• Title/Summary/Keyword: contract pricing system

Search Result 14, Processing Time 0.024 seconds

A Study on Pricing Decision Strategy of Small and Medium Size Manufacturing Company in Supply Chain Environment (공급 사슬 환경에서 중소 제조 기업의 가격 결정 전략에 관한 연구)

  • Hwang, Seung-June;Kim, Tai-Young;Keum, Byung-Chan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.2
    • /
    • pp.68-75
    • /
    • 2011
  • The purpose of this paper is to suggest a supplier and buyer's pricing decision strategy model with discount-policy over a long-term replenishment contract in a supply chain environment by small and medium size manufacturing company. We assume that the buyer has a superior economic power over a supplier and each agent in a supply chain is unaware of each other. The supplier proposes pricing decision strategy to induce the buyer to choose the terms of contract for the benefit of the supplier. Then buyer decides the terms of contract to maximize her profit considering supplier's discount-policy. We also present a numerical example to illustrate the efficiency of pricing decision strategy.

A Study on the Adoption of Electronic Contract Service (전자계약서비스의 문제점과 해결방안)

  • Choi, Seok-Beom;Kim, Tae-Hwan;Kim, In-Kyung;Kim, Jae-Hak;Park, Sun-Young;Yoon, Young-Rim
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.34
    • /
    • pp.157-185
    • /
    • 2007
  • The purpose of this thesis is to contribute to the activation of e-contract service for one stop e-trade by analyzing the problems and its solutions in e-contract service at home and abroad. In order to achieve the purpose of this thesis, case studies are done on e-contract service providers such as CECTRUST service of NTT DATA in Japan and HanCM.com of Haansoft in Korea and user companies such as Taisei Corporation using CECTRUST service and Hyundai Card using HanCM.com. The problems in the e-contract service are the lack of e-contract service providers, rare publicity of e-contract service, limited use of e-contract service at only home, higher pricing for e-contract service, short time management of e-contract documents by service providers, no application of newly developed security technology to e-contract service, unsatisfaction of requirements of e-contract service provider as trusted third party, absence of lower pricing e-contract service by service provider, authorizing key error in electronic signature under recognized authentication system in case of fail in renewal of digital certificate and reproduction of digital certificate. The solutions of these problems are the upbringing of e-contract service providers, broad publicity of e-contract service, development of e-contract service on a global basis, establishment of lower pricing for e-contract service, long time management of e-contract documents by service providers, application of newly developed security technology such as bio technology to e-contract service, satisfaction of requirements of e-contract service provider as trusted third party by designation of recognized e-document repository, development of lower e-contract service by way of application service provider(ASP), introduction of time stamping of e-contract document and signature key value. The limitation of this thesis is that the problems and its solutions could not meet with the broad recognition as they are conferred by intuition because of few e-contract service provider.

  • PDF

A Study on the Improvement of Price Structure of Multi-regional Water Supply System in Korea (국내 광역상수도 요금제도의 개선 방향에 관한 연구)

  • Kim, Yeon-Bae;Heo, Eun-Nyeong;Kim, Tae-Yu;Kim, Wan-Gyu
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.537-545
    • /
    • 1999
  • This study examines three counterplans for the improvement in price structure of Korean multi-regional water supply system. First, price differentiation between industrial and residential water uses is analyzed using several pricing methods. It has been estimated that the industrial water price by the Ramsey pricing method is needed to be two to two and half times higher than the price of residential water to achieve maximum social welfare. Second, peak-load pricing is then studied to seek for the effectiveness of seasonal differentiation in water price. It has been found that consideration of dam facilities and their functions is the key factor for the effectiveness of the seasonal differentiation in water price. Finally, the discussion about the introduction of contract pricing system to the multi regional water supply system to achieve optimal investment plan for the future water demand is presented. We has found that the introduction of contract pricing system will greatly increase the efficiency in future investment plan of the multi-regional water supply system.

  • PDF

The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

An Empirical Study on Determining Factors of estimation cost: Focused on Defense Goods (예정가격 결정요인에 관한 연구: 방산물자를 중심으로)

  • Song, Young-Il;Kim, Dong-Uk;Shim, Suk-Hwa
    • Journal of the military operations research society of Korea
    • /
    • v.37 no.1
    • /
    • pp.99-118
    • /
    • 2011
  • According to the National Contract Law, when determining Estimation cost Contract officers should consider contract quantity, contract period, supply and demand condition, difficulty of contract enforcement, terms and condition, and other various conditions based market price, costing based pricing, and appraisal. And they should not overestimate or underestimate the estimation cost. But the estimation cost system is used as preparedness for audit against the contract law. In this study, we identified the factors affecting estimation cost and analyzed their influence on estimation cost.

Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation - (한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 -)

  • 이승규;박용삼
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF

A Framework for Investment Justification and Economic Operation- (한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영-)

  • 이승규;박용삼
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Modeling Coordinated Contracts for a Supply Chain Consisting of Normal and Markdown Sale Markets

  • Lee Chang Hwan
    • Management Science and Financial Engineering
    • /
    • v.11 no.1
    • /
    • pp.1-24
    • /
    • 2005
  • The results of a study of the coordination effect in stocking and promotional markdown policies for a supply chain consisting of a retailer and a discount outlet (DCO) are reported here. We assume that the product is sold in two consecutive periods: the Normal Sales Period (NSP) and the subsequent Promotional Markdown Sales Period (PSP). We first study an integrated supply chain in which managers in the two periods design a common system so as to jointly decide the stocking quantities, markdown time schedule, and markdown price to maximize mutual profit. Next, we consider a decentralized supply chain. An uncoordinated contract is designed in which decisions are decentralized to optimize the individual party's objective function. Here, three sources of system inefficiencies cause the decentralized system to earn a lower expected system profit than that in the integrated supply chain. The three sources are as follows: in the decentralized system the retailer tends to (1) stock less, and (2) keep a longer sales period, and the DCO tends to (3) stock fewer leftovers inventories and charge a higher markdown price. Finally, a numerical experiment is provided to compare the coordinated model with the uncoordinated model to explore factors that make coordination an effective approach.

A Comparative Analysis of Teukyakmeip and Consignment (특약매입과 콘사인먼트 비교분석)

  • Kim, Dong-Ho;Kim, Sung-Soo;Jung, Myung-Hee;Youn, Myoung-Kil
    • Journal of Distribution Science
    • /
    • v.12 no.4
    • /
    • pp.5-9
    • /
    • 2014
  • Purpose - The purpose of this study was to compare and contrast the applicability and effectiveness of both teukyakmeip contracts of Korea and consignment contracts of the United State to demonstrate the effectiveness and practicability of teukyakmeip in Korea. These are popular contract agreements between large retailers and their suppliers and vendors. In recent years, teukyakmeip was critically examined and scrutinized by the politicians, the media, and the public of Korea. Consequently, this paper focusesheavily on identifying and analyzing different types of contract agreements between large retailers and their suppliers that currently exist in Korea and compares and contrasts those analyzed contract agreements with teukyakmeip. The article also comparesand contrasts teukyakmeip with the consignment agreements of the United States to identify similarities and differences. Research design, data, and methodology - This study is a descriptive study and has used personal interviews to collect and analyze the data. This study also fits the definition of the case study wherein it is entirely focused on investigating a real-life event: analyzing and examining contract agreements in the distribution industry. Both randomly selected management and vendor representatives from the three major department stores, Lotte, Hyundai, and Shinsegae, in Korea were interviewed between July and September 2013. The analysis of the consignment agreement was conducted based on existing secondary data. Results - Although the evidence of the abuse of teukyakmeip and consignment by large retailers from both countries clearly exists, the findings suggestthat both contract agreements would remain as the most relevant and effective legal contracts between large retailers and their suppliers. Based on the comparisonanalysis of teukyakmeip and consignment, both contracts indicated that suppliers are fully responsible for inventory and inventory management. If sales person is necessary for promoting special product, then suppliers are responsible for providing a sales person and their wages under both contracts. However, American department stores, those located outside urban area, tend to use their own employees to perform special product and sales promotion. The retailersare fully responsible for any interior or floor design or redesign of the retail store to accommodate the products from vendors under consignment; however, both suppliers and retailers share the cost of designing and redesigning the interior to accommodate vendors'products under teukyakmeip. Suppliers are responsible for pricing and supplying the quantity of the products under both agreements. Both contracts allow special sales commission as long as vendors agreed. Vendors use this special commissionto introduce their new products or apply market penetration strategy. Conclusions -The findings of this study showed the changing pattern of contract agreements between large retailers and their suppliers from both countries. Furthermore, this study evidently generated policy implications of teukyakmeip which recently became the major social issue in Korea and attracted many policymakers to gain political points by criticizing the teukyakmeip system and the large retailers. The findings of the study would be valuable to policy makers in making appropriate decisions and to large retailers and vendors in making beneficial agreements. The major implication of this study is that teukyakmeip and consignment agreements include very similar or almost identical characteristics, and they are popular among department stores and suppliers. The issue of abolishing teukyakmeip in Korea needs to be examined cautiously because teukyakmeip is the best one available at the moment, and the study suggests that no one benefits from abolishing this system.

A Model of Work Breakdown Structure for being applied to Historical Data in BTL Project for Educational Facilities (교육시설 BTL 사업의 실적공사비 적용을 위한 작업분류체계(WBS) 구축)

  • Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.499-502
    • /
    • 2007
  • The government abolished the existing method to calculate the construction price by the quantity take-off and pricing. It has introduced a new estimating system which uses the actual cost data on the basis of actual contract unit price. However, in the case of the current method to calculate the estimate price of BTL educational facilities, it is difficult to prepare an accurate ground for calculating unit prices due to a lack of standardized work breakdown structure (WBS) and guidelines for the detailed bidding documents. Thus, this research aims to establish WBS using the actual construction price on the basis of the actual bidding documents for the previous construction of BTL educational facilities. This specific WBS can be differentiated from the general WBS which is not suited for construction of the educational facility. It makes possible to build the construction information classification system and it helps to systemize the maintenance and repair cost items.

  • PDF