• Title/Summary/Keyword: cost calculation

Search Result 1,042, Processing Time 0.03 seconds

Least Cost Generation Expansion Planning Methodology and Generation Cost (전원개발계획(電源開發計劃)에서의 비용최소화(費用最小化)와 발전원가(發電原價))

  • Chung, Do-Young;Park, Kyung-Suh;Park, Jong-Bai
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.106-109
    • /
    • 1992
  • This paper Introduces the concept of the generation cost of generating utilities and its calculation methods. Also, the economic evaluation method using generation cost which is called as a screening curve method will be presented along with the benefits and disadvantages of this concept. Next, the least-cost electric utility planning techniques which is used very widely in many countries will be Introduced In comparison with screening curve method. In this aspects, the optimal dynamic mix can be determined as a result. By comparing these two concepts, we will get the concrete concept why the economic evaluation method using generation cost can not be used for the future generation expansion planning.

  • PDF

Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive (입환기관차의 LCC 평가분석)

  • Bae Dae-Sung;Chung Jong-Duk
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.3
    • /
    • pp.260-266
    • /
    • 2005
  • The deterioration of a shunting locomotive was characterized for the lifetime assessment. The locomotive has been used for shunting works in steel making processes, and in this investigation, various types of technical evaluation methods for the locomotive parts were employed to assess the current deterioration status and to provide important clue for lifetime prediction. Unlike other rolling stocks in railway applications, the diesel shunting locomotive is composed of major components such as diesel engine, transmission, gear box, brake system, electronic devices, etc., which cover more than 70 percent of the total price of the locomotive. Therefore, in this paper, each part of major components in the diesel locomotive was analyzed in terms of the degree of deterioration. The lift-cycle-cost (LCC) analysis was performed based on the maintenance and repair history as compared with economical cost to provide the cost-effective prediction, i.e., to assess either repair for reuse or putting the locomotive out of service based on cost-effective calculation.

Customer Nodal Cost Calculation using Voltage Sag Coordination Charts (전압 강하 협조 그래프(VSCC)를 이용한 수용가 모선 가격 계산)

  • Jeong, Sung-Won;Lee, Hyun-Chul;Lee, Geun-Joon;Gim, Jae-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.298-299
    • /
    • 2008
  • In this paper, supposed that can measure power quality of bus and can calculate this cost in case electric charges about customer are imposed by each bus. When reflected this in system planning, expected cost proposed following method through sample system. We calculated the nodal cost by OPF(optimal power flow) in system and the drop numbers that happen during year of loads utilizing VSCC. Also calculated BPQC using the disruption numbers. As a result, calculated bus total cost including power quality cost through case study.

  • PDF

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

New Method to Calculate Cost of Capital for Telecommunication Market (통신시장의 투자보수율 산정 개선방안)

  • Kim, Chang-Soo;Chon, Mi-Lim
    • Journal of Digital Convergence
    • /
    • v.10 no.4
    • /
    • pp.181-190
    • /
    • 2012
  • Cost of capital is one of the key factors of accounting regulation policy for telecommunication market. This paper aims at investigating efficient policy improvements concerning accounting regulation for telecommunication market focused on cost of capital calculation methods and its application. At First, cost of capital estimating method should be improved. In estimating the cost of equity capital, it is necessary to use benchmark method for Equity risk premium. It will reduce analytical errors caused by a rapid economic change and inflation. It is also more desirable to use debt premium adding method for the cost of debt capital. Optimal capital structure method may be considered a better way to estimates capital structure. Secondly, cost of capital estimating process also has to be reformed. Telecommunication industry changes rapidly so it does not reflect fast environmental changes. Therefore, cost of capital should be calculated every year. Cost of capital should be calculated by individual companies. There is information asymmetry between regulators and regulatees. Because of that cost of capital calculating process takes long time and cost a lot. To solve this problem, regulator should legislate on cost of capital calculation and then regulating companies report the calculating result. Lastly, major telecommunication companies are all listed now and it is possible to calculating it separately. We must continuously improve the estimating method and application of cost of capital and due to the fast growing of telecommunication industry. The process of determining the calculating method must be discussed and best method chosen.

Tower Flange Design Considering Vortex Shedding (Vortex Shedding을 고려한 Tower Flange 설계)

  • Lee Hyunjoo;Choi Wonho;Lee Seung-Kuh
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.68-71
    • /
    • 2005
  • In the case of wind turbine design, Optimization of tower structure is very important because tower generally takes about $20\%$ of overall turbine cost. In this paper, we calculated wind loads considering vortex shedding, and optimized tower flange using the calculation results. For optimization, we used FEM to analyze structural strength of the flange and blade momentum theory to calculate wind loads.

  • PDF

Optimum Efficiency Calculation of Capacitor Run Type Single Phase Induction Motor considering Utilization Rate (이용률을 고려한 콘덴서 구동형 단상 유도전동기의 최적효율 계산)

  • Kim, Yang-Ho;Kim, Young-Sun;Choi, Sung-Jai
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1053-1054
    • /
    • 2007
  • This paper represents technique of optimum efficiency calculation for condenser run type single phase induction motor considering utilization rate. The material cost and loss expense are major factor of proposed algorithm. The simulation results are compared with experimental ones. And they are agreement with each other.

  • PDF

A Study for Automated Division of Composite Walls for Quantity Take-off in Construction Document Phase (실시설계단계에서 수량산출을 위한 복합벽체 자동분할에 관한 연구)

  • Park, Seunghwa;Kim, Heungsoo;Yoon, Dooyung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.2
    • /
    • pp.124-132
    • /
    • 2015
  • When Building Information Modeling (BIM) was introduced at the early stage, it was only utilized as a three-dimensional visualization tool. Nowadays, however, BIM is being studied for increasing design productivity and managing enormous information on building life cycle. One of the representative research is developing 'common prototype BIM libraries'. BIM data made of common prototype libraries should be utilized in various ways, quantity takeoff, code checking, energy analysis and so on. However, common prototype BIM libraries are not enough to estimate accurate cost. For example, composite wall libraries should be divided into several single objects, wall structure and finishes, for the quantity takeoff and construction cost calculation. In this paper, we are suggesting an automated division algorithm of composite wall and developing a system prototype for it. This study is expected to reduce extra modeling work and contribute to fast and accurate cost calculation in the construction.

A Study on the Improvement of Subsidy Program for CHP Plant Connected with Capital Region District Heating System (수도권 지역난방연계 열병합발전소의 기반기금 지원과 개선방안)

  • 김창수;이창호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.2
    • /
    • pp.97-103
    • /
    • 2004
  • CHP system supplies electricity and heating together with high efficiency. Current utility's CHP system uses electric power by itself and sells thermal energy to KDHC(Korea District Heating Corporation). CHP's operation cost except sales revenue of heating was covered by the sale revenue of electricity. Thus Electric generation cost in district Heating CHP system has close relationship with the level of heating price. However, after the restructuring of electricity industry, the operation cost could not be covered by sales revenue of heating and electricity. This loss was compensated by energy subsidy program in the electric power industry infrastructure fund. This paper suggests reasonable evaluation and improvement methods of the loss calculation of CHP system utilizing the infrastructure fund efficiency In terms of the direction of support by the fund, it provides the methods to prevent inefficient operation through setting up the upper limit of subsidy and to improve the loss calculation. Moreover, it suggest fixed rate support by heating supply level and reducing subsidy gradually for an efficient operation of CHP system.

A design of High-Profile IP for H.264 (H.264 High-Profile Intra Prediction 설계)

  • Lee, Hye-Yoon;Lee, Young-Ju;Kim, Ho-Eui;Suh, Ki-Bum
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2008.10a
    • /
    • pp.112-115
    • /
    • 2008
  • In this paper, we propose H.264 High Profile Encoder Intra Prediction module. This designed module can be operated in 306 cycle for one-macroblock. To verify the Encoder architecture, we developed the reference C from JM 13.2 and verified the our developed hardware using test vector generated by reference C. We adopt plan removal and SAD calculation to reduce the Hardware cost and cycle. The designed circuit can be operated in 133MHz clock system, and has 250K gate counts using TSMC 0.18um process including SRAM memory.

  • PDF