• Title/Summary/Keyword: construction work site

Search Result 911, Processing Time 0.026 seconds

Safety Management of Steel Pipe Scaffold using UAV (무인항공기(UAV)를 활용한 건설현장 가시설물 안전관리)

  • Jun, Byong-Hee;Kim, Nam-Gyun;Jun, Kyo-Won;Choi, Bong-Jin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.3
    • /
    • pp.59-67
    • /
    • 2019
  • In this study, the UAV (Unmammed Aerial Vehicle) was applied for the photogrammetry of the construction site and the safety management of steel pipe scaffold. The research site is a temporary facility for building reinforcement on Samcheok Campus of Kangwon National University. The installation condition of the steel pipe scaffold was investigated, and the pillar distance, the beam distance and the wale distance were surveyed. As a result, it was found that the beam distance of the scaffold in the longitudinal direction was in good agreement with the standard, but the pillar distance and the wale distance were found to be less than the standard. Three-dimensional data can be used in drone shooting to enable three-dimensional measurement, so that it is possible to measure facilities hidden or located inside other facilities. Through the drone shooting, the condition of the site can be quickly recorded and the surveying can be carried out without interfering with the work of the field personnel. Although the installation of the temporary structure must be strictly observed to ensure the safety of the workers, it is found that the installation standards are still neglected in the field. In order to prevent this practice, it was thought that the legal system should be supplemented so that it could be checked periodically by using UAV in the field process management.

The Study of Comparison on Rapping Force on Generation of Corona Discharge Electrode of Electrostatic Precipitator (전기집진장치의 코로나 전류 발생 전극 제작에 따른 추타력 비교에 관한 연구)

  • Lee, Kang-Wuk;Park, Jeong-Ho;Jang, Seong-Ho;Lim, Woo-Taik;Suh, Jeong-Min
    • Journal of Environmental Science International
    • /
    • v.26 no.2
    • /
    • pp.231-238
    • /
    • 2017
  • Rapid industrial development has led to a serious problem of pollution in the industrial sector. With the increasing social need for environmental protection, research on air pollution prevention equipment for reducing pollutants in industrial processes is actively being undertaken. The deterioration of existent, installed facilities, their increased emission rates, and the strengthening of the effluent quality standards make complying with permissible emission standards difficult. In fact, installing new electric precipitators or complementing existent facilities is inevitable. The expansion and complementation of the installed electrical precipitators have led to improvements in dust collection efficiency, shorter working times, and lower costs. Because of its easy installation and simple manufacturing process, the production method with the discharge electrode of an electric precipitator is widely used. The following conclusions were reached by classifying discharge electrodes into four types based on the production method and mutually comparing them by their dust collection efficiency. None of the four types used in this study were damaged by impact. However, we were able to confirm some strain from the compression sites of both type A and type B. Both type B and type C are expected to have greater dust collection efficiencies than the other models due to their large vibration transmissibility. Moreover, the high vibrational energy is expected to cause rapping damage during its operation. Particularly, in the case of type B, some of the strain was found at the end of the compression site. The coupling schemes of both type C and type D are out of vibration transmissibility. On the other hand, the ability to maintain straightness and solidity of the side is regarded as outstanding and stable. Type D has outstanding on-site workability, considering the presence of locking, structural stability, and work conditions. From these experiments, we determined that type C is the most ideal connection method of discharge electrode, considering its construction period of renovation. Type C is inferior to type D with regard to on-site workability. However, type C has outstanding dedusting transmission with regard to the straightness, solidity maintenance, and vibration of shearing stress.

A Vibration Evaluation and Improvement Scheme for Open Test Blasting (노천시험발파의 진동평가와 개선방안)

  • Kim, Eung-Rok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.310-315
    • /
    • 2017
  • Although studies evaluating the effects of the blasting vibration on the adjacent structures from various angles have continued, cases of securing the safety of the adjacent buildings and researching the proper blasting method for the field condition by analyzing the vibration waveform of the measuring field while performing the open pit blasting are poor. Therefore, it is necessary to present a remedy for blasting pattern selection through test blasting that is appropriate for field conditions, and is economical and efficient. In this study, open pit blasting work was conducted based on the separation distance applied according to the standard blasting method by test blasting and the vibration regulation standard in the road expansion construction site to measure the blasting vibration value, and the vibration prediction equation by blasting methods was examined using a regression analysis computer program to calculate K, N, and R of the confidence level 95%. By setting the blasting allowed vibration standard of the test blasting target area to 0.3cm/sec, and the charring weight and blasting method by the separation distances according to the blasting vibration estimation equation of the open pit blasting guideline and the blasting vibration estimation equation of the test blasting were compared/analyzed, it was possible to identify the factors that increased the working expenses. In addition, the measurement and analysis of the adjacent structures during open pit blasting and the blasting vibration were performed after selecting the most adjacent structure to the open pit blasting spot to analyze the problems on the test blasting procedure and analysis method in the open pit blasting design/construction guidelines, which appeared in the process of completing open pit blasting construction, and a remedy is presented.

The PM2.5 Concentration and Components Characteristics in Miryang (밀양지역의 PM2.5 농도 및 성분특성)

  • Suh, Jeong-Min;Kim, Young-Sik;Jeon, Bo-Kyung;Choi, Kum-Chan;Ryu, Jae-Yong;Park, Jeong-Ho
    • Journal of Environmental Science International
    • /
    • v.16 no.12
    • /
    • pp.1355-1367
    • /
    • 2007
  • This study summarizes the relations among $PM_{2.5}$ concentration, water-soluble ions concentration, metallic element Components characteristics and SPSS in negative ion and metallic element of $PM_{2.5}$ particle in Miryang.(By the urban area, the industrial complex area and the suburban area according to the season) $PM_{2.5}$ concentration of total 72 samples collected from 3 sites turned out to range from 3.47 to 34.7 ${\mu}g/m^3$, and the average concentration was the suburban area-the kin nup(16.00 ${\mu}g/m^3$) > the urban area-the roof of the old Miryang university(10.32 ${\mu}g/m^3$) > the industrial complex-Sapo industrial complex(10.29 ${\mu}g/m^3$). In particular, the suburban area had $PM_{2.5}$ concentration 1.5 times those of urban area, industrial complex. It was thought although the site was suburban and farm-side without pollutants around, it had a higher concentration value influenced by external factors including the brickyard, small-scale incinerator, driving range construction, construction on the Daegu-Busan express and the widening of the four-lane road between Miryang-Anyang nearby. As for water-soluble ions among $PM_{2.5}$ particle collected in Miryang area, $SO4_{2^-}$ accounted for 60% and $NO_{3^-}$, was 30% in spring and summer. And $NO_{3^-}$ accounted for 50% and $SO4_{2^-}$ was 35% in fall and winter. The AI value of metallic Components among $PM_{2.5}$ particle collected in Miryang area had a high value influenced by the apartment complex construction and the extension work of road. The industrial complex area had Zn concentration 3 times, and Fe concentration 2 times those of urban area and suburb area. When it comes to the relation with metallic elements in urban area, the highest coefficient of correlation was between Cr-Fe with 0.85, and Pb-Cd turned out in the reverse correlation. Among metallic elements, the coefficients of correlation between Zn and Cr, Mn, Fe, NI were high in industrial complex area. The highest coefficient of correlation was between Mn-Zn with 0.88, meanwhile Ni and Cu, Cd turned out in the reverse correlation in the suburb area. These coefficients of correlation are attributed to the difference in pollutant sources, rather than difference in pollutant and non-pollutant.

Geostatistical Integration Analysis of Geophysical Survey and Borehole Data Applying Digital Map (수치지도를 활용한 탄성파탐사 자료와 시추조사 자료의 지구통계학적 통합 분석)

  • Kim, Hansaem;Kim, Jeongjun;Chung, Choongki
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.3
    • /
    • pp.65-74
    • /
    • 2014
  • Borehole investigation which is mainly used to figure out geotechnical characterizations at construction work has the benefit that it provides a clear and convincing geotechnical information. But it has limitations to get the overall information of the construction site because it is performed at point location. In contrast, geophysical measurements like seismic survey has the advantage that the geological stratum information of a large area can be characterized in a continuous cross-section but the result from geophysics survey has wide range of values and is not suitable to determine the geotechnical design values directly. Therefore it is essential to combine borehole data and geophysics data complementally. Accordingly, in this study, a three-dimensional spatial interpolation of the cross-sectional distribution of seismic refraction was performed using digitizing and geostatistical method (krigring). In the process, digital map were used to increase the trustworthiness of method. Using this map, errors of ground height which are broken out in measurement from boring investigation and geophysical measurements can be revised. After that, average seismic velocity are derived by comparing borehole data with geophysical speed distribution data of each soil layer. During this process, outlier analysis is adapted. On the basis of the average seismic velocity, integrated analysis techniques to determine the three-dimensional geological stratum information is established. Finally, this analysis system is applied to dam construction field.

A Case Study of Nitrox Usage in Diving Operation of the Busan-Geoje Fixed Link Immersed Tunnel (거가대교 침매터널 잠수작업에서의 나이트록스 사용 사례 분석)

  • Woo, Dae-Hee;Kang, Sin-Young;Lee, Min-Gu
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.6
    • /
    • pp.790-797
    • /
    • 2015
  • This study tried to evaluate the safety and economical benefit of Nitrox-diving by comparing with Air diving. We used actual diving data which was recorded in construction site of the Busan-Geoje fixed link immersed tunnel in 2010. The study method was to assort and analyze the diving data by divers, depth, breathing air, and diving table. Furthermore, the study examined the possibility of outbreak decompression sickness by comparing Nitrox diving and Air diving in no-decompression limit time, decompression time, working time. As a result, this study confirms that if certain diver breathe Nitrox for diving and oxygen for decompression, not only the risk of decompression sickness could be minimized, but also duration of decompression could be shortened. Moreover, it was estimated that a remarkable difference(more than 3 times) between actual duration of underwater construction period and virtual construction period by using air. As a result, the study confirmed that Nitrox diving is more efficient and economical than Air diving in physically limited and hazardous diving environment.

Developing Response Plan for the Direct Buying System for SME's Construction Materials based on the Analysis of Material Procurement Management Load: Focused on the Owner Providing Public Apartment Housing (지급자재 조달관리부담 평가에 기초한 중소기업 공사용자재 직접구매제도 대응방안: 공공아파트를 공급하는 발주자를 중심으로)

  • Song, Sang-Hoon;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.4 no.4
    • /
    • pp.425-434
    • /
    • 2013
  • The Small and Medium Business Administration specified 123 construction materials mandatory to purchase directly and forced the public owners to provide the contractors with materials as required by related law. This study extensively reviewed various characteristics and management factors of the owner-providing materials consumed in the public apartment housing under Direct Buying System(DBS) from the public owner's perspective. Subsequently, the major managed materials were identified, and the proper response plan was developed along the material procurement process. The Procurement Management Load Indices (PMLI) of 43 materials were evaluated according to rating criteria with procurement path, project-specified level, user requirement level, supplier's responsibility, on-site work requirement, additional parts, and inspection standards. The tile and aluminum windows were classified in the group needing high-level procurement efforts to reduce the errors and ensure the efficiency. The accurate quantity estimation method, definite purchase details, management activity definition before and after production, additional quantity for rework, interference coordination were defined as the essential activities for effectively responding to DBS.

Experimental Study on Deformation Resistance Capacity of SY Permanent Steel Form for RC Beam and Girder under Casting Concrete (SY 비탈형 보 거푸집의 콘크리트 타설시 변형저항성능에 관한 실험적 연구)

  • Bae, Kyu-Woong;Shin, Sang-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.605-615
    • /
    • 2021
  • Recently, to shorten construction periods and reduce labor costs, the need for a corrugated beam form in the RC structure is being emphasized. The purpose of this study is to evaluate the deformation performance of SY Beam, a newly developed corrugated beam form work, during concrete casting. The standard cross-sectional shape of SY Beam was determined by modeling the deck structure of various thicknesses using the MIDAS GEN program. As a result, the cross-sectional dimensions of the SY Beam were determined to be 400mm and 450mm in width and height, respectively. A total of three SY Beam specimens were fabricated using steel plate thicknesses of 0.8, 1.0, and 1.2mm. The load conditions applied during casting concrete at the actual site are reflected. The vertical and horizontal displacements of the SY beam were measured during concrete casting. As a result, the vertical displacement showed a tendency to decrease as the thickness increased. Considering both vertical and horizontal displacement, the case with steel plate thickness of 1.2mm is the safest and most immediately applicable to the field. In the future, to secure manufacturability, constructability, and economics, the optimum steel plate thickness should be derived, and additional analysis and experimental studies for 1.05, 1.1, and 1.15mm are required.

Characteristics of the construction process, the history of use and performed rituals of Gyeongungung Heungdeokjeon (경운궁 흥덕전의 조영 및 사용 연혁과 설행된 의례의 특징)

  • LIM, Cholong;JOO, Sanghun
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.1
    • /
    • pp.281-304
    • /
    • 2022
  • Heungdeokjeon was the first pavilion built on the site of Sueocheong during the expansion of Gyeongungung. In this study, we tried to clarify the specific construction process of Heungdeokjeon, which was used for various purposes such as the copy location for Portraits of ancestors, temporary enshrinement site, and the funeral building for the rest of the body, which is Binjeon. In addition, we tried to confirm the historical value based on the characteristics derived by the history of the building and the rituals performed. Heungdeokjeon began to be built in the second half of 1899, and is estimated to have been completed between mid-February and mid-March 1900. It was a ritual facility equipped with waiting rooms for the emperor and royal ladies as an annex. The relocation work was planned in April 1901 and began in earnest after June, and it was closely linked to the construction of attached buildings of Seonwonjeon. In addition, comparing the records on the construction and relocation cost of Heungdeokjeon with those related to the reconstruction of Seonwonjeon, it was confirmed that annex buildings of Heungdeokjeon were relocated and used as annex buildings of Seonwonjeon. The characteristics identified in the process of Heungdeokjeon used as a place to copy portraits are as follows. First, it was used as a place to copy portraits twice in a short period of time. Second, it was the place where the first unprecedented works were carried out in relation to the copying of portraits. Third, the pavilion, which was specially built for imperial rituals, was used as a place to copy portraits. Since then, it has been used as a funeral building for the rest of the body, and features different from those of the previous period are identified. It was the building dedicated to rituals for use as Binjeon, and was also a multipurpose building for copying portraits. In other words, Heungdeokjeon, along with Gyeongbokgung Taewonjeon, is the building that shows the changes in the operation of Binjeon in the late Joseon Dynasty. Characteristics are also confirmed in portrait-related rituals performed at Heungdeokjeon. The first is that Jakheonlye was practiced frequently in a short period of time. The second is that the ancestral rites of Sokjeolje and Bunhyang in Sakmangil, which are mainly held in the provincial Jinjeon, were identified. This is a very rare case in Jinjeon of the palace. The last is that Jeonbae, jeonal, and Bongsim were implemented mutiple times. In conclusion, Heungdeokjeon can be said to be a very symbolic building that shows the intention of Gojong, who valued imperial rituals, and the characteristics of the reconstruction process of Gyeongungung.

A Study on the Verification of an Indoor Test of a Portable Penetration Meter Using the Cone Penetration Test Method (자유낙하 콘관입시험법을 활용한 휴대용 다짐도 측정기의 실내시험을 통한 검증 연구)

  • Park, Geoun Hyun;Yang, An Seung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.2
    • /
    • pp.41-48
    • /
    • 2019
  • Soil compaction is one of the most important activities in the area of civil works, including road construction, airport construction, port construction and backfilling construction of structures. Soil compaction, particularly in road construction, can be categorized into subgrade compaction and roadbed compaction, and is significant work that when done poorly can serve as a factor causing poor construction due to a lack of compaction. Currently, there are many different types of compaction tests, and the plate bearing test and the unit weight of soil test based on the sand cone method are commonly used to measure the degree of compaction, but many other methods are under development as it is difficult to secure economic efficiency. For the purpose of this research, a portable penetration meter called the Free-Fall Penetration Test (FFPT) was developed and manufactured. In this study, a homogeneous sample was obtained from the construction site and soil was classified through a sieve analysis test in order to perform grain size analysis and a specific gravity test for an indoor test. The principle of FFPT is that the penetration needle installed at the tip of an object put into free fall using gravity is used to measure the depth of penetration into the road surface after subgrade or roadbed compaction has been completed; the degree of compaction is obtained through the unit weight of soil test according to the sand cone method and the relationship between the degree of compaction and the depth of the penetration needle is verified. The maximum allowable grain size of soil is 2.36 mm. For $A_1$ compaction, a trend line was developed using the result of the test performed from a drop height of 10 cm, and coefficient of determination of the trend line was $R^2=0.8677$, while for $D_2$ compaction, coefficient of determination of the trend line was $R^2=0.9815$ when testing at a drop height of 20 cm. Free fall test was carried out with the drop height adjusted from 10 cm to 50 cm at increments of 10 cm. This study intends to compare and analyze the correlation between the degree of compaction obtained from the unit weight of soil test based on the sand cone method and the depth of penetration of the penetration needle obtained from the FFPT meter. As such, it is expected that a portable penetration tester will make it easy to test the degree of compaction at many construction sites, and will lead to a reduction in time, equipment, and manpower which are the disadvantages of the current degree of compaction test, ultimately contributing to accurate and simple measurements of the degree of compaction as well as greater economic feasibility.