• Title/Summary/Keyword: contractor system

Search Result 189, Processing Time 0.026 seconds

A Study on the Interpretation Trend of Current Cases for Warranty in U.S.A (미국의 Warranty 제도와 관련된 판례동향 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.101-109
    • /
    • 2010
  • Under the Civil Code and related law in Korea, the liability for defects after delivery belongs to the Contractor. However, various disputes have occurred in relation to the remedy of such defects and the compensation for damages, which are the main liability of a contractor in the event of defects. Despite court decisions regarding defect liability, many problems prevail in the real world. For this reason, this working-level research considers the introduction of a performance warranty contract system. To establish the system successfully, it is necessary to analyze the trend of various warranty cases in the US. Therefore, the warranty system of the US was first examined, and the effect of acceptance, notification and burden of proof, remedies under warranty clauses, and default termination were investigated and analyzed in this study.

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

A Study on the Development of CITIS System Prototype - Using a Web Development Tool - (CITIS 시스템의 프로토타입 개발 방안 - 웹 개발 도구 사용을 중심으로 -)

  • 박정선;김성희
    • The Journal of Society for e-Business Studies
    • /
    • v.2 no.1
    • /
    • pp.117-129
    • /
    • 1997
  • As the lifecycle of a product becomes shorter, the communication between a contractor and a supplier in product information has got more importance. The CITIS(Contractor Integrated Technical Information Service) is required to provide authorized users with access to both data and applications they need to complete a task for contract. With the growth of WWW, there has been much study for the use of WWW for the implementation of CALS. The WWW has been proved as an efficient tool for CALS implementation due to its of publicity, openness, and free accessibility. In this study, we suggest using WWW tools, here, an intranet tool, as a basis for the implementation of CITIS

  • PDF

A Study of the China Construction Laws and BOT Policies from Overseas EPC Contractor's View (중국 건설 법률과 BOT 정책에 대한 조사 연구;해외 EPC 건설업체의 관점)

  • Choi, Jae-Ho;Park, K.R.;Yun, H.J.
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.519-522
    • /
    • 2007
  • China infrastructure construction market has huge potential for increased use of PPP/BOT mode and one of the most attractive markets of doing business. However, there are still a multitude of challenges for overseas EPC contractor to enter into the China PPP/BOT market both internally and externally. Especially, the construction legal system and relevant policies are considered at present the biggest barriers in accessing China construction market. Therefore, the main purpose of the paper is to identify the impact of the construction laws, regulations and BOT-related policies on the viability of foreign contractor-led BOT project in China. To the satisfaction of the purpose, this paper will first analyze China construction laws based on the key issues that must be tackled by foreign EPC contractor before they enter into China. This summary gives the possible contract scheme for a BOT project of interest in which foreign contractors could define the scope of works and measure the viability of the project. Finally, a case study of wastewater treatment plant BOT project in China subsequently illustrates some of the lessons learned from the foreign contractor's perspectives for successfully participating in future environmental market in China.

  • PDF

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

A Study on the Evaluation of Safety Culture in Specialty Contractor (전문건설업 안전문화 평가에 관한 연구)

  • Shin, Sang-Yeon;Paik, Sinwon;Jung, Sung-Lyoung
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.18-25
    • /
    • 2021
  • Specialty contractor facilities, which involve a combination of welding and commissioning, face a high risk of serious accidents such as fire, explosion, and suffocation associated with welding work, nitrogen, and argon use. In such facilities, the organizational safety culture has considerable impact on the frequency of accidents. In this study, a safety culture evaluation was conducted on specialty contractors. NOSACQ-50, a standardized survey method on safety culture, was selected as an assessment tool to evaluate the safety culture in specialized construction companies that could not afford to invest heavily in safety. The self-administered questionnaire survey was conducted with 201 workers of four construction companies and the results were analyzed. It was found that in companies with low safety culture, the occurrence of irrationality was 66.0%, while in companies with high safety culture, the occurrence of irrationality was 42.6%. Thus, the difference in the occurrence of irrationality by safety culture was statistically significant. The difference in safety culture level according to the experience of occurrence of irrationality was also significant. It was also found that the higher the belief in safety management authorization, safety responsibilities of managers, worker safety priorities, and safety system effects, the lower the probability of irrationality.

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

A Study of the Development of Liquid-liquid Static Contactor Using Capillary Phenomena Induced by Highly Packed Fiber Bundle and its Characteristics (고밀집 섬유 집합체에 의해 유도된 모세관 현상을 이용한 정적 액-액 접촉장치의 개발과 그 특성 연구)

  • Kim, Kwang-Wook;Byeon, Kee-Hoh;Lee, Eil-Hee;Yoo, Jae-Hyung;Park, Hyun-Soo
    • Applied Chemistry for Engineering
    • /
    • v.7 no.4
    • /
    • pp.743-749
    • /
    • 1996
  • A new static contractor using capillary phenomena induced by a highly packed fiber bundle was developed for the solvent extraction. When two immiscible phases being cocurrently and forcedly fed into the packed fiber bundle, the contactor brings about a very large liquid-liquid contact area for mass transfer within a small definite space without any turbulence and drop phenomena. In order to test the characteristics and stability of the static contractor system, continuous extraction experiments of TBP-uranyl ion-nitric acid system were done and compared with the batch extraction experiment of the same chemical system. The performance of the static contractor were the same as that of the ideal batch extractor with the same extraction condition. For the increase of the extraction yield by the contactor, the increase of organic flow rate was required at a fixed aqueous flow rate, and a certain residence time of the aqueous phase flow within the contactor system had to be maintained to meet the performance of the batch system of the same phase ratio. The residence time in the case of TBP-uranyl ion-nitric acid system was about 1.9 minutes. This system was confirmed to be effective and stable enough for purposes of the kinetic study of solvent extraction as well as the mutual separation and purification of ordinary materials because of good reproducibility and the stable and large static liquid-liquid contact area.

  • PDF

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Design and Implementation of an Ethereum-Based Deliverables Management System for Public Information Software Project (이더리움 기반 공공정보 소프트웨어 사업산출물 관리 시스템 설계 및 구현)

  • Lee, Eun Ju;Kim, Jin Wook
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.175-184
    • /
    • 2022
  • Blockchain is being studied in various fields such as logistics, fintech, medical care, and the public sector. In the public information software project, some deliverables are omitted because the developed deliverables and the deliverables requested by the project management methodology do not match, and an additional process is required for payment. In this paper, we propose the deliverables management system for public information software project which is configured a distributed environment using the Ethereum blockchain and which has an automatic payment system only when all deliverables are approved. This system can keep the service available in case of system failure, provide transparency and traceability of deliverables management, and can reduce conflicts between the ordering company and the contractor through automatic payment. In this system, the information of deliverables is stored in the blockchain, and the deliverables that their file name is the hash value calculated by using the version information and the hash value of the previous version deliverable, are stored in the SFTP server. Experimental results show that the hash value of the deliverables registered by the contractor is correct, the file name of the deliverables stored in the SFTP server is the same as the hash value registered in the Ethereum blockchain, and the payment is made automatically to the Ethereum address of the contractor when all deliverables are approved.