• Title/Summary/Keyword: cost reduction potential

Search Result 205, Processing Time 0.025 seconds

Evaluation of Green House Gases (GHGs) Reduction Plan in Combination with Air Pollutants Reduction in Busan Metropolitan City in Korea

  • Cheong, Jang-Pyo;Kim, Chul-Han;Chang, Jae-Soo
    • Asian Journal of Atmospheric Environment
    • /
    • v.5 no.4
    • /
    • pp.228-236
    • /
    • 2011
  • Since most Green House Gases (GHGs) and air pollutants are generated from the same sources, it will be cost-effective to develop a GHGs reduction plan in combination with simultaneous removal of air pollutants. However, effects on air pollutants reduction according to implementing any GHG abatement plans have been rarely studied. Reflecting simultaneous removal of air pollutants along with the GHGs emission reduction, this study investigated relative cost effectiveness among GHGs reduction action plans in Busan Metropolitan City. We employed the Data Envelopment Analysis (DEA), a methodology that evaluates relative efficiency of decision-making units (DMUs) producing multiple outputs with multiple inputs, for the investigation. Assigning each GHGs reduction action plan to a DMU, implementation cost of each GHGs reduction action plan to an input, and reduction potential of GHGs and air pollutants by each GHGs reduction action plan to an output, we calculated efficiency scores for each GHGs reduction action plan. When the simultaneous removal of air pollutants with the GHGs reduction were considered, green house supply-insulation improvement and intelligent transportation system (ITS) projects had high efficiency scores for cost-positive action plans. For cost-negative action plans, green start network formation and running, and daily car use control program had high efficiency scores. When only the GHGs reduction was considered, project priority orders based on efficiency scores were somewhat different from those when both the removal of air pollutants and GHGs reduction were considered at the same time. The expected action plan priority difference is attributed to great difference of air pollutants reduction potential according to types of energy sources to be reduced.

Assessment of Project Cost Reduction Potential Adopting Cases-Synthetic Approach - Focused on the Apartment Building Construction Project - (시공방법 개선사례 조합에 의한 원가절감 가능성 평가)

  • Choi, Jong-Soo;Choi, Young-Jun;Chae, Seong-Tae;Yoo, Sung-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.135-144
    • /
    • 2009
  • The primary focus of this study has been directed towards assessing the potential impact of construction method improvement on a reduction in project cost. A total of 90 actual application cases were collected from a public organization and private construction firms, and 32 cases were used in analysis by adopting a synthetic approach. The level of cost reduction was measured in terms of material and labor cost by comparing the existing method and the improved method. An analysis of the results indicates that project cost can be reduced by up to 5.26 percent compared to a normal project by adopting a synthetic approach. Additional benefits include the assurance of uniform quality, savings in terms of labor and/or materials, and improved productivity. The potential of the applicability of this approach to other types of buildings and the implications of research findings were discussed in detail.

Characteristics of Cost Reduction Strategies at Pre-Construction Stages - Focused on Best Practice Cases - (시공이전단계 원가절감 전략의 특징에 관한 연구 - 모범적 성공사례를 중심으로 -)

  • Jung Hui-Ok;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.616-619
    • /
    • 2004
  • The term 'cost reduction' often carries a negative image in a sense of sacrifice of other management elements such as qualify, safety, client satisfaction, etc. However creative cost reduction approaches can achieve not only cost reduction itself but also value for money. The objective of this paper is to identify and discuss major characteristics of creative cost reduction strategies from best practice cases of Constructing Excellence.

  • PDF

Cost and Benefit Analysis for Safety Management Cost by FMEA/HAZOP at Governor Station (가스 공급기지에서 FMEA/HAZOP에 의한 안전관리 비용-편익분석)

  • 장서일;이헌창;조지훈;오신규;김태옥
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.1-9
    • /
    • 2001
  • Cost-benefit analysis was investigated to propose the analysis method of the effect of investment and the optimum investment level of safety management cost for preventing gas accident in the B governor station. From five classifications of safety management costs consisting of cost items with similar characters and potential accident costs calculated by risk assessments(FMEA/HAZOP), we found that the order of the benefit(the reduction cost of the potential accident cost) was the instrument increase and repair cost > the safety checking and inspection cost > the labor and training cost > the safety equipment and corresponding cost > the research and development cost. As the benefit was increased with increasing the investment cost, the effect of investment was increased with decreasing the Investment cost. As a result, the optimum safety management cost was estimated and the investment level was analyzed by the model of optimum investment level.

  • PDF

A Basic Study of Automatic Rebar Length Estimate Algorithm of Slab by Using BIM-Based Shape Codes Built in Revit (BIM 기반 형상코드를 이용한 슬래브 철근길이 자동 산정 기초 연구)

  • JI, Woo-Min;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.89-90
    • /
    • 2023
  • This dissertation investigates the feasibility of accurately calculating the required rebar length using BIM-based shape codes and the potential benefits of such an approach in terms of cost reduction, waste reduction, and environmental improvement. The study aims to explore the possibility of automatically calculating slab rebar length before construction to reduce rebar cutting waste and cost. The results of this study will provide insights into the potential of using shape codes to reduce rebar cutting waste and cost in building frame construction.

  • PDF

Relative Cost Modeling for Main Component Systems fo Parallel Hybrid Electric Vehicle (병렬 하이브리드 전기자동차의 주요 구성시스템에 대한 상대적 가격 모델링)

  • Kim, Pill-Soo;Kim,Yong
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.48 no.6
    • /
    • pp.294-300
    • /
    • 1999
  • There is a growing interest in hybrid electric vehicles due to environmental concerns. Recent efforts are directed toward developing an improved main component systems for the hybrid electric vehicle applications. Soon after the introduction of electric starter for internal combustion engine early this century, despite being energy efficient and nonpolluting, electric vehicle lost the battle completly to internal combustion engine due to its limited range and inferior performance. Hybrid Electric vehicles offer the most promising solutions to reduce the emission of vehicles. This paper describes a method for cost reduction estimation of parallel hybrid electric vehicle. We used a cost reduction structure that consisted of five major subsystems (three-type and two-type motor) for parallel hybrid electric vehicle. Especially, we estimated the potential for cost reductions in parallel hybrid electric vehicle as a function of time using the learning curve. Also, we estimated the potentials of cost by depreciation.

  • PDF

The Economic Value Analysis of the Potential Wind Farm Site Using the Black-Scholes Model (블랙 숄즈 모델을 이용한 잠재적 풍력발전 위치의 경제적 가치분석)

  • Jaehun Sim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.21-30
    • /
    • 2022
  • To mitigate the environmental impacts of the energy sector, the government of South Korea has made a continuous effort to facilitate the development and commercialization of renewable energy. As a result, the efficiency of renewable energy plants is not a consideration in the potential site selection process. To contribute to the overall sustainability of this increasingly important sector, this study utilizes the Black-Scholes model to evaluate the economic value of potential sites for off-site wind farms, while analyzing the environmental mitigation of these potential sites in terms of carbon emission reduction. In order to incorporate the importance of flexibility and uncertainty factors in the evaluation process, this study has developed a site evaluation model focused on system dynamics and real option approaches that compares the expected revenue and expected cost during the life cycle of off-site wind farm sites. Using sensitivity analysis, this study further investigates two uncertainty factors (namely, investment cost and wind energy production) on the economic value and carbon emission reduction of potential wind farm locations.

Motion Planning for Mobile Robots Using a Spline Surface

  • Kato, Kiyotaka;Tanaka, Jyunichi;Tokunaga, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1054-1059
    • /
    • 2005
  • The artificial potential method uses a potential field to guide a robot from a start to a goal configuration respectively. The potential field consists of attractive potential used to pull a robot toward a goal and repulsive potential to keep it away from obstacles. However, there are two problems concerning local minimum and computational cost to be resolved in conventional artificial potential methods. This study proposes a method utilizing a spline surface that interpolates arbitrary boundaries and a domain reduction method that reduces the unnecessary area. The proposed spline surface interpolates arbitrary shaped boundaries and is used as an artificial potential to guide a robot for global motion planning of a mobile robot. A reduced domain process reduces the unnecessary domain. We apply a distance-weighted function as such a function, which blends distances from each boundary with a reduction in computational time compared with other analytical methods. As a result, this paper shows that an arbitrary boundary spline surface provides global planning and a domain reduction method reduces local minimum with quick operation.

  • PDF

GHG Mitigation Scenario Analysis in Building Sector using Energy System Model (에너지시스템 분석 모형을 통한 국내 건물부문 온실가스 감축시나리오 분석)

  • Yun, Seong Gwon;Jeong, Young Sun;Cho, Cheol Hung;Jeon, Eui Chan
    • Journal of Climate Change Research
    • /
    • v.5 no.2
    • /
    • pp.153-163
    • /
    • 2014
  • This study analyzed directions of the energy product efficiency improvement and Carbon Tax for the domestic building sector. In order to analyze GHG reduction potential and total cost, the cost optimization model MESSAGE was used. In the case of the "efficiency improvement scenario," the cumulative potential GHG reduction amount - with respect to the "Reference scenario" - from 2010 to 2030 is forecast to be $104MtCO_2eq$, with a total projected cost of 2.706 trillion KRW. In the "carbon tax scenario," a reduction effect of $74MtCO_2eq$ in cumulative potential GHG reduction occurred, with a total projected cost of 2.776 trillion KRW. The range of per-ton GHG reduction cost for each scenario was seen to be approximately $-475{\sim}272won/tCO_2eq$, and the "efficiency improvement scenario" showed as the highest in the order of priority, in terms of the GHG reduction policy direction. Regarding policies to reduce GHG emissions in the building sector, the energy efficiency improvement is deemed to deployed first in the future.

Performance Analysis of SMART Frame Applied to RC Column-Beam Structures (RC 라멘조에 SMART Frame 적용 시 효용성 분석)

  • Cho, Wonhyun;Lim, Chaeyeon;Jang, Duk Bea;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.168-169
    • /
    • 2015
  • SMART Frame is a composite precast concrete structure system to deliver the advantages of both steel frame and reinforced concrete. Many studies have established to date that SMART Frame is more advantageous than conventional frame-type structure in terms of structural stability, constructability, economic viability as well as reduction of construction schedule. However, such studies have focused primarily on wall-type or flat slab-type apartment housing structures, failing to include Rahmen structures in their scope. Accordingly, this study aims to analyze the benefits of potential application of SMART Frame to RC Rahmen structures. As the structural stability and constructability of SMART Frame is already proven, this study reviews its benefits from the perspective of cost reduction. Conclusion of this study will be used subsequently in predicting the benefits of SMART Frame when it is adapted to RC Rahmen structures.

  • PDF