• Title/Summary/Keyword: construction sequence

Search Result 586, Processing Time 0.029 seconds

Construction Sequence Analysis for Checking Stability in High-Rise Building under Construction (초고층 건물의 시공 중 안정성 검토를 위한 시공단계해석)

  • Kim, Jae-Yo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.618-623
    • /
    • 2008
  • Due to recent trends of the atypical plan shapes and the zoning construction in high-rise buildings, the building stability under construction is arising as an important issue for design and construction plan. To ensure the stability under construction, the differential column shortening and the lateral movements with unbalanced distributions of self-weight of structure members and the load flows before completion of member connections and lateral load resisting system should be checked by construction sequence analysis. This paper presents the scheme of zone-based construction sequence analysis, to check the stability of high-rise building under construction. This scheme is applied to the construction sequence analysis for real high-rise building under construction.

  • PDF

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

Construction Method of Binary Low Correlation Zone Sequence Set Using Gray Mapping (Gray 사상을 이용한 이진 낮은 상관구역 수열군의 생성법)

  • Jang, Ji-Woong;Kim, Young-Sik;Lim, Dae-Woon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.2C
    • /
    • pp.169-174
    • /
    • 2009
  • In this paper, we propose a new construction method of binary low correlation zone (LCZ) sequence set. New construction method applies Gray mapping to conventional quaternary LCZ sequence set that has specific property. The period of new binary sequence set is twice as that of used sequence set in construction, and maximum magnitude of correlation value within the LCZ and cardinality of new set is also twice as those of used quaternary sequence set. But the LCZ size is the same with that of used sequence set. If the used Quaternary sequence set is optimal, the constructed binary sequence set is optimal with high probability.

Structure and Construction Technology Analysis about Construction Sequence Change for Superstructure Construction Period Reduction in Top-down Method (역타공법 중심의 골조 공기단축을 위한 시공시퀀스 변경에 따른 구조해석 및 요소기술 분석)

  • Park, Yong-Hyeon;Ju, Young-Kyu
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.101-109
    • /
    • 2019
  • The purpose of this study is to improve a general Top-Down construction process for superstructure construction period reduction. In a general Top-Down construction sequence, the ground floor slab is set up first. Subsequently, 1st basement level construction including core walls is constructed. Initiation of the ground level superstructure gets waited until then. In this study, removable deck plate installation on the bottom of the core walls of ground level is preceding the concrete casting, therefore, ground level superstructure construction is able to get started earlier. Up to first typical floor concrete casting, total of seventy-two working(calendar) days will be resulted in a reduction from the total construction periods.

Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction (초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델)

  • Nam, Chulu;Kwon, Jaebeom;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

A New Construction of Quaternary LCZ Sequence Set Using Binary LCZ Sequence Set (이진 낮은 상관 구역 수열군을 이용한 새로운 4진 낮은 상관 수열군의 생성법)

  • Jang, Ji-Woong;Kim, Sang-Hyo;Lim, Dae-Woon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.1C
    • /
    • pp.9-14
    • /
    • 2009
  • In this paper, using the binary (N,M,L,1) low correlation zone(LCZ) sequence set with specific property, we propose the construction method of a quaternary LCZ sequence set with parameters (2N,2M,L,2). The binary LCZ sequence using this method must have period $N{\equiv}3$ mod 4, balance property, and specific correlation property. The proposed method is modified from the construction method of binary LCZ sequence set by using binary LCZ sequence with specific condition proposed by Kim, Jang, No, and Chung[4].

New Construction of Quaternary Low Correlation Zone Sequence Sets from Binary Low Correlation Zone Sequence Sets

  • Jang, Ji-Woong;Kim, Sang-Hyo;No, Jong-Seon
    • Journal of Communications and Networks
    • /
    • v.12 no.4
    • /
    • pp.330-333
    • /
    • 2010
  • In this paper, using binary (N, M, L, $\epsilon$) low correlation zone (LCZ) sequence sets, we construct new quaternary LCZ sequence sets with parameters (2N, 2M, L, $2{\epsilon}$). Binary LCZ sequences for the construction should have period $N\;{\equiv}\;3$ mod 4, L|N, and the balance property. The proposed method corresponds to a quaternary extension of the extended construction of binary LCZ sequence sets proposed by Kim, Jang, No, and Chung [1].

A New Construction Method of Quaternary LCZ Sequence Set (4진 낮은 상관 구역 수열군의 새로운 생성법)

  • Jang, Ji-Woong;Kim, Young-Sik;Lim, Dae-Woon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.2C
    • /
    • pp.153-157
    • /
    • 2009
  • In this paper, for even integer N, we propose a new construction method of quaternary low correlation zone(LCZ) sequence set from a binary LCZ sequence set with parameters (N,M,L,$\varepsilon$). Proposed method applies the inverse gray mapping from Krone and Sarwate to binary LCZ sequences and their phase shifts. The only needed condition of binary LCZ sequence set used in this construction is even period.

Behavior of Mechanically Stabilized Earth Retaining Walls with Different Construction Sequence (시공과정에 따른 보강토 옹벽의 거동 특성)

  • 유충식;이광문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.473-480
    • /
    • 1999
  • This paper presents the results of a parametric study on the behavior of mechanically stabilized earth retaining wall. It has been recognized that the currently available design guidelines, which is base on the limit equilibrium approach, cannot properly account the interaction effect between the components, construction sequence, and foundation settlement which may impose a significant influence on the wall behavior. A parametric study using finite element analysis was performed to investigate the behavior of MSE wall under different construction conditions and the applicability of the current design approach. In the parametric analysis, the effects of the construction sequence, the surcharge, and the foundation stiffness were studied and a detailed finite element modeling for various components of the system were employed. The results, such as wall displacement and earth pressure distributions, reinforcement forces, vertical stress distribution were then thoroughly analyzed to investigate the effect of construction details on the wall behavior.

  • PDF