• Title/Summary/Keyword: cost evaluation items

Search Result 140, Processing Time 0.028 seconds

A Study on the Features of the Classified Customers through Pre-evaluation on the Recommender System (추천시스템에서 사전평가에 의해 선별된 고객의 특성에 관한 연구)

  • Lim, Jae-Hwa;Lee, Seok-Jun
    • Korean Business Review
    • /
    • v.20 no.2
    • /
    • pp.105-118
    • /
    • 2007
  • Recommender system is the tool for E-commerce company based on the internet for increasing their sales ratio in the market. Recommender system suggests the list of items which night be wanted by customers. This list generated by the result of customers' preference prediction through the prediction algorithm automatically. Recommender system will be able to offer not only the important information for marketing strategy but also reduce the cost of customers' information retrieval trough the analysis of customers' purchase patterns and features. But there are several problems like as the extension of the users and items scales and if the recommendation to customers generated by unreliable recommender system makes the customer royalty to the system to weaken. In this study, we propose the criterion for pre-evaluation on the prediction performance only using the preference ratings on the items which are rated by customers before prediction process and we study the features of customers who are classified through this classification criterion.

  • PDF

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

An Analysis of Core Competency of Construction Field Engineer for Cost Management (건설기술자의 원가관리 업무역량 분석 연구)

  • Choi, Jae-Hong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.26-34
    • /
    • 2013
  • Recently, many companies recognize the individual human resource as a core asset of the corporate value creation and devote a lot of effort to develop and manage competency-based human resource in order to strengthen the corporate competitiveness. As the integrated construction company taking the major portion in Korean construction industry, its construction engineers perform the construction supervision task with various related parties at each stage of the life cycle of the construction project. Therefore, the competency of a construction engineer is an important factor which have a direct impact on the success of the construction project. However, the current capability evaluation scheme of the domestic construction engineers is mainly oriented on the qualification factors such as the certificates or the seniority and this is quite different from evaluating the actual ability for construction management tasks. In this point of view, this study proposes the appropriate level of proficiency in cost management by analyzing the work process and its detailed items of the cost management that is the one of the basic management items of the construction industry. Based on this, this study analyzes the current competency level of the construction engineer by comparing with the required competency of each job position and also performs the engineer's work competency analysis of each work step.

Evaluation of Tank Capacity of Rainwater Harvesting System to Secure Economic Feasibility and Sensitivity Analysis (경제성 확보를 위한 빗물이용시설의 규모 산정 및 민감도 분석)

  • Mun, Jung-Soo;Kim, Ha-Na;Park, Jong-Bin;Lee, Jung-Hun;Kim, Ree-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.191-199
    • /
    • 2012
  • Rainwater harvesting systems (RWHS), one of measures for on site rainwater management, have been promoted by laws, regulations and guidelines and have been increased. However, more evaluation of economic feasibility on RWHS is still needed due to seasonal imbalance of rainfall and little experiences and analysis on design and operation of RWHS. In this study, we investigated tank capacity of RWHS to secure economic validity considering catchment area and water demand, which is affected by building scale. Moreover, sensitivity analysis was performed to examine the effect of design factors, cost items and increase rate of water service charge on economic feasibility. The BCR (benefit cost ratio) is proportional to the increase in tank capacity. It is increased steeply in small tank capacity due to the effect of cost and, since then, gently in middle and large tank capacity. In case of 0.05 in the rate of tank volume to catchment area and 0.005 in water demand to catchment area, BCR was over one from the tank capacity of 160 $m^{3}$ taking into account of private benefits and from the tank capacity of 100 $m^{3}$ taking into account of private and public benefits. Sensitivity analysis shows that increase of water demand can improve BCR values with little cost so that it is needed to extend application of rainwater use and select a proper range of design factor. Decrease of construction and maintenance cost reduced the tank volume to secure economic validity. Finally, increase rate of water service charge had considerable impact on economic feasibility.

A Study on Public Interest-based Technology Valuation Models in Water Resources Field (수자원 분야 공익형 기술가치평가 시스템에 대한 연구)

  • Ryu, Seung-Mi;Sung, Tae-Eung
    • Journal of Intelligence and Information Systems
    • /
    • v.24 no.3
    • /
    • pp.177-198
    • /
    • 2018
  • Recently, as economic property it has become necessary to acquire and utilize the framework for water resource measurement and performance management as the property of water resources changes to hold "public property". To date, the evaluation of water technology has been carried out by feasibility study analysis or technology assessment based on net present value (NPV) or benefit-to-cost (B/C) effect, however it is not yet systemized in terms of valuation models to objectively assess an economic value of technology-based business to receive diffusion and feedback of research outcomes. Therefore, K-water (known as a government-supported public company in Korea) company feels the necessity to establish a technology valuation framework suitable for technical characteristics of water resources fields in charge and verify an exemplified case applied to the technology. The K-water evaluation technology applied to this study, as a public interest goods, can be used as a tool to measure the value and achievement contributed to society and to manage them. Therefore, by calculating the value in which the subject technology contributed to the entire society as a public resource, we make use of it as a basis information for the advertising medium of performance on the influence effect of the benefits or the necessity of cost input, and then secure the legitimacy for large-scale R&D cost input in terms of the characteristics of public technology. Hence, K-water company, one of the public corporation in Korea which deals with public goods of 'water resources', will be able to establish a commercialization strategy for business operation and prepare for a basis for the performance calculation of input R&D cost. In this study, K-water has developed a web-based technology valuation model for public interest type water resources based on the technology evaluation system that is suitable for the characteristics of a technology in water resources fields. In particular, by utilizing the evaluation methodology of the Institute of Advanced Industrial Science and Technology (AIST) in Japan to match the expense items to the expense accounts based on the related benefit items, we proposed the so-called 'K-water's proprietary model' which involves the 'cost-benefit' approach and the FCF (Free Cash Flow), and ultimately led to build a pipeline on the K-water research performance management system and then verify the practical case of a technology related to "desalination". We analyze the embedded design logic and evaluation process of web-based valuation system that reflects characteristics of water resources technology, reference information and database(D/B)-associated logic for each model to calculate public interest-based and profit-based technology values in technology integrated management system. We review the hybrid evaluation module that reflects the quantitative index of the qualitative evaluation indices reflecting the unique characteristics of water resources and the visualized user-interface (UI) of the actual web-based evaluation, which both are appended for calculating the business value based on financial data to the existing web-based technology valuation systems in other fields. K-water's technology valuation model is evaluated by distinguishing between public-interest type and profitable-type water technology. First, evaluation modules in profit-type technology valuation model are designed based on 'profitability of technology'. For example, the technology inventory K-water holds has a number of profit-oriented technologies such as water treatment membranes. On the other hand, the public interest-type technology valuation is designed to evaluate the public-interest oriented technology such as the dam, which reflects the characteristics of public benefits and costs. In order to examine the appropriateness of the cost-benefit based public utility valuation model (i.e. K-water specific technology valuation model) presented in this study, we applied to practical cases from calculation of benefit-to-cost analysis on water resource technology with 20 years of lifetime. In future we will additionally conduct verifying the K-water public utility-based valuation model by each business model which reflects various business environmental characteristics.

Can Non-Fuel Costs be Considered as Variable Costs in Generation Market? (연료비 이외의 항목도 발전시장의 변동비로 간주할 수 있는가?)

  • Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.20 no.3
    • /
    • pp.567-593
    • /
    • 2011
  • In 2005, five Korean generation companies suggested to include non-fuel ancillary costs incurring in the process of managing fuels and ashes as variable costs in Korean Cost-Based Pool. OLS analysis seeking statistical relation with the amount of generation did not provide sufficient ground for such argument. However, some cost items in this category showed meaningful statistical relation for certain generation facilities hinting some possibilities for the candidate of variable costs in the future. Time lag related to cost evaluation, problems related to inventory control and accounting method related to this may block the statistical relationship with the amount of generation. Unified criteria and standardization of the data are necessary before we proceed further to consider them as variable costs.

  • PDF

The Organization of Interface Items for Rubber Tired AGT System of Light Rail Transit (경량전철 고무차륜 AGT 시스템의 인터페이스 체계 정립)

  • Lee, An-Ho;Kim, Jae-Min
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.98-103
    • /
    • 2003
  • Recently, to solve the urban transportation problem, the introduction of Light Rail Transit system has been proceeded positively. therefore, development of the Korean standard LRT system in which safety, efficiency and cost effectiveness are emphasized. The Korea Railroad Research institute study on Rubber Tired AGT system of Light Rail Transit to obtain the essential technology and engineering know-how, which leads lower LRT construction cost. In the development procedure, SE(system Engineering) is needed for combination of subsystem and optimum operation effect. This study is focused on the interface of LRT subsystem(Development of the rubber tired LRT, Power supply system, signalling and train control system, Elevated track structure for the rubber tired LRT), a important part of SE, to develop of the driverless LRT system and establish the test and evaluation.

  • PDF

The Analysis on the Types of Remodeling in Preference Group -Focused on the Internet Remodeling site- (리모델링 선호집단의 형태 분석 연구 -인터넷 리모델링 상담 사이트를 중심으로)

  • Park, Hyun-Ok;Lee, Jong-Suk
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.3 no.2
    • /
    • pp.1-7
    • /
    • 2003
  • Remodeling has improved through many interests of people and governmental positive support. Accordingly, this study precedes definition and typology of remodeling. As well, it analyzed the type of remodeling preference group who asked consulting on internet following items and researched a special feature of construction case. - Area, Age, Size and Type of Building, Prospective Cost, Constructing Period, Range of Remodeling- Then, remodeling will have a big effect and be needed lasting evaluation.

  • PDF

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Breakdown Structure and Weight Evaluation for Maintenance Items of Public Childcare Facilities (국·공립 보육시설의 운영유지 항목 분류체계 개발 및 중요도 산정)

  • Park, Hyeong-Jin;Park, In-Ji;Moon, Hyun-Seok;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.3-11
    • /
    • 2013
  • Recently according to increasement of the single family and dual-earner couples, the number of infants and young children stays on a long time to the childcare facilities. this is increasing the importance to improve the physical environment. However, the operating and maintenance costs of the national-public childcare facilities have taken effect of the unfair support issues of municipality's financial situation. Especially, because of the lack of the operating and maintenance costs of the facility and the shortage of facilities equipment maintenance repair costs, nursery operations and Maintenance items are needed to distribute appropriately. Therefore, this study is to estimate the importance to facility operations and maintenance items based on "Kindergarten and Childcare Facilities"presented at the Child Care Policy Study. we are expected to allocate appropriately of operation and maintenance cost of a limited budget. In particular, those can be considered for operation and maintenance cost about the National-Public Childcare Facilities and be determined to a safe and pleasant environment to kindergartens through the appropriate operations and maintenance support.