Korean Journal of Construction Engineering and Management
/
v.10
no.3
/
pp.139-147
/
2009
Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.
KIPS Transactions on Software and Data Engineering
/
v.2
no.11
/
pp.757-764
/
2013
The estimation of maintenance cost of information system so far has been conducted centered on the ordering body, so the problem of provider's having to cover the cost due to small cost compared to the amount of work is not solved. This study is a base study for estimating the maintenance cost of information system centered on provider, and it deduces cost items of maintenance and suggests adjustment factors for adjusting the gap between the ordering body and provider regarding the maintenance cost. In order to deduce the cost items of maintenance, this study adds the activities of the provider for maintenance to the base study of cost factors regarding the existing maintenance activity, divides, and classifies them into the fixed cost and variable cost. In order to adjust the gap between the ordering body and provider regarding the maintenance cost, this study found the adjustment factors such as the code, utility, and components created by the automatic tool that was not included when estimating the maintenance cost centered on the ordering body. After examining and analyzing K Company's data of maintenance performance for three years, it confirmed that the gap regarding the adjustment factors was about 13% in case of K Company.
Byeoung Heon Yoo;Jin-Won Noh;Sei-Jong Baek;Eun Woo Nam
Korea Journal of Hospital Management
/
v.28
no.1
/
pp.1-13
/
2023
Purpose: This study purposed to analyze the economic feasibility of introducing a third party logistics system as a strategic alternative to hospital management. Methods: Economic analysis was performed by measuring changes in costs and benefits before and after implement the third party logistics system and estimating the size of net benefits for the next five years for the target hospital. A questionnaire survey and in-depth interview with stake-holders were conducted to find out the satisfaction and effectiveness of the system. Findings: According to results, the cost-benefit ratio for the implementation of the system was 1.18. For the next five years, the cost-benefit ratio was 1.48, the net present value was about 1.7 billion won, and the internal rate of return was 64%. The satisfaction of internal stake-holders was relatively high, in terms of improving the concentration of unique tasks and increasing the efficiency of inventory management. Practical Implications: It was found that the increase in benefits had a greater effect on the change in the cost-benefit ratio than the increase in costs resulting from the expansion of logistics, and the increase in the present value of net benefits gradually decreased as the cost increased. In addition, overall job satisfaction and satisfaction with outsourcing companies were relatively low, which means that stabilization of the new system is important. Further study is needed for more accurate economic analysis.
Kim, Jeong-su;Lee, Eun-seok;Kim, Jong-hee;Park, Jong-kook;Kim, Jong-bae
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2014.05a
/
pp.215-217
/
2014
A system architecture design relying only on the experience of its designer varies in quality in line with the designer's personal experience and knowledge ability. Likewise, a wrong estimation of hardware capacity ends up in waste of resources. In practice, a range of post-hoc monitoring tools are in operation, without providing any method for estimating and reflecting the performance at an early stage of architecture design. Provided capacity requirement is estimated in advance with simulation at the stage of design, the system capacity ends up in waste of resources. In practice, a range of post-hoc monitoring tools are in operation, without providing any method for estimating and reflecting the performance at an early stage of architecture design. Provided capacity requirement is estimated in advance with simulation at the stage of design, the system performance requirement can be met with a minimal cost while the waste of resources can be reduced to a great extent. In this context, the present study develops a pilot simulation model for hardware architecture design and then verifies its validity in an experiment. If the error rate falls within a permissible range in the experiment, the simulation model may be considered to reflect well the characteristics of real-life information system architecture.
In this paper, make a study decision problem called an optimal release policies after testing a software system in development phase and transfer it to the user. When correcting or modifying the software, finite failure non-homogeneous Poisson process model, presented and propose release policies of the life distribution, half-logistic property model which used to an area of reliability because of various shape and scale parameter. In this paper, discuss optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement. In a numerical example, the parameters estimation using maximum likelihood estimation of failure time data, make out estimating software optimal release time. Software release time is used as prior information, potential security damages should be reduced.
Journal of the Korea Society of Computer and Information
/
v.14
no.8
/
pp.1-9
/
2009
In this paper, make a study decision problem called an optimal release policies after testing a software system in development phase and transfer it to the user. When correcting or modifying the software, because of the possibility of introducing new faults when correcting or modifying the software, infinite failure non-homogeneous Poisson process models presented and propose an optimal release policies of the life distribution applied fixed shape parameter distribution which can capture the increasing/decreasing nature of the failure occurrence rate per fault. In this paper, discuss optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, make out estimating software optimal release time
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.12
no.6
/
pp.155-164
/
2012
The compression of software development schedule has a limit without regarding to a development manpower. However, the actually developed softwares includes the impossible short time or unreal long time date. Previously suggested models are driving the development schedule from all of the actually developed software without considering these constraints. This paper recommends a standard of minimum and the most suitable development time period. This paper has chosen a criterion that shows the best development schedule among 5 criteria based on the actually performed projects. Moreover, this paper suggests a model that estimates the development schedule based on the best criterion.
Our research proposes how to, systematically, count function point from initial functional requirements based on natural language. Gradually, Function Point Analysis is used to overcome the limitation of LOC(Line Of Code) for estimating software size. Moreover, it plays an important role in cost management. Function point is derived from initial requirements and is determined by experts who have an education for function point. However, currently there are few researches to cout function point by systematic or automatic rules. Through extending our porposed method, we expect that function point is able to be counted automatically or semi-automatically. This would be our future research
본 논문에서는 공간 색인 구조의 예측할 수 있는 비용 모델을 제안한다. 연구의 주된 내용은 정제 단계의 분석이다. 즉, 이 분야에서 기존의 연구들과는 달리 여과 단계 뿐만 아니라 정제 단계의 성능을 예측할 수 있는 해석적인 모델을 제안한다. 제안된 비용 모델은 이단계 색인 구조에 대하여 중점적으로 연구하였는데, 이 비용 모델은 기존의 다른 공간 색인 구조에도 적용될 수 있다. 본 논문에서 제안된 비용 모델은 실험 분석을 통해 정확하다는 것을 보인다. 상대적인 오차는 이론적인 예측치를 실제적인 실험 결과와 비교할 때 15% 이내이다. 이 비용 모델은 복잡한 공간 질의의 비용을 평가하는 공간 질의 최적화기에서 유용한 도구로써 사용될 수 있다.
This study presents a method for level ice-structure interaction analysis to estimate the fatigue damage of arctic structures by applying plate theory to the behavior of level ice. The boundary element method (BEM), which incurs a lower computational cost than the finite element method (FEM), was introduced to solve the plate bending problem. The BEM formulation was performed by applying the BEM to plate theory. Finally, to check the validity of the proposed method, the BEM results and FEM results obtained using the ABAQUS commercial software were compared. The response results of the BEM analysis agreed well with those of the FEM analysis. Based on the results of the analysis, the BEM approach is considered to be very powerful in level ice-structure interaction analysis for estimating level ice-induced fatigue damage. Further work is being conducted to perform level ice fracture analysis based on the stress field calculated using the boundary element method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.