• Title/Summary/Keyword: cost breakdown structure

Search Result 91, Processing Time 0.028 seconds

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

The Life Cycle Cost Estimation using the Maintenance Information of a Propulsion Control System in the High Speed Train(KTX-1) (고속철도차량(KTX-1) 추진제어장치의 유지보수정보를 이용한 수명주기비용 예측)

  • Kim, Jae-Moon;Yun, Cha-Jung;Kim, Yang-Su;Jang, Jin-Yeong;Lee, Jong-Seong
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2176-2181
    • /
    • 2011
  • This paper estimates the life cycle cost(LCC) of a propulsion control system using the maintenance information in the high speed train(KTX-1). Life cycle costing is one of the most effective approaches for the cost analysis of long-life systems such as the KTX-1. Until now, most life cycle cost of the system has been studied as a whole system viewpoint. But in case of railway industry, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. This paper proposes the life cycle cost model which fitted to estimate life cycle cost (LCC) using maintenance information manual. As a result, LCC on propulsion control system increased moderately expect for periodical time when major parts are replaced at the same time. Results will be reflected in the development of domestic products.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities (건축공사 내역서 세부항목 구성에 대한 사례연구)

  • Noh, Hae-Ra;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

Study on the Application of 3D-based BIM for School Facilities to Increase Cost Management Efficiency (교육시설물 공사비 관리 효율화를 위한 BIM 적용방안에 관한 연구)

  • Kwon, O-Bin;Son, Jae-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.49-60
    • /
    • 2010
  • Cost Estimating allows each entity in a construction project to plan, distribute, and control its required construction cost for the project. However, existing 2D design based estimating has problems, such as inaccuracy and inefficiency caused by missing, duplicated, or erroneous calculations. In this situation, current estimations for school facilities have more difficulties in forecasting construction costs due to an inadequate work breakdown structure for BOQ (Bill of Quantity) and insufficient guidelines for Basis of Estimate. In this study, therefore, an effort was made to increase the efficiency of estimating for school facilities by applying a 3D modeling based BIM tool to quantity and cost estimates. In addition, this study suggested a reasonable work breakdown structure for BOQ that was appropriate when 3D modeling was applied, and verified it through a case study. The authors tried to provide a BIM-based estimating method for school facilities to obtain greater accuracy and efficiency by having more information in an earlier stage.

INTEGRATION MODEL OF COST AND SCHEDULE IN STEEL BOX GIRDER BRIDGE PRODUCTION PROCESS

  • Seok Kim;Kyoungmin Kim;Seung-Ho Ha ;Kyong Ju Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1262-1267
    • /
    • 2005
  • It is still difficult to share and utilize the information generated at each phase of a steel box girder production process due to the spatial gap and different level of management information. The physical distance results in the inefficiency of the information transmission, the accidental omission and typos of the relative information, and so on. Various levels of management information make it difficult to embody a new management system. Eventually, these factors incur the loss of cost and schedule and interrupt development of a new management system. This paper analyzes a current process and presents graphical process flow by using IDEF0. Based this analysis, the research for new production process and work breakdown structure (WBS) is conducted. At the end of this paper, the conceptual design of this system is suggested. Through new management system, it is expected that the model proposed in this study will improve the management process in the steel box production, and the improved process will reduce the redundant cost and schedule information, transmission and deposit generated by manual paper.

  • PDF