• Title/Summary/Keyword: coped stringer

Search Result 5, Processing Time 0.021 seconds

Study on Fatigue Behavior and Rehabilitation of Stringer with Coped Section(I) -Experimental Study on Static and Fatigue Behavior- (절취부를 갖는 세로보의 피로거동과 보수·보강에 관한 연구(I) -정적거동 및 피로거동의 실험적 고찰-)

  • Hwang, Yoon Koog;Chang, Dong Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.3 s.32
    • /
    • pp.363-375
    • /
    • 1997
  • This study encompasses the performance of static and fatigue test for the 8 large scale test specimens to clarify the fatigue behavior of coped stringer and the effect of the repair and strengthening on the damaged stringer of the floor system in steel railway bridges. For the purpose of the research, the actual stress wave for the existing bridge was measured, the basic stress range frequency histogram was made and the equivalent stress range was calculated. Using the result from the equivalent stress range made by adjusting the stress range, the static and fatigue test was carried out by identifying the previous rehabilitation and after. As the result of the static tests, it was revealed that the level of local stress under the S1 specimen test of the real equivalent stress range was similar to tensile strength of the test material, and it was consistent with the requirement of the initiation condition of the fatigue crack. Through the various rehabilitation methods to the damaged specimens, the effects of the repair and reinforcement were analyzed. According to the results of the repair of effect, bolting the high tension bolt over the stop hole was confirmed to be more adequate method than drilling only stop hole to delay the fatigue crack growth. Futhermore, in case of the stringer subjected by bending moment, the reinforcement over the upper flange side was determined to be a useful strengthening method, and the reinforcement to the web of the stringer was not appropriate to accomodate as a adequate strengthening method. Also it was confirmed that the category of the fatigue design for the coped stringer met with the category E specified on the fatigue design criteria of the Highway Standard Specification in Korea.

  • PDF

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - I : the Reason Why Crack Occurs (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - I : 균열 발생원인)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.299-305
    • /
    • 2009
  • In this study, in order to research the causes lead to fatigue crack in the coped stringer of a steel railway bridge, we take the steel railway bridge which actually occurs fatigue crack as a research object and manufacture the full size of crossbeam-stringer and floor system model to perform the experimental test. The results indicates that, the fatigue crack in the top of coped area of stringers is caused by the reciprocal action of the in plane stress in the tip of coped area of web by the negative moment occurred in the end of the stringers. While the fatigue crack in the bottom of coped area of stringers is due to the plane stress caused by the out-plane deformation relative to the bottom of coped area of web of the fixed end in the stringers.

A Study on Fatigue Crack at Coped Stringers of the Plate Girder Subway-Bridge (플레이트거더 지하철교량 세로보의 피로 균열에 관한 연구)

  • Jo, Jae Byung
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.5 s.72
    • /
    • pp.713-724
    • /
    • 2004
  • A fatigue crack found at the coped stringer of the old dismantled Dangsan Subway Bridge was numerically simulated. A model of a single span of the plate girder bridge with its beam elements was created and analyzed in order to obtain the nominal stress history caused by trains. A detailed FEM analysis of the coped stringer was conducted using a shell element model. A fracture mechanical model was used to estimate crack propagation. The stress intensity factors were calculated using the J-Integral method. The simulation with some reasonable assumptions showed that the calculated crack lengths were comparable to those found on the site.

Fatigue Crack Propagation in Coped Stringers of Steel Railway Bridges (강철도교 바닥판 세로보 절취부의 피로균열 진전해석)

  • Choi, Dong-Ho;An, Woo-Sung;Choi, Hang-Yong
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.557-562
    • /
    • 2003
  • The responses of the floor system of a railway bridge are investigated for fatigue life prediction of damaged members using fracture mechanics approach. Numerical analysis of the structure is performed in order to see the influence of track-structure interaction and continuity of the truss connection on the response of the bridge members. Fatigue crack growth analysis is carried through equivalent stress obtained from time-history analysis. The results of time-history analysis agree with measured responses. The fatigue propagation life increases as the curvature in the coped stringer increases.

  • PDF

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - II : Repair · Strengthening Method (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - II : 보수·보강 방법)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.307-313
    • /
    • 2009
  • In this study, in order to research the repair-strengthening methods, when fatigue crack occurs in the coped stringers of a steel railway bridge, we manufacture the full size of crossbeam-stringer and floor system model. Also the experimental test is performed on the coped stringers applying the repair-strengthening methods using the stop hole, combination plate, connection plate, bracket, and so on. The results indicate that, the most effective method is to set up connection plate and bracket in the top flange and bottom flange of the stringers, while we can consider the method of punching stop holes in the end of the crack as a subsidiary method. It is necessary to set up the combination plate when the length of crack is quite long.