• Title/Summary/Keyword: cost estimator

Search Result 108, Processing Time 0.024 seconds

Design of current estimator for reducing of current ripple in BLDC motor (BLDC 전동기의 전류맥동 보상을 위한 전류추정기 설계)

  • Kim, Myung-Dong;Oh, Tae-Seok;Kim, Il-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.339-341
    • /
    • 2006
  • This paper presents a new method on controller design of brushless dc motors. In such drives the current ripples are generated by motor inductance in stator windings and the back EMF. To suppress the current ripples the current controller is generally used. To minimize the size and the cost of the drives it is desirable to control motors without the current controller and the current sensing circuits. To estimate the motor current it is modeled by a neural network that is configured as an output-error dynamic system. The identified model is essentially a one step ahead prediction structure in which fast inputs and outputs are used to calculate the current output. Using the model, effective estimator to compensate the effects of disturbance has been designed. The effectiveness of the proposed current estimator is verified through experiments.

  • PDF

Robust Tracker Design Method Based on Multi-Trajectories of Aircraft

  • Kim, Eung-Tai;Andrisani, D. II
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.3 no.1
    • /
    • pp.39-49
    • /
    • 2002
  • This paper presents a robust tracker design method that is specific to the trajectories of target aircraft. This method assumes that representative trajectories of the target aircraft are available. The exact trajectories known to the tracker enables the incorporation of the exact data in the tracker design instead of the measurement data. An estimator is designed to have acceptable performance in tracking a finite number of different target trajectories with a capability to trade off the mean and maximum errors between the exact trajectories and the estimated or predicted trajectories. Constant estimator gains that minimize the cost functions related to the estimation or prediction error are computed off-line from an iterative algorithm. This tracker design method is applied to the longitudinal motion tracking of target aircraft.

A Study on Passive Homing Trajectory for Maximizing Target Information (표적 정보량을 최대화하는 피동 호밍궤적에 관한 고찰)

  • Ra, Won-Sang;Shin, Hyo-Sang;Jung, Bo-Young;Whang, Ick-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.68 no.1
    • /
    • pp.172-181
    • /
    • 2019
  • This paper deals with the problem of generating the energy optimal trajectory which is intended to enhance the target tracking performance of a passive homing missile. Noticing that the essence of passive target tracking is the range estimation problem, the target information gathered by passive measurements can be readily analyzed by introducing the range estimator designed in line-of-sight(LOS) frame. Moreover, for the linear filter structure of the suggested range estimator, the cost function associated with the target information is clearly expressed as a function of the line-of-sight rate. Based on this idea, the optimal missile trajectory maximizing the target information is obtained by solving the saddle point problem for an indefinite quadratic cost which consists of the target information and the energy. It is shown that, different from the previous heuristic approaches, the guidance command producing the optimal passive homing trajectory is produced by the modified proportional navigation guidance law whose navigation constant is determined by the weighting coefficient for target information cost.

Spatiotemporal Visualization of Unit Price Data of Highway Projects

  • Jain, Deepanshi;Shrestha, K. Joseph;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.77-81
    • /
    • 2015
  • The unit price contracting is the standard contracting method for highway projects in the U.S. As a result, state highway agencies have collected a large amount of historical bid data that they can use to determine engineer's estimates for future projects. The estimator must carefully consider various characteristics of a new project such as its location to determine an engineer's estimate as accurate as possible before bid letting. Higher cost estimates can result in the loss of the available budget and lower cost estimates may lead to deferral and delay of projects. The study uses the historical bid data obtained from Iowa Department of Transportation and develops a Geographic Information System (GIS) tool to visually show the variation of unit prices over the map using a spatial interpolation technique. The interpolation map can be used to estimate the unit price of the item at any location across Iowa. This noble method allows the estimator to effectively and fully utilize the historical bid data in a very time efficient manner and determine more accurate cost estimation.

  • PDF

A Hybrid Simulation Technique for Cell Loss Probability Estimation of ATM Switch (ATM스위치의 쎌 손실율 추정을 위한 Hybrid 시뮬레이션 기법)

  • 김지수;최우용;전치혁
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.3
    • /
    • pp.47-61
    • /
    • 1996
  • An ATM switch must deal with various kinds of input sources having different traffic characteristics and it must guarantee very small value of cel loss probability, about 10$^{8}$ -10$^{12}$ , to deal with loss-sensitive traffics. In order to estimate such a rate event probability with simulation procedure, a variance reduction technique is essential for obtaining an appropriate level of precision with reduced cost. In this paper, we propose a hybrid simulation technique to achieve reduction of variance of cell loss probability estimator, where hybrid means the combination of analytical method and simulation procedure. A discrete time queueing model with multiple input sources and a finite shared buffer is considered, where the arrival process at an input source and a finite shared buffer is considered, where the arrival process at an input source is governed by an Interrupted Bernoulli Process and the service rate is constant. We deal with heterogeneous input sources as well as homogeneous case. The performance of the proposed hybrid simulation estimator is compared with those of the raw simulation estimator and the importance sampling estimator in terms of variance reduction ratios.

  • PDF

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.2
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.

Compensation of Periodic Magnetic Saturation Effects for the High-Speed Sensorless Control of PMSM Driven by Inverter Output Power Control-based PFC Strategy

  • Lee, Kwang-Woon
    • Journal of Power Electronics
    • /
    • v.15 no.5
    • /
    • pp.1264-1273
    • /
    • 2015
  • An inverter output power control based power factor correction (PFC) strategy is being extensively used for permanent magnet synchronous motor (PMSM) drives in appliances because such a strategy can considerably reduce the cost and size of the inverter. In this strategy, PFC circuits are removed and large electrolytic DC-link capacitors are replaced with small film capacitors. In this application, the PMSM d-q axes currents are controlled to produce ripples, the frequency of which is twice that of the AC main voltage, to obtain a high power factor at the AC mains. This process indicates that the PMSM operates under periodic magnetic saturation conditions. This paper proposes a back electromotive-force (back-EMF) estimator for the high-speed sensorless control of PMSM operating under periodic magnetic saturation conditions. The transfer function of the back-EMF estimator is analyzed to examine the effect of the periodic magnetic saturation on the accuracy of the estimated rotor position. A simple compensation method for the estimated position errors caused by the periodic magnetic saturation is also proposed in this paper. The effectiveness of the proposed method is experimentally verified with the use of a PMSM drive for a vacuum cleaner centrifugal fan, wherein the maximum operating speed reaches 30,000 rpm.

A Study on Localization Technique Using Extended Kalman Filter for Model-Scale Autonomous Marine Mobility (모형 스케일 자율운항 해양 이동체의 확장칼만필터 기반 측위 기법에 관한 연구)

  • Youngjun You
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.61 no.2
    • /
    • pp.98-105
    • /
    • 2024
  • Due to the low accuracy of measured data obtained from low-cost GNSS and IMU devices, it was hard to secure the required accuracy of the measured position and heading angle for autonomous navigation which was conducted by a model-scale marine mobility. In this paper, a localization technique using the Extended Kalman Filter (EKF) is proposed for coping with the issue. First of all, a position and heading angle estimator is developed using EKF with the assumption of a point mass model. Second, the measured data from GNSS and IMU, including position, heading angle, and velocity are used for the estimator. In addition, the heading angle is additionally obtained by comparing the LiDAR point cloud with map information for a temporal water tank. The newly acquired heading angle is integrated into the estimator as an additional measurement to correct the inaccuracy in the heading angle measured from the IMU. The effectiveness of the proposed approach is investigated using data acquired from preliminary tests of the model-scale autonomous marine mobility.

Optimal Design of Accelerated Degradation Tests under the Constraint of Total Experimental Cost in the Case that the Degradation Characteristic Follows a Wiener Process (열화가 Wiener process를 따르는 경우의 비용을 고려한 가속열화시험 계획)

  • Lim, Heon-Sang
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.2
    • /
    • pp.117-125
    • /
    • 2012
  • For the highly reliable products, an accelerated degradation test (ADT) is a useful tool which has been employed in industry to obtain reliability-related information within an affordable amount of time and cost. In an ADT, as all other reliability tests, it is important to carefully design the ADT beforehand to obtain estimates of the quantities of interest as precisely as possible. In this paper, optimal ADTs are developed assuming that the constant-stress loading method is employed and the degradation characteristic follows a Wiener process. Under the constraint that the total cost does not exceed a pre-specified budget, the stress levels, the number of test units allocated to each stress level and the number of measurement (termination time) are determined such that the asymptotic variance of the maximum likelihood estimator of the q-th quantile of the lifetime distribution at the use condition is minimized.

A Simple Interactive 3D Interior Design Application for Living Room - Cost Management

  • Winnie, Chin;Hui, Saw Seow;Gee, Yap Seok
    • Journal of Multimedia Information System
    • /
    • v.4 no.3
    • /
    • pp.157-162
    • /
    • 2017
  • The title of this project is "A Simple Interactive 3D Interior Design Application for Living Room - Cost Management", focusing on developing an application that enables costing and designing to be executed concurrently in interior design phases. This is because any changes made at costing phase after design phase is completed, it will potentially lead to unnecessary increase in cost and time. Therefore, the objective of this project is aimed to devise a cost management module to be included in the proposed application, allowing interior designer to make cost-based decision at the designing phase itself. This can be achieved through its proposed functions which include total cost update, budget management, cost estimator calculator and material list generation. The methodology being proposed in this project is Prototyping Development, categorized under Rapid Application Development (RAD), by starting off with planning, analysis, design and implementation phases are performed concurrently and repeatedly in a cycle to produce a prototype until the application is completed. In the end of this project, the developed prototype is expected to contribute a better solution towards cost management in interior design.