• Title/Summary/Keyword: continuous-span bridge

Search Result 234, Processing Time 0.02 seconds

Seismic applicability of a long-span railway concrete upper-deck arch bridge with CFST rigid skeleton rib

  • Shao, Changjiang;Ju, Jiann-wen Woody;Han, Guoqing;Qian, Yongjiu
    • Structural Engineering and Mechanics
    • /
    • v.61 no.5
    • /
    • pp.645-655
    • /
    • 2017
  • To determine the seismic applicability of a long-span railway concrete upper-deck arch bridge with concrete-filled steel-tube (CFST) rigid skeleton ribs, some fundamental principles and seismic approaches for long-span bridges are investigated to update the design methods in the current Code for Seismic Design of Railway Engineering of China. Ductile and mixed isolation design are investigated respectively to compare the structural seismic performances. The flexural moment and plastic rotation demands and capacities are quantified to assess the seismic status of the ductile components. A kind of triple friction pendulum (TFP) system and lead-plug rubber bearing are applied simultaneously to regularize the structural seismic demands. The numerical analysis shows that the current ductile layout with continuous rigid frame approaching spans should be strengthened to satisfy the demands of rare earthquakes. However, the mixed isolation design embodies excellent seismic performances for the continuous girder approaching span of this railway arch bridge.

The Examination of Application in Curved Bridge used IPC Girder (곡선교에서의 IPC 거더교 적용성 검토)

  • 한만엽;곽창현
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.847-852
    • /
    • 2001
  • This study is to applicate IPC girder at curved bridge. This study introduces the variable(radius, $d_{ci}$, $d_{co}$, etc..) used in design IPC curved bridge. And this presents the possible radius in simple bridge and continuous bridge. For example, simple bridge that have span length is 30m, minimum possible radius is 300m. In continuous bridge, girders are arranged by sloped in $\theta$. So in this case, the bridge is under consideration that horizontality pressure in bridge pier.

  • PDF

Seismic Analysis of the Multi-Span Continuous Bridge Considering the Friction of the Expansion Bearings (가동받침 마찰을 고려한 다경간 연속교의 내진 해석)

  • Juhn, Gui Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.1
    • /
    • pp.63-70
    • /
    • 1994
  • This study presents the nonlinear dynamic analysis method of the multi-span continuous bridge considering the friction of the expansion bearings. Also the numerical analysis is performed for estimating the effect of the friction on the seismic response of the multi-span continuous bridge under the longitudinal ground motion compatible to Korean bridge design response spectra. It is found that even small friction coefficient of the expansion bearings has significant effect on reducing the superstructure displacement due to energy dissipation and distributing the inertia force of the superstructure to the substructures due to frictional force. It is observed that such favorable friction effects increase as the friction coefficient increases and the magnitude of the ground motion decreases. Therefore, the friction of the expansion bearings can be effectively used for the safe and economic design of the continuous span bridge with many spans and large superstructure weight under the small to medium scale longitudinal ground motions.

  • PDF

Camber Management of Continuous Preflex Girder Bridges (연속형 프리플렉스 합성거더 교량의 캠버 관리)

  • Kim, Jong-In;Choi, Young-Wha
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.7 no.4
    • /
    • pp.433-441
    • /
    • 2004
  • This paper presents a strategy for the quality assurance of the continuous preflex composite girder bridge through the camber management of the girder during construction. The construction stages which require welding, balanced preflexion loads at the ends, etc. may cause unexpected large deformation to the preflex girder. Furthermore, these defects can be detected by measurements and analyses of the girder behavior which is sometimes time consuming. In the present study, preflex girder's camber data at equally spaced nodes in each construction stage are obtained and analyzed for the quality control of thee span continuous preflex girder composite bridge.

  • PDF

A comparative study on aseismic performances of base isolation systems for multi-span continuous bridge (다경간 연속교에 대한 면진용 교좌장치의 내진성능 비교연구)

  • Park, Kyu-Sik;Lee, Chong-Heon;Lee, In-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.04a
    • /
    • pp.383-390
    • /
    • 2001
  • Various base isolation systems, which are widely used, are compared for aseismic performances of multi-span continuous bridge. They are the P-F, RB, LRB, R-FBI and EDF systems. Sensitivity analyses are carried out to determine the design parameters of various devices. The design parameters, natural period of the isolated bridge and friction coefficient of the bearing, are determined by the reciprocal relationship between displacement and bending moment of the structure. Then the relative effectiveness of the bearings is described. Bridge with the R-FBI system shows the smallest peak displacement of deck whereas bridge with the EDF system shows the smallest peak bending moment of the lower end of pier in numerical examples. Furthermore, the peak responses of bridge with the friction type bearing are less sensitive to substantial variations in the frequency range and intensity of the ground excitation than those with the rubber type bearing.

  • PDF

A Study on the Structural Behaviors of Interior Support of 6 Span SCP Continuous Girder Bridge (6경간 SCP 거더교의 연속화에 따른 중간 지점부 구조거동에 관한 연구)

  • Yhim, Sung-Soon;Son, Suk-Ho;Seo, Ki-Hong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.135-143
    • /
    • 2004
  • In this paper, 6 span SCP continuous girder bridge's structural behavior were studied by analytic and experimental method To study structural behavior of SCP girder, we used PSC theory and steel girder theory. To examine slab concrete crack, concrete stress, and fatigue stress of steel, we achieved a static load and fatigue test. In the result, 6 span SCP girder bridge connected at the interior support about actuality bridge have enough structural capacity under service loads.

Analysis and monitoring on jacking construction of continuous box girder bridge

  • Li, Fangyuan;Wu, Peifeng;Yan, Xinfei
    • Computers and Concrete
    • /
    • v.16 no.1
    • /
    • pp.49-65
    • /
    • 2015
  • It is hard to guarantee the strict synchronization of all the jacking-up points in the integral jacking of a large-span continuous box girder bridge. This paper took the Hengliaojing Bridge as background, which need jacking up as an object with 295m length and more than 10,000tons weight, adopted 3D software to calculate the unsynchronized jacking-up working conditions, and studied the relationships between the unsynchronized vertical difference and the girder's deformation behaviour. The aim is to verify the maximum value of the unsynchronized vertical difference, and guide the construction and ensure safety. The monitoring system with its contents is introduced corresponding to the analysis. The results of the deck relative elevations prove that it is difficult to avoid the deck torsional deformation for jacking different; especially the side span shows more deformations for its smaller stiffness. The maximum difference is smaller than the limited value with acceptable stresses in the sections. The jacking heights of the pier in each construction step are controlled regularly according to the design. The shifting of the whole bridge in longitudinal direction is smaller than in transverse direction. The several beginning steps are the key to adjust their support reactions. This study is one parts of the fundamental research for the code "Technical specification for bridge jacking-up and reposition of China". The whole synchronous jacking project of the main bridge set a world record by the World Record Association for the whole bridge jacking project with the longest span of the world.

Dynamic Behavior Analysis of PSC Train Bridge Friction Bearings for Considering Next-generation High-speed Train (차세대 고속철의 증속을 고려한 PSC 철도교 마찰 교량받침의 동적 거동 해석)

  • Soon-Taek Oh;Seong-Tae Yi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.6
    • /
    • pp.39-46
    • /
    • 2023
  • In this study, the dynamic behavior of friction bearings of PSC (Pre-Stressed Concrete) box train continuous bridge was numerically analyzed at 10 km/h intervals up to 600 km/h according to the increasing speed of the next-generation high-speed train. A frame model was generated targeting the 40-meter single-span and two-span continuous PSC box bridges in the Gyeongbu High-Speed Railway section. The interaction forces including the inertial mass vehicle model with 38 degrees of freedom and the irregularities of the bridge and track were considered. It was calculated the longitudinal displacement, cumulative sliding distance and displacement speed of the bridge bearings at each running speed so that compared with the dynamic behavior trend analysis of the bridge. In addition, long-term friction test standards were applied to evaluate the durability of friction plates.

An Analysis of Bending Behavior of Continuous P.S.C Girder Railway Bridge by Using Down-Up Method (주형의 하강ㆍ상승을 이용한 연속 P.S.C빔 철도교의 휨거동 해석)

  • 구민세;위영민;최인식
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.293-298
    • /
    • 2001
  • 2span continuous Prestressed concrete girder railway bridges, span length 21m, 25m, 30m, 35m, that down-up method is applied and that designed to satisfy service load in accordance with design criteria of railway bridge can be dropped in their hight compared with existing simply supported prestressed concrete girder railway bridges. Continuous bridges result in guaranteeing safety against bending behavior by loading the practical railway moving load with each velocity. But the natural frequency of span length 21m is estimated not to satisfy recommended limitation of UIC 776-1R..

  • PDF

Wheel Load Distribution of Continous Reinforced Concrete Slab Bridge (연속 철근콘크리트 슬래브 교량의 윤하중 분포폭에 관한 연구)

  • 신호상;오병환
    • Magazine of the Korea Concrete Institute
    • /
    • v.10 no.4
    • /
    • pp.135-143
    • /
    • 1998
  • The wheel load distribution width for lane load is not specified in current Korea bridge design code(KD code), not like in current AASHTO and AASHTO LRFD specifications which specity it as twice of wheel load distribution width for wheel load. In this study, the wheel load distribution width in continuous reinforced concrete slab bridge is investigated. The major variables affecting the wheel load distribution of a reinforced concrete continuous slab bridge are the span length, bridge width, existence edge beam and boundary condition. From a series of comprehensive parametric study on each variable, the formula for wheel load distribution in continuous reinforced concrete slab bridge is proposed from the nonlinear regression analysis of finite element analysis results. The proposed formulas can be used efficiently in the accurate design of continuous reinforced concrete slab bridges.