• Title/Summary/Keyword: construction time and costs

Search Result 383, Processing Time 0.024 seconds

Development of Remote Control System based on CNC Cutting Machine for Gradual Construction of Smart Factory Environment (점진적 스마트 팩토리 환경 구축을 위한 CNC 절단 장비 기반 원격 제어 시스템 개발)

  • Jung, Jinhwa;An, Donghyeok
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.8 no.12
    • /
    • pp.297-304
    • /
    • 2019
  • The technological advances such as communication, sensor, and artificial intelligence lead smart factory construction. Smart factory aims at efficient process control by utilizing data from the existing automation process and intelligence technology such as machine learning. As a result of constructing smart factory, productivity increases, but costs increase. Therefore, small companies try to make a step-by-step transition from existing process to smart factory. In this paper, we have proposed a remote control system that support data collection, monitoring, and control for manufacturing equipment to support the construction of CNC cutting machine based small-scale smart factory. We have proposed the structure and design of the proposed system and efficient sensing data transmission scheme. To check the feasibility, the system was implemented for CNC cutting machine and functionality verification was performed. For performance evaluation, the web page access time was measured. The results means that the implemented system is available level.

A Study on the Improvement of the Development Charges System (개발부담금 제도 개선방안에 관한 연구)

  • Choi, YeunHee;Yu, SeonBong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.61-71
    • /
    • 2019
  • In this study, the constitutional basis of public concept of land and concept of development gains are confirmed, and justification of the development charges system through the precedent of the Constitutional Court is investigated, and suggestions for improvement of fairness and reliability of development charges calculation are proposed. First, it is necessary to develop a system for estimating the development charges for securing transparency of the development charges system, preventing speculative development projects, and streamlining administrative efficiency. Second, it is necessary to prevent bad calculation by institutionalizing the responsibilities of experts to construct specification of the development cost calculation sheet submitted by taxpayers. Third, in order to precisely calculate the development cost, basic data should be specified in conditions for approval from the time of granting permission, or it should be minutely described in development charge treatment regulations.

Economical Analysis and Estimate Method of Possible Working Hours for Marine Rock Excavation Work Regarding the Tide Cycle (조석의 주기를 고려한 해상 암굴착 공사의 경제성 분석 및 작업가능시간 산정 방법에 관한 연구)

  • Kwon, Soon-Boum;Ock, Jong-Ho;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.142-151
    • /
    • 2007
  • The rock excavation work on the sea is planned as underwater process if the elevation of the rock is lower than the M.S.L.(Mean Sea Level). However, in case of West and South sea which are largely different between the rise and fall of the tide, the earth work can be performed on the ground while the work surface is exposed above the sea according to the tide cycle. Thus, it may a good substitute to make up for shortcomings of underwater construction works such as safety problems of workers, loss of efficiency and increasement of construction costs. But the difference between the height of the rock excavation surface and the water surface changed by the tide makes the exposure time of work surface, that is the possible working hours be changed. Also, it may cause the changes of construction cost. Thus, this study analyzes the economical efficiency of the construction method using the difference between the rise and fall of the tide in comparison with the construction method which is performed under the sea, and it also suggests the way to analyze the economical working hours by estimating the possible working hours on the ground. We also try to find out the application possibility of the way like the rock excavation work on the sea using the difference between rise and fall of the tide.

ZigBee Wireless Sensor Nodes and Network For Wind Turbine Condition Monitoring (풍력발전기 상태 모니터링을 위한 ZigBee 무선 센서노드 및 네트워크)

  • Kim, Hyeon-Ho;Ahn, Sung-Bum;Choi, Sang-Jin;Pan, Jae-Kyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4186-4192
    • /
    • 2012
  • Because wind turbines are larger and more off-shore construction due to economic and environmental factors, it is more difficult to access the wind turbine as well as the necessary parts and the maintenance costs are increasing. So, we need to minimize fault elements and to prevent a secondary accident at failure through monitoring to reduce maintenance costs and to increase reliability of operation. In this paper we have implemented ZigBee based wireless sensor nodes and network for wind turbine condition monitoring using temperature, humidity, voltage, current, wind direction, and wind speed sensors. ZigBee wireless sensor nodes signals are transmitted to a central monitoring system via routers. Also, the sensor signals are collected and processed using LabVIEW program to monitor the wind turbine conveniently. The administrators and users can monitor the condition of wind turbine at remote site in real time over TCP/IP.

Improvement of Compensation System in Construction Projects in Response to the Incurrence of Financial Costs (건설공사의 금융비용발생과 배상구조의 개선방안)

  • Lee Kyung-Kook;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.23-30
    • /
    • 2001
  • The Financial Cost in construction industry today is tend to increasing the burden of business management on account of lowered profit due to the mege-competition and decreasing investment of construction, multi-interfacing. system in it's attribute and various unreasonable governeing enactments. It is becoming the most important aspects for the management of construction business on how to preserve the profit from the various risks. The ultimate aims of this study is to pursue the contractual equity between the parties by establishing the fundamentals of framework for the compensation of Financial Charges through the review of the precedent studies and analysis of inquiries. As a result of the study, improvable measures for any practical inequality and/or institutional defects of current public contract system in recovering the Financial Cost incurred to Contractor are delivered as below; (1) $\lceil$Working Rules for Construction Industry Accounting Standards$\rfloor$ shall be amended and supplemented so as the incurred interest to be recognized as an operative cost by live return over the collection period. (2) The long-term phase contract system of which is enforcing contractor to bear the certain losses shall be diminished and/or abolished gradually. (3) The unreasonable legislations on compensation for financial cost in contract conditions shall be improved in response to practical circumstances. (4) The use of Critical-Path Method for Time Management shall be activated together with EVMS. (5) Independent application of Contract Enactments for construction industry shall be adopted.

  • PDF

Pi Logger : Low-cost Greenhouse Image and Environmental Data Collection System for Invigorating Smart Farm Propagation (Pi Logger : 스마트 팜 보급 확대를 위한 저가형 온실 영상 및 환경 데이터 수집 시스템)

  • Seong, Gi-Cheon;Kim, Young-Geun;Yang, Won-Mo;Kim, Won-Jung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.11
    • /
    • pp.1121-1128
    • /
    • 2016
  • Our country of agriculture suffers problems such as aging, population decline, agricultural decline etc. To solve this problem, in the country, it is interest in Smart Farm System, a convenient and efficient system for the production through the convergence of ICT technology and agriculture. However, because of expensive construction costs and difficulty in securing human resources and training for Operating system, they are struggling to spread the actual farmers. Therefore, it is necessary to develop smart farm techniques suitable for such customized domestic environment. This study designed a system for collecting environment date in a greenhouse based on the low-cost embedded devices, and designed and implemented for the Web application that a user can easily use system. The implementation of the system lowers deployment costs and is expected to increase largely the spread of Smart Farm it can be easily accessed by using the smart phone.

Utilization Evaluation of Digital Surface Model by UAV for Reconnaissance Survey of Construction Project (건설공사 현황측량을 위한 UAV DSM의 활용성 평가)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.155-160
    • /
    • 2018
  • The unmanned aerial vehicle (UAV) is used in various fields, such as land surveying, facility management, and disaster monitoring and restoration because it has low operational costs, fast data acquisition, and can generate a digital surface model (DSM). Recently, the UAV has been applied to process management in construction projects. Construction projects are widely distributed not only in urban areas but also in mountainous areas and rural areas where people are rarely in traffic or in vehicles. Projects range from a few hundred meters to several kilometers long. In order to perform a reconnaissance survey, a surveying method using a global positioning system (GPS) or a total station has mainly been used. However, these methods have a disadvantage in that a lot of time is required for data acquisition. This study's purpose is to evaluate the usability of a UAV DSM for surveying a construction area. Data was acquired using the UAV and a three-dimensional (3D) laser scanner, and the DSM of the construction site was created through data processing. The UAV DSM showed accuracy to within 30 cm based on the 3D laser scanner data, and a process comparison between the two work methods was able to present the usability of the UAV DSM in the field of construction surveying. Future utilization of the UAV DSM is expected to greatly improve the efficiency of work in construction projects.

The effects of Design Initial Condition on Renewal of Railway Existing Curves (철도 평면선형 개량시 설계초기조건이 미치는 영향)

  • Um, Ju-Hwan;Choi, Il-Yoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2906-2910
    • /
    • 2015
  • The alignment modifications after completion of railway construction entail a lot of efforts and time as well as high additional costs. In the process of renewal of the existing railway alignment to offer higher-speed services, the effect of initial design parameters(e.g., intersection angle) on determination of allowable degree of improvement of horizontal curves under consideration of economic efficiency is investigated in this study. From the analysis results, in the case that there are obstacles at the tangent line, it was found that the larger angle of intersection has a significant effect on the permissible zone. In addition, as the intersection angle is increased, the permissible values of maximum curve radius and the length of transition curve becomes smaller and longer, respectively. It is expected that this study can contribute to the efficient and accurate prediction of the permissible zone according to the locations of obstacles and the size of intersection angle as well as improvement in the railway alignment without any additional costs.

Performance Evaluation for All-In-One Construction Method of Curbstone and Gutter Using Formwork Rail and Jig (거푸집 레일과 지그를 이용한 경계석 및 측구의 일체형 시공법에 대한 성능평가)

  • Choi, Jae-Jin;Ko, Man-Gi;Kim, Kyoung-Ju;Choi, Khyung-Dong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6A
    • /
    • pp.525-534
    • /
    • 2010
  • A road curbstone is a structure installed at the boundary of the sidewalk and the street with the objectives of road drainage, drawing attention and such. The current general construction method of curbstones places foundation concrete for the curbstones first, waits until the concrete reaches the strength to support the curbstones, places the curbstones on top, and then places the gutter and rear filling concrete. Such method has the issues of poor compaction and weakened bond strength of concrete due to split placing of concrete, and causes the curbstones to easily separate due to vehicle impact or earth pressure, in turn creating maintenance costs and spoiling the aesthetics. To improve such conventional construction methods, an all-in-one method was developed using formwork rail and jig where both the curbstones and gutter can be worked at the same time, and to evaluate the structural performance, static tests of lateral loading test, pullout test, and bending test were executed, and dynamic tests such as pendulum test and actual vehicle impact test were executed. In all tests, the all-in-one construction method using formwork rail and jig was shown to be superior to the conventional construction method by the increase of construction quality and bond strength of concrete.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.