• 제목/요약/키워드: cost calculation standard

검색결과 144건 처리시간 0.023초

풍력터빈 기어박스의 베어링 수명 계산에 관한 연구 (Study on Bearing Life Calculation for Wind Turbine Gearbox)

  • 양용군;최창;장기;허철수;류성기
    • 한국기계가공학회지
    • /
    • 제13권5호
    • /
    • pp.21-27
    • /
    • 2014
  • Currently, wind power has become a major research field in the area of sustainable development. As one important component of a wind turbine transmission system, most instances of downtime due to a gearbox failure are caused by bearing failures. Gearboxes for wind turbines must have the highest levels of reliability over a period of approximately 20 years, withstanding high dynamic loads. At the same time, a lightweight design and cost minimization efforts are required. These demands can only be met with a well-thought-out design, high-quality materials, a high production quality and proper maintenance. In order to design a reliable and lightweight gearbox, it is necessary to analyze methods pertaining to the bearing rating lifetimes of the standard and of different companies, also including calculation methods for modification factors. This can determine the influence of the bearing lifetime.

ONAN 모드 4250kVA 변압기의 구조 건전성과 냉각 성능의 평가 (Evaluation of Structural Integrity and Cooling Performance of 4250 kVA Power Transformer with ONAN Mode)

  • ;김성익;조종래
    • 한국기계가공학회지
    • /
    • 제20권7호
    • /
    • pp.48-57
    • /
    • 2021
  • The main research content of this paper is to evaluate the structural integrity and the cooling performance of 4250 kVA power transformer with ONAN(Oil Natural and Air Natural) mode. The dynamic analysis is used to verify the structural safety of the transformer by seismic loading. The transformer structure is simplified and NX software is used to build a three-dimensional model, and ANSYS commercial software is used to calculate the stress and deformation by applying corresponding load. The analysis result was evaluated whether it satisfies the design requirements according to the IEEE Std 693 standard. In terms of thermal analysis to evaluate the cooling performance, the thermal physical model is used to calculate the heat exchange between the radiator and the tank in the steady state, and the result is input into the Fluent software to calculate the internal temperature field of the transformer tank, which reduces the calculation cost of thermal fluid. Comparing the simulated hot spot temperature and top oil temperature of the transformer with the calculation results of the IEC60076 classic model, it is found that the error is only 1.9%.

공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구 (Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension)

  • 정기창;이재섭;박양호
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.33-44
    • /
    • 2012
  • 본 연구는 공공공사 공기연장 시 발생하는 추가간접비의 지급개선방안에 관한 연구이다. 현장사례를 통해 공기연장 추가 간접비 미지급 원인을 분석한 결과 실비의 인정범위에 대한 다툼 및 증빙의 어려움이 있는 것으로 조사되었으며, 전문가 의견조사 실시결과 통계적 기준이 명확하다면 공기연장 추가간접비의 인정범위를 합의하는 '공기연장 사전합의 제도'를 실시할 수 있을 것으로 조사되었다. 따라서 본 연구는 다수의 현장 실비자료를 집계하여 공사프로젝트의 공종별, 공사금액별, 공사기간별 측면에서 산정하였다. 산정한 결과 공종 및 공사기간별 요인은 공사기간연장 추가간접비 발생금액에 직접적 영향을 미치는 것으로 볼 수 없으나 도급계약금액요인에 따라서는 직접적 연관성이 있는 것으로 나타났다. 이에 계약금액별 공사기간연장에 따른 추가비용인 '공기연장 표준추가간접비'를 제시하였으며, 공기연장비용 사전합의 제도를 시행하기 위한 제도적 개선방안을 제시하였다.

정보통신설비공사 감리대가 품셈개정에 관한 연구 (A Study on the Revision of Man-day Cost Calculation Method for Information and Communication Facilities Construction Supervision)

  • 이진호;강병권
    • 융합정보논문지
    • /
    • 제10권2호
    • /
    • pp.1-8
    • /
    • 2020
  • 국내 정보통신 설비공사에 대한 감리대가 표준품셈은 2009년 5월 (사)한국엔지니어링협회에서 정한 표준품셈을 최근까지 관련 공공기관 및 민간 산업계에서 사용해 왔다. 그러나 정보통신기술과 사회경제적 환경이 매우 빠르게 변화되고 발전되어 기존의 품셈은 최근의 현장 여건에 부합되지 않아 현장 적용률이 저조하고, 공종별 감리원수 산출을 위한 산출식이 복잡하여 적용에 많은 어려움을 갖고 있다. 이러한 여건과 최근의 정보통신 기술의 융복합화에 따른 새로운 공종을 표준품셈에 반영하여 기존 품셈의 보완 및 개정 필요성이 대두되었고, 산업통상자원부에서는 최근 새로운 표준감리 품셈을 개정 고시하였다. 본 논문에서는 저자들이 개정과정에 주도적으로 참여한 경험을 바탕으로 개정 고시된 표준품셈의 개정 배경과 새롭게 제시된 표준 품셈 계산식을 기존 품셈 계산식과 비교하여 설명을 제시하고자 한다. 연구방법으로서 기존의 품셈이 적용된 실사례 조사 결과와 타 분야 품셈을 비교 후 정보통신설비공사 분야의 품셈을 개선하기 위하여 WBS 방식에 기반한 새로운 품셈 산출 수식을 설명한다.

건설 신기술의 원가산정기준 개선방안에 대한 연구 (A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction)

  • 이주현;태용호;백승호;김경민
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.65-76
    • /
    • 2022
  • 국내 건설기술의 발전을 도모하고 국가경쟁력을 제고하기 위한 목적으로 1989년 도입된 건설 신기술 지정제도는 심사과정에서 신기술의 원가계산서를 검토하고, 설계·시공 공사비, 유지관리비 등 비용절감효과와 공사기간 단축 효과를 경제성 항목으로 평가하고 있다. 그러나 이 과정에서 고유기술에 대하여 공사비산정기준관리기관과 신기술 개발자간의 의견차이가 빈번히 발생하고 있으며, 또한 현행 신기술에 대한 원가산정기준이 단위수량당 소요량만을 제시하는 방식으로 생산성에 대한 정보가 부재하여 기존 유사 기술과의 공사기간에 대한 객관적인 비교가 어려운 실정이다. 본 연구에서는 건설 신기술 심사 시 원가산정기준 검토절차와 심사기준, 신기술 품셈 작성방법 등 현황을 분석하고 해외 원가산정기준과 비교하여 현행 건설 신기술의 원가산정기준 개선방안을 제시하였다. 제시한 개선방안은 작업조 기반의 생산성 정보를 제공하고, 적용단가를 제시하여 원가기준의 투명성을 확보할 수 있도록 구성하였으며, 신기술의 특성을 고려하여 재료비와 기계경비에 대한 원가정보 역시 제공할 수 있도록 하였다. 본 연구의 개선된 원가산정 기준을 통해 발주자에게 신기술에 대한 원가정보를 현행보다 세부적으로 제공하고, 공사비 산정 과정을 보다 간소화함으로써 건설 신기술의 활용과 현장적용성을 향상시킬 수 있으리라 기대된다.

컴퓨터에 의한 열교환기 최적설계 (Computer-Aided Optimal Design of Heat Exchangers)

  • 송태호;오진국;윤창현;허경재
    • 대한설비공학회지:설비저널
    • /
    • 제10권4호
    • /
    • pp.297-303
    • /
    • 1981
  • Optimal design of shell and tube heat exchanger system with the working fluids which may condense outside the tubes has been carried out under specified inlet and outlet conditions. Independent variables such as number of parallel series, tube diameter, distribution pitch, tube side pressure loss, baffle cut and shell side pressure loss as well as dependent variables such as shell diameter, number of tubes, number of serial series and number of baffles were all characterized according to the standard. Exhaustive search method was used to construct a computer program together with the calculation of heat transfer rate by LMTD method. stress analysis of maj or parts was made to examine their dimensions satisfying heat transfer and pressure loss requirements. Cost estimation based on the installation, operation and maintenance was also made, A few representative variables, heat transfer area, shell diameter and pressure loss, were used to express cost function, finally giving the optimal selection of all tentative solutions.

  • PDF

LARGE EDDY SIMULATION OF TURBULENT CHANNEL FLOW USING ALGEBRAIC WALL MODEL

  • MALLIK, MUHAMMAD SAIFUL ISLAM;UDDIN, MD. ASHRAF
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • 제20권1호
    • /
    • pp.37-50
    • /
    • 2016
  • A large eddy simulation (LES) of a turbulent channel flow is performed by using the third order low-storage Runge-Kutta method in time and second order finite difference formulation in space with staggered grid at a Reynolds number, $Re_{\tau}=590$ based on the channel half width, ${\delta}$ and wall shear velocity, $u_{\tau}$. To reduce the calculation cost of LES, algebraic wall model (AWM) is applied to approximate the near-wall region. The computation is performed in a domain of $2{\pi}{\delta}{\times}2{\delta}{\times}{\pi}{\delta}$ with $32{\times}20{\times}32$ grid points. Standard Smagorinsky model is used for subgrid-scale (SGS) modeling. Essential turbulence statistics of the flow field are computed and compared with Direct Numerical Simulation (DNS) data and LES data using no wall model. Agreements as well as discrepancies are discussed. The flow structures in the computed flow field have also been discussed and compared with LES data using no wall model.

예산제약 하에서 운용가용도를 고려한 최적 동시조달수리부속품 소요 산출 모델 (The Computing Model of Demand Quantity for Optimal Current Spare Parts considering the Operational Availability under Budget)

  • 나인성;이계경;박명규
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.167-180
    • /
    • 2006
  • This study expands limitation of OASIS(Optimal Allocation of Spares for Initial Supports) program, which calculates CSP(Concurrent Spare Part), not only availability but also cost, and developed the program enabling run in WINDOW OS. By considering multi-step repair and logistics support system, repairing capability at the time of deployment, and procurement period, this model is the first local model reflecting circumstances of the armed forces of the Republic of Korea. Furthermore, the programmed model was selected as the military standard software and has being essentially used for CSP calculation.

A Conversion Process to IFC Files for Integrated Use of Open and Web-based BIM Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Hwang, Hee-Suk
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권10호
    • /
    • pp.11-23
    • /
    • 2019
  • 본 연구에서는 토목분야의 다양한 상용 BIM 모델링 설계 소프트웨어의 사용자들에게 상호 호환성과 상호 운용성을 보장하기 위해 BIM 국제 표준 파일 포맷인 IFC 파일로의 파일 변환 프로세스를 새롭게 설계하여 제시한다. 제안된 프로세스는 상용 BIM 모델링 소프트웨어를 위한 add-in 방식의 컨버터(Converter)를 사용하여, 변환되는 IFC 파일의 3차원 객체 형상 정보에 수량 산출식 코드 속성과 토목 분야 CBS/OBS/WBS 표준분류체계 속성으로 구성되는 추가적인 속성들을 삽입한다. 또한, 개방형(Open) 웹 기반 수량, 공정(4D) 및 공사비(5D) 관리를 위한 IFC 파일의 통합 활용 프로세스를 추가로 설계하고 구축한다. 이러한 작업을 통해 토목 분야의 BIM 모델링 설계 단계에서 최종적인 시공 단계에 이르는 개방형 웹 기반 수량, 공정(4D) 및 공사비(5D)의 연계적 활용에 대한 새로운 프로세스를 제시하는 것이 본 연구의 궁극적인 목적이다.

건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로 (Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate)

  • 박희성;한예령;허영기;안방률
    • 대한토목학회논문집
    • /
    • 제28권1D호
    • /
    • pp.67-72
    • /
    • 2008
  • 건설기계는 건설사업의 성공적인 수행을 위한 중요한 요인이다. 그리고 건설기계에 소요되는 비용이 건설공사비에서 차지하는 비중이 크다. 따라서 건설기계 비용의 산정은 건설계획 단계에서 중요한 업무이다. 이를 위해서 우리나라는 표준 품셈에 제시된 건설기계 시공능력 산정식을 이용하여 건설기계의 시간당 작업량을 계산하는 방식을 활용하고 있다. 그러나 건설기계의 성능은 개선되고 있으나 시공능력 산정식에서 활용되고 있는 작업효율은 이를 반영하지 못하는 실정이다. 이에 본 연구는 유압식 백호, 로우더, 덤프트럭을 대상으로 현장실사를 통해 작업효율을 실측하였다. 그 결과 백호와 로우더는 현재 활용중인 작업효율보다 현장실사 값이 높게 나타났으며, 덤프트럭은 낮게 나타났다. 본 연구결과를 바탕으로 건설기계의 작업효율 표준 산정식에 대한 정의가 수립되어야 하며, 체계적이고 장기적인 조사를 거쳐 작업효율의 개정이 필요할 것으로 사료된다.