International conference on construction engineering and project management
/
2022.06a
/
pp.145-152
/
2022
Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.
Korean Journal of Construction Engineering and Management
/
v.25
no.5
/
pp.41-54
/
2024
In this study, we compare and analyze the performance of three inventory management policies for raw material inventory management in a Precast Concrete production plant: Fixed Order Quantity Policy (FOQP), Fixed Order Interval Policy (FOIP), and (s, S) Ordering Policy (sSOP). In order to make more realistic conclusion, we developed and utilized the ARENA simulation model, a performance evaluation tool that considers the variance of raw material demand and supply for the entire production process in a PC production plant using multiple raw materials. For the three policies, reorder point, order quantity, target level, and order interval parameters were initialized by using Economic Order Quantity (EOQ) model and then optimized through OptQuest. As a result of optimization, inventory management costs were reduced by an average of 97.28% compared to the EOQ model that does not consider the variance of demand and supply. After setting three influencing factors, Project Occurrence Cycle (POC), Raw Material Lead-time (RML), and Unit Stock-out Cost (USC), a performance evaluation was conducted for the three policies. As a result of evaluation, the inventory management costs of FOQP and sSOP, which determine order intervals by considering inventory levels by real-time or daily, were 30.6% and 27.9% lower than FOIP with fixed order intervals respectively. In addition, inventory management costs were affected by RML and USC factors excluding POC, but the differences were 2.17% and 2.09% respectively, which were not large due to the optimization of parameters for responding the variance of raw material demand and supply.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.13-19
/
2004
In most PFI(Private Finance Initiative) projects in Korea, the project management are in charge of the Special Purpose Company(SPC) established for carrying out the project. This paper is a case study about an owner CM executed by the organizations and staffs of SPC itself. : Seoulbeltway (Ilsan $\~$ Toegaewon) Private Investment Project. In time management area, the SfC was the leader of project management throughout the life circle - plan, design, permit, construction, operation and maintenance - beyond the schedule manager's role. In cost management area, the methods of reducing the total costs by VE, new technologies, etc. has been needed assuming the construction risks were subject to SPC.
Proceedings of the Korea Concrete Institute Conference
/
2004.05a
/
pp.400-403
/
2004
In conventional methods, the availability of floating crane has determined the size of a concrete caisson. However, this paper introduces a new method for larger caisson production that make it possible to complete caisson fabrication and launch out without use of floating crane. The new method carries out multi-step fabrication of caisson and horizontal transfer of caisson on a single casting bed which consists of collapsible soffit form, trough, aero go watercaster system or low frictional PTFE added jacking system, half-submergible floating dock. To make the new method successfully launched, the static and dynamic analysis is carried out to obtain the stability of caisson launching and experimental research is conducted in evaluating friction occurred between PTFE pad and steel track. Lastly, the comparison of the new method and the conventional method are detailed. With significant benefits in construction costs reduction and construction time reduction, this new method in this paper would be recommended for extensive application in large port and harbor construction projects.
PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.
Korean Journal of Construction Engineering and Management
/
v.5
no.6
s.22
/
pp.72-79
/
2004
Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,
As a result of the policy for enforcing the information technology led by government and the effort of companies to get over economic crisis through the reformation of business process, the ERP market is being active. However, because imported ERP products that are supplied currently are designed for standard and rationality, they have a limit to support custom processes of domestic companies in South Korea. On the contrary, ERP products by domestic companies in South Korea are unable to support a consistent methodology of constructing ERP system. This is main reason why much time and costs are consumed than that of an original plan. To succeed in ERP construction, the purpose of ERP setup must be defined. To accomplish this end, it is required to analysis business process completely and to make a plan in detail. For ERP providers, they must support a characterized ERP construction methodology and lower the construction cost by improving an ERP package easy to customize[5].
The building HVAC systems have very different qualities of performance and durability with the superintendent's ability for management and maintenance. The poor management of these systems finally lead to the shortening of the life expectancy and result in the increase of operating costs and energy consumptions due to low efficiencies. So it is essential to try to develop ways to adequately maintain and to use the building facilities efficiently in order to preserve earth environment and the limited resource. In this study, the LCC based numerical calculation package will be developed for the efficient maintenance plan and the determination of the reasonable time of repair or replacement of equipments.
Proceedings of the Korean Institute of Building Construction Conference
/
2001.11a
/
pp.76-81
/
2001
Recently, the structure is higher and larger, so that the application of high-strength concrete is increased, And as the development of construction skills, it is possible to place during the winter. Concrete work during winter is indispensible to shorten time of completion and cut costs. When concrete work during winter is placed, it has anxiety that concrete freeze at low temperature. As repetition of concrete's freezing cause reduction of durability, it is necessary for mixing to pay attention to air content and W/C ratios. Accordingly, in this study, we estimate the frost resistance by air content and W/C ratios, and development of strength after early-frost damage in the high-strength concrete during the cold weather. In this study, it could be confirmed that factors which were air content, W/C ratios and early curing period, affected on the frost resistance.
Continuous research efforts have been made on acquiring location data on construction sites. As a result, GPS and RFID are increasingly employed on the site to track the location of equipment and materials. However, these systems are based on radio frequency technologies which require attaching tags on every target entity. Implementing the systems incurs time and costs for attaching/detaching/managing the tags or sensors. For this reason, efforts are currently being made to track construction entities using only cameras. Vision-based 3D tracking has been presented in a previous research work in which the location of construction manpower, vehicle, and materials were successfully tracked. However, the proposed system is still in its infancy and yet to be implemented on practical applications for two reasons. First, it does not involve entity matching across two views, and thus cannot be used for tracking multiple entities, simultaneously. Second, the use of a checker board in the camera calibration process entails a focus-related problem when the baseline is long and the target entities are located far from the cameras. This paper proposes a vision-based method to track multiple workers simultaneously. An entity matching procedure is added to acquire the matching pairs of the same entities across two views which is necessary for tracking multiple entities. Also, the proposed method simplified the calibration process by avoiding the use of a checkerboard, making it more adequate to the realistic deployment on construction sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.