because cooks are in charge of almost every producing activity of meal facilities. In addition, more than 72.9% of workers in production were over 40 years old, which requires diversified studies to promote efficiency of production associated with the aging problem. In proportion of sales compared with cost material cost presented the highest percentage with 54.5% while labor cost 28.3%, general expenses 9.6% and business profit 7.6%.
The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
/
pp.133-137
/
2017
Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.
In the defense acquisition, a company's goal is to maximize profits, and the government's goal is to allocate budgets efficiently. Each year, the government estimates the ratio of indirect cost sector to defense companies, and estimates the ratio to be applied when calculating cost of the defense articles next year. The defense industry environment is changing rapidly, due to the increasing trend of defense acquisition budgets, the advancement of weapon systems, the effects of the 4th industrial revolution, and so on. As a result, the cost structure of defense companies is being diversifying. The purpose of this study is to find an alternative that can enhance the rationality of the current methodology for estimating the ratio of indirect cost sector of defense companies. To do this, we conducted data analysis using the R language on the cost data of defense companies over the past six years in the Defense Integrated Cost System. First, cluster analysis was conducted on the cost characteristics of defense companies. Then, we conducted a regression analysis of the relationship between direct and indirect costs for each cluster to see how much it reflects the cost structure of defense companies in direct labor cost-based indirect cost rate estimates. Lastly a new ratio prediction model based on regularized regression analysis was developed, applied to each cluster, and analyzed to compare performance with existing prediction models. According to the results of the study, it is necessary to estimate the indirect cost ratio based on the cost character group of defense companies, and the direct labor cost based indirect cost ratio estimation partially reflects the cost structure of defense companies. In addition, the current indirect cost ratio prediction method has a larger error than the new model.
최근 정부의 주택보급정책 강화에 따라 공공아파트 건설공사의 건축공사비에 대한 관심이 높아지고 있다. 그러나 현재 공공아파트 공사비내역 구성은 공종별 분류체계로 구성되어 있어, 공공아파트의 건축공사비를 체계적으로 예측하는 것은 현실적으로 많은 문제점을 지니고 있다. 이에 본 연구에서는 공공아파트 프로젝트 기획 및 설계단계에서 좀 더 합리적인 공사비 예측을 위해, 델파이분석(Delphi)기법을 이용하여 공공아파트 공간별 공사비분류체계를 개발하였다. 공공아파트 공간별 공사비분류체계는 공공아파트의 공간별 특성을 반영하여 주택부문, 주택외부문, 가산부문 등으로 구분하였으며, 각각의 부문을 공간별 해당 부위와 각 세부공종으로 세분화하였다. 또한 구축된 공간별 공사비분류체계에 공공아파트 공사비 내역서를 분석하여 공간별 분류체계의 실용성 및 유효성을 검증하였다.
건축물의 생애주기비용은 시행과정 전 단계에서 상호 연관되어 비용이 발생하며 각 단계마다 서로 간에 영향력이 존재한다. 하지만 건축 프로젝트의 각 단계별 CBS가 서로 상이하여 합리적인 공사비를 산정하는데 문제점이 발생한다. 따라서 본 연구에서는 기존에 연구되었던 LCCBS를 바탕으로 건축 프로젝트 각 단계 간에 경계조건을 분석하였다. 또한 분석된 경계조건을 바탕으로 분절요인을 분석하고 이에 따른 연계방안을 모색하였다. 연계방안의 유효성 검증을 위해 실제 건축프로젝트를 바탕으로 사례적용을 실시하였다. 분석결과 누락되는 항목이 97.2%이상을 개선하였고 평균 6시간 빠르게 업무를 수행할 수 있음을 확인할 수 있었다. 향후, LCC 시스템에 적용함으로써 LCC의 효율적인 산정 및 LCC 절감을 계획할 수 있을 것으로 사료다.
한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
/
pp.129-138
/
1993
The shortage of agricultural labour due to industrial growth has greatly induced the mechanization in Korean agriculture. However small and scattered land holdings have been the main constraints in the process of mechanization. This paper describes the interrelationships of farm land structure, machinery selection and machinery operation areas. The sandy silt loam irrigated paddy land having single crop a year was selected as a target areas for this study. Machine operation cost is greatly influenced by operation period, plot geometry and operation area. On the improved geometry plots, optimal machine size increases slowly with increase in operation area. Operable area increases due to increased effective machine capacity on better geometry plot. The difference between the effects of operation period and plot geometry is that in the former case, the cost reduction is caused by delay in increase of machine size, whereas in the latter case timeliness cost is reduced by increase ffective capacity. The effect of farmland consolidation is greater on small plots than that on big plots. Increasing wage rates have induced the adoption of more labor saving machinery. Bigger labor saving machines require enlargement of operation area and larger plots through improvement in farm land structure. Machine cost on poor plot geometry increases more rapidly than that on the good plot geometry and as operation area increases machine cost reduces significantly. It is concluded that the development of agricultural mechanization ion Korea will depend on the improvement in farm land structure and enlargement of operation area.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.