• Title/Summary/Keyword: construction site control system

Search Result 208, Processing Time 0.087 seconds

A Study on Sites Application of Non-open-cut Tunnel Method with Slot Holes in Steel Pipe Pumping (강관압입후 슬롯 홀을 갖는 비개착 터널공법의 현장적용에 관한 연구)

  • Chae, Young-Suk;Song, Kwan-Kwon;Min, In-Ki
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.1
    • /
    • pp.47-51
    • /
    • 2015
  • In the study, a new non-open cut tunnel steel pipe method using slot hole has been developed. As is overcomes shortcomings of conventional methods, it is applied to the field. The main concept of the new method is the steel pipe pumping system with slot holes which, by means of formation slot holes between each steel pipe, applied to the magnitude of the relaxed earth pressure caused by excavation to the ground to prevent ground displacement. The stability of the support members and effect of displacement control of the new method were verified through several ways as numerical analysis and site test. The new method was applied to the construction of a 11.5m wide, 7.4m high and 50m long section that passes side subway and large buildings in inner city. By applying the new method, tunnel construction was successfully completed in 6 months. It decreases the construction period to 30% compared to that of conventional methods, and ground was almost negligible.

A Study of Evaluation Process and Chart of PPC considering Variation (변이를 고려한 PPC 평가절차 및 평가차트 제안)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.75-83
    • /
    • 2009
  • PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.

A Study on the Building Use Control of Seoul in District Units Plan (서울시 지구단위계획의 운용에 관한 연구)

  • Shim, Jae-Heon;Lee, Jae-Kook
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.4 no.2
    • /
    • pp.26-34
    • /
    • 2004
  • Our country did not illustrate and reverse by a city planning law department construction Buddhist priest's robe dual setup the urban setting to be regulated, it came. The city planning law as the high position system of space planning mainly provides the use and a size of the land, the construction law the detail contents of site undergarment concrete location and the form back is provided and of course, regarding the structure which relates with the designation of concrete building use in him and the immediacy back. These two laws are come by a trade name complement and a function sharing role in order for the affirmative development of the city to become accomplished, being used. To necessity of District unit plan the general causal government employee all it is sympathizing, it relates it goes to extremes and with the maintenance of endurance environment and many portion with charge Sikkim also the fact that it is the criticism which relativy is negative in duty of administrative origination is fact in the people. But realization of plan hazard the execution of the public section which stands will be important, it will reach and the public section execution plan of the autonomous nine dimension for must be prepared. The next research that the individual globe plan and development actual condition actual proof and the research which it analyzes system is necessary with base, sees the general operation evaluation of Seoul District unit plan.

  • PDF

Political consideration issues for the exclusive possession protection and localization of TETRA system in Korea (TETRA시스템의 국산화율 제고를 위한 정책적 접근방안)

  • Moon, Hun-Il;Hong, Wan-Pyo
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.3 no.4
    • /
    • pp.221-227
    • /
    • 2008
  • The integrated command radio network construction with the business which differs makes the business of the regional BCP responsible agencies which are being scattered and the emergency rescue agencies control effectively. The namely specific authorizations are quick, the decision-making and the solar radiation which are accurate the possibility the rescue work which is disordered becoming accomplished in order to be, integrated command network construction are demanded from misfortune site. Foe the maintenance and an efficient management of the function which is case different meaning permanent and continuous will construct the integrated command network the upgrade which system is continuous necessary, becomes.

  • PDF

Analysis and Design of Nuclear Spent Fuel Dry Storage System under Irregular Operation (사용후 핵연료 건식저장장치의 비정상 운영조건의 해석과 설계)

  • Song, Hyung-Soo;Min, Chang-Shik;Yoon, Dong-Yong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.381-384
    • /
    • 2004
  • Delaying and objection for the construction of storage spent-fuel disposal has prompted to consider expanding on-site storage of spent reactor fuel since it can eliminate the need for costly and difficult shipping and control of the spent fuel completely under the direction of the owner-utility. The dry storage unit developed in Canada can accommodate Korea heavy water reactor fuel elements and become a candidate for the Korean market. In this paper, finite element analyses were carried out in order to investigate the structural behavior of the nuclear spent fuel dry storage system, which is subjected to impact loads such as collision of a truck load and dropping of flask under the irregular operation.

  • PDF

Investigation on Level of Emergency Treatment Performance on Building Construction Sites in Jeju (제주지역 건설현장의 응급처치 대응수준에 대한 조사연구)

  • Kang, Soon-Min;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.211-219
    • /
    • 2012
  • On January 27, 2005, the central government of the Republic of Korea designated Jeju Island as an Island of World Peace based on Article 12 of the Special Act for the Jeju Free International City, and the WHO designated Safe Community Jeju in July, 2007. Whenever an industrial accident occurs on Jeju Island, reports in the media raise the question of whether Jeju is a safe city or not. But due to the characteristics of construction sites in Jeju, it is very difficult to employ workers of a certain level. For the safety of workers, it is also thought that owners should make a decisive investment to introduce an education and reward system in order to improve the consciousness level of workers. This research focuses on first-aid on construction sites. It then surveys the level of construction safety management, and suggests improvements in construction safety control and first-aid.

A Study on the Application of RTLS Technology for the Automation of Spray-Applied Fire Resistive Covering Work (뿜칠내화피복 작업 자동화시스템을 위한 RTLS 기술 적용에 관한 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.79-86
    • /
    • 2009
  • In a steel structure, spray-applied fire resistive materials are crucial in preventing structural strength from being weakened in the event of a fire. The quality control of such materials, however, is difficult for manual workers, who can frequently be in short supply. These skilled workers are also very likely to be exposed to environmental hazards. Problems with construction work such as this, which are specifically the difficulty of achieving quality control and the dangerous nature of the work itself, can be solved to some degree by the introduction of automated equipment. It is, however, very difficult to automate the work process, from operation to the selection of a location for the equipment, as the environment of a construction site has not yet been structured to accommodate automation. This is a fundamental study on the possibility of the automation of spray-applied fire resistive coating work. In this study, the linkability of the cutting-edge RTLS to an automation system is reviewed, and a scenario for the automation of spray-applied fire resistive coating work and system composition is presented. The system suggested in this study is still in a conceptual stage, and as such, there are many restrictions still to be resolved. Despite this fact, automation is expected to have good effectiveness in terms of preventing fire from spreading by maintaining a certain level of strength at a high temperature when a fire occurs, as it maintains the thickness of the fire-resistive coating at a specified level, and secures the integrity of the coating with the steel structure, thereby enhancing the fire-resistive performance. It also expected that if future research is conducted in this area in relation to a cutting-edge monitoring TRS, such as the ubiquitous sensor network (USN) and/or building information model (BIM), it will contribute to raising the level of construction automation in Korea, reducing costs through the systematic and efficient management of construction resources, shortening construction periods, and implementing more precise construction

Site-directed Immobilization of Antibody onto Solid Surfaces for the Construction of Immunochip

  • Paek, Se-Hwan;Cho, Il-Hoon;Paek, Eui-Hwan;Lee, Haewon;Park, Jeong-Woo
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • v.9 no.2
    • /
    • pp.112-117
    • /
    • 2004
  • The performance of an immuno-analytical system can be assessed in terms of its analytical sensitivity, i.e., the detection limit of an analyte, which is determined by the amount of analyte molecules bound to the capture antibody that has been immobilized onto a solid surface. To increase the number of the binding complexes, we have investigated a site-directed immobilization of an antibody that has the ability to resolve a current problem associated with a random arrangement of the insolubilized immunoglobulin. The binding molecules were chemically reduced to produce thiol groups that were limited at the hinge region, and then, the reduced products were coupled to biotin. This biotinylated antibody was bound to a streptavidin-coated surface via the streptavidin-biotin reaction. This method can control the orientation of the antibody molecules present on a solid surface and also can significantly reduce the possibility of steric hindrance in the antigen-antibody reactions. In a two-site immunoassay, the introduction of the site-directly immobilized antibody as the capture enhanced the sensitivity of analyte detection approximately 10 times compared to that of the antibody randomly coupled to biotin. Such a novel approach would offer a protocol of antibody immobilization in order for the possibility of constructing a high performance immunochip.

A Study on the Improvement of a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 개선에 관한 연구)

  • Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1063-1076
    • /
    • 2017
  • To improve the productivity of the earthwork, a fleet management system for construction equipment was suggested in previous studies. But there were some gaps between theory and practice. To overcome this problem, some opinions are gathered form experts and field engineers and four improvements have been proposed and reflected in the system. First, the previous system consists of one hardware module, so it is hard to install it at a control office and construction equipment at the same time. The server module for the office and the mobile module for construction equipment are separately developed. Second, the transportation algorithm that is used in the previous system can generate shortest paths for the earthwork distribution, but embankment areas are not gathered. This situation leads to a decrease in compaction productivity. A modified algorithm for earthwork distribution is suggested. Third, the automated coordinate transformation is performed to show the position of construction equipment on the 3D terrain in real-time. Fourth, construction equipment groups should be formed in the initial stage of earthwork and the number of equipment of each groups should be changed by operation status and site environment. But this functions did not work properly in the previous system. This problem is corrected in the proposed system. The improvements can make the proposed system much more realistic one and can leads to an increase in the productivity of earthwork operations.

Case Studies of a Performance-Based Contract for National Highway Pavement Maintenance (성능보증제도를 적용한 일반국도 유지보수공사 시범사업)

  • Lim, Jaekyu;Kim, Yongjoo;Kim, Myeongil;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2018
  • PURPOSES : Case studies of an asphalt-overlay project with a performance-based contract method were conducted on a national highway in Korea to evaluate the effect of the method on asphalt pavement maintenance. This study evaluated the procedure of the performance-based contract method. METHODS : In this study, an asphalt-pavement maintenance project for a national highway was assessed with a performance-based contract to investigate the advantage of the new contract procedures. This is the first trial applying the performance-based contract to a pavement-rehabilitation project in Korea. In the four case studies, the warranty period of the performance-based contract was designed for seven years. The research team monitored the construction site to compare the normal contract method with the performance-based contract method. The case studies' project sites were investigated after the end of the construction. RESULTS : Based on the limited case studies, the performance-based contract method could extend the service life of the asphalt pavement and reduce the pavement-maintenance budget because the quality control was well managed by the contractors. However, a few construction laws would be necessary to apply the performance-based contract method in the future. CONCLUSIONS : Using the performance-based contract, the construction company made great efforts to guarantee the warranty period and to apply the optimal maintenance method, based on the pavement distress condition. The contractor and the agency would need to understand the new performance-based contract system for it to be activated. Therefore, a proper education program for the performance-based contract system would be needed to educate the stakeholders regarding the procedures and their effects on the pavement management and maintenance.