• 제목/요약/키워드: cost improvement

검색결과 3,115건 처리시간 0.025초

Improving the Efficiency of Marketing Channel between a Wholesaler and a Retailer with Uncertain Characteristics

  • Lee, Kyung-Keun
    • 한국경영과학회지
    • /
    • 제19권1호
    • /
    • pp.169-187
    • /
    • 1994
  • The efficiency of marketing channel of distribution between a sholesaler and a retailer with uncertain characteristics can be improved by influencing the retailer's ordering pattern. The wholesaler with large unit invetory holding cost can offer a large quantity discount tanks to the great benefit which comes from the transfer of part of his inventory to retailer. The retailer's increasing average inventory holding cost can be offset by the quantity discount and by savings of the ordering cost. Conditions under which marketing channel improvement can be possible are derived.

  • PDF

Auction 알고리즘을 이용한 최단경로에 관한 연구 (A Study on the Shortest path of use Auction Algorithm)

  • 우경환
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1998년도 The Korea Society for Simulation 98 춘계학술대회 논문집
    • /
    • pp.11-16
    • /
    • 1998
  • The classical algorithm for solving liner network flow problems are primal cost improvement method, including simplex method, which iteratively improve the primal cost by moving flow around simple cycles, which iteratively improve the dual cost by changing the prices of a subset of nodes by equal amounts. Typical iteration/shortest path algorithm is used to improve flow problem of liner network structure. In this paper we stdudied about the implemental method of shortest path which is a practical computational aspects. This method can minimize the best neighbor node and also implement the typical iteration which is $\varepsilon$-CS satisfaction using the auction algorithm of linear network flow problem

  • PDF

기계화를 전제로 한 산간경사지답경지정리방안에 관한 연구(II) (A Study on the Methodology of Land-Consolidation Sloping Paddies in land Vallry for the Farm-Mechanization (II))

  • 황은
    • 한국농공학회지
    • /
    • 제24권4호
    • /
    • pp.57-68
    • /
    • 1982
  • The paddy fiels slope located in Kangweon province Hwyongsung gun Gonggeun myon Shinchonri was considerably steep and so it was impossible to economically consolidate the field up to date. But for the porpose of farm mechanization, the field (32. 27ha) was consolidated by the auther under the assitance of the Ministry of Agriculture and Fishery and,;the Administration of Kangweon province. This paddy field consolidation was caused by the treatise on "Land-consolidation methods for farm mechanization in the steep-sloped paddy field", of which the auther is the same. The constrution was carried out from September, 1981 to April, 1982. During the 4esign and construction, some Peculiarities were found and discussed. That is, in design, besides the common condititions for a design, some special conditions were considered and written below; (1) The ranges of field slope in this design were 1/100-1/30. (2) Long sides of the land readjustment blocks must be arranged abreast contour line, and so they make the amount of cutting and banking decreased so as to take the maximum advantage of the configuration of the field. (3) In design, the main principles of dividing blocks were written below; i) First of all, long side of a block should be drawn straight abreast a contour line. ii) Long side of a block should arrange abreast contour line and make its length 100-150m, if not, l)reak the side in order to make a bended rectangle. iii) Length of a short side should be determinded within differences of elevation (0.6 -1. 2m) between the two adjacent blocks toward the normal to a contour line. iv) Length of a short side should be above 15m and the ratio of long and short side should be slso kept 1: (4-6). v) A new field surface leveling was determinded from the elevation which produce the least amount of cuttingand banking within the range of 0.6-1. 2m diffe rences of elevation between the two adjacent blocks. vi) In the course of dividing blocks with the same width along the line which was normal to a contour line, all blocks connot keep their shape in a retangle because of steep slope of the field and so on, and so it was also necessory to make some non-retanglar and small blocks such as a trianglar or trapezoidal shape, which was impossible to use some of farm machinery. But because this non-rectanglar and small blocks were divided, larger and many rectanglar blocks can be divided and construction cost can also be lowered. According to the conditions discussed above, the paddy field consolidation project designed and constructed. And the results of this study were obtained as below; (1) Three-forth of total cost of this paddy field consolidation was not construction cost, and these cost consist of land grading (1/4), road and canal construction cost (1/4) and the other cost (1/4) such as surveying or materials and 56 on. (2) The steeper the land slope, the greater cost was assigned for road and canal construction, and than land grading. (3) Curtailment of the road and canal construction cost depended on simplificating their strutures. (4) In the case of the land slopes were low, the land grading cost was high by 1: 1.4 in comparison with the road and canal construction cost, and conversely when the slops were steep, the road and canal construction cost was high by 1 : 5 in compa- rison with the land grading cost. (5) The densities of irrigation canal, drainage canal and trunk and branch road were 150. Sm/ha, 60. im/ha and 17. 4m/ha respectively. The density of irrigation canal of the area was high by 2 times in comparison with the average one of Kangweon Province, and the others were nearly the same. (6) Most farmers (above 85%) knew the effects of paddy field consolidation. The effects are; 1) Improvement of irrigation 2) Improvement of farm management 3) Improvement of transportarion 4) farm mechanization and 5) grouping of the scattered land. And the more farm modernization was accomplished by these projects, the more farmers wanted to live in their land. (7) In spite of the very steep sloped paddy field, the diminution rate of the net farm land caused by consolidation was 7.7% which was nearly the same as the one of Chulweon plain of Kangweon province. Land grading cost was 971, OOOwon/ha which was rather cheap by 13.2% than the one of Ghulweon plain, and unit construction cost was 5, 341, OOOwon/ha (included soil addition) which was also nearly the same as the one of Chulweon plain and FNFIA (The federation of national farmland improvement association).

  • PDF

철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 - (A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway -)

  • 서상교;성덕룡;노병국;박용걸
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

인터넷 및 우편 원격 기관 훈련비용 기준단가 분석 연구 공학교육에 관한 연구 (A Study on Standard Unit Price Analysis of e-learning & Postal Distance Learning)

  • 나현미
    • 공학교육연구
    • /
    • 제14권3호
    • /
    • pp.61-71
    • /
    • 2011
  • Korea has introduced the levy-grand system in the vocational learning finance. The standard unit price system of training cost was utilized in the distribution of training budget and the reimbursement system including total or partial training cost return has been operated in the corporate training after completing the learning course particularly. The standard unit price was calculated in the base of analyzing on supporting budget by the government per training institutions and corporate payment decision to learning institutions. The proposing standard unit price system of training cost was analyzed in the current standard price unit of training cost and then an improvement policy and the implication are derived from it. At the result of this study, the current government supporting level to e-learning and postal distance learning indicates good status.

웹 기반의 품질코스트 관리시스템 구축 : 제2부; 시스템 구축 (A Study on Implementation and Design of Web-based Q-Cost Management System : Part 2; Implementation)

  • 김연수;정영배
    • 산업경영시스템학회지
    • /
    • 제27권4호
    • /
    • pp.179-186
    • /
    • 2004
  • The purpose of this study is to implement web-based quality cost management system to measure the performance of quality improvement activities in the business firms. Developed WQCMS(Web-based Q-Cost Management System) have ability to collect and analyze quality data generated from various different departments in the inside or outside of the enterprise without any limitations, if end-users are able to access wide area network. It provides the capability to integrate quality information from database and to generate various easy analysis reports to management's needs using built-in analysis tool modules with real-time. The proposed system was developed using Microsoft's .Net technology, ASP.NET and MS-SQL Server 2000. By web-enabling Q-cost management system, the effectiveness of the system management and utilization was realized by easiness of information integration and economical efficiency.

Square footing on geocell reinforced cohesionless soils

  • Biswas, Sefali;Mittal, Satyendra
    • Geomechanics and Engineering
    • /
    • 제13권4호
    • /
    • pp.641-651
    • /
    • 2017
  • Ground improvement with use of geosynthetic products is globally accepted now. The present paper discusses the improvement in bearing capacity of square footing placed at surface of cohesionless soil reinforced with geocell. Mohr-Coulomb failure criterion has been used in the observations. To study effects of geocell with respect to planar geogrid, model tests were conducted on planar reinforcement also. A comparative study of unreinforced soil and soil reinforced with plane geogrid and geocell has also been made. Numerical analysis results obtained by PLaxis have been compared with those obtained from model tests and were found to be in good agreement. A parametric study revealed the role of length of reinforcement, spacing between layers, placement of reinforcement from top surface etc. on bearing capacity. A design example given in paper illustrates the savings in cost of construction of footing on reinforced sand. The study shows that there is improvement in bearing capacity with respect to unreinforced soil which is of the order of 86%. Similarly settlement reduction is 13.07% for single layer of geocell which for double layers of geocell is 693% and 86.48% respectively. The cost reduction in case of reinforced soil is 35% as compared to unreinforced soil.

석유화학산업에서의 지속적 발전을 위한 손실관리시스템 개발 (The Loss Control Management System for Continuous Improvement of the Petrochemical Industries)

  • 고재욱;임동호;유진환
    • 한국가스학회지
    • /
    • 제9권3호
    • /
    • pp.15-20
    • /
    • 2005
  • 최근에 환경안전관리는 효과성, 효율성, 우수성이라는 측면에서 사고의 손실비용을 줄이기 위하여 다양하게 접근을 하고 있다. 대부분의 기업은 산업화시대의 대량생산적인 측면에서의 생산성향상보다는 기업을 건전하게 성장시킬 수 있는 손실을 감소시키는데 초점을 맞추고 있다. 본 연구는 석유화학산업에서 기본적으로 운영하고 있는 ISO14001, OHSAS18001, PSM, Responsible Care의 기본적인 요구사항과 지속적 발전을 위하여 요구되는 사항을 분석하여, 손실을 지속적으로 관리할 수 있는 석유화학공장에서의 지속적 발전을 위한 손실관리시스템(LCMCI; the Loss Control Management system for Continuous Improvement of the Petrochemical Industries)를 개발하였다.

  • PDF

Perception Based Definition of Construction Quality in Pakistan

  • Awan, Muhammad Yousaf Sadiq;Awan, Dr Muhammad Maqbool Sadiq
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.24-34
    • /
    • 2015
  • The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. A quantitative survey based approach was adopted in this constructive study. A questionnaire based survey was conducted, for the assessment of construction quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals, from the leading construction organizations/companies of Pakistan were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. After statistical analysis of survey feedback it was found reliable and valid for the inferential purpose to the target population of construction professionals. The quality perception was found to be project scope oriented, considered as an excess cost for a construction project and keeping the rework minimum by qualifying the required quality tests, keeping the defects minimum by ensuring the specifications of supplied material. Any quality improvement technique was expected to address the financial aspects of the construction project for the employer and contractor, by increasing the profitability through reduction in overall cost, reduction in time, reduction in defects and improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.