• Title/Summary/Keyword: construction project owner

Search Result 240, Processing Time 0.028 seconds

Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project (공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로)

  • Ji, Sae-Hyun;Park, Moon-Seo;Lee, Hyun-Soo;Seong, Ki-Hoon;Yoon, You-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.235-243
    • /
    • 2008
  • Construction projects have unique characteristics that these may be carried out by contractors thus, cost should be estimated before execution. The importance of cost estimation and cost check has become increasingly emphasized in all phases of construction project that would be performed numerously. It is needed that owner have to estimate reasonable budget, and contractor should predict the bid price. However, there are lack of standard cost estimation method before quantity takeoff, cost analysis method, and cost database thus, the method of area cost, such as square foot method, is as used as ever in Korea. Therefore, this research suggested standard cost database structure CUBE, and analysis method of item quantity per one household categorized by area type. Whereafter, database of all item quantity of finish work has been built with 90 building cost data, and validated it's availability. In this respect, the suggested method and the findings from this research are expected to help enhancing the efficiency and productivity of cost estimation in Korea.

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

Estimation Method of Waste Amount from Materials to Develop Generation Rates of Construction Waste in New Apartment Construction Sites: Focused on Bill of Quantities for Architectural Works (신축아파트 현장의 건설폐기물 발생원단위 개발을 위한 자재별 폐기물 수량 예측 방법: 건축공사 내역서의 투입 물량을 중심으로)

  • Jung, Jong-Suk;Song, Sang-Hoon;Park, Seong-Sik;Lee, Seok-Je
    • Land and Housing Review
    • /
    • v.5 no.1
    • /
    • pp.41-51
    • /
    • 2014
  • The amount of new apartment construction has been trending upward in 3~4% each year since 11% increase in 2002. Currently, in public apartment construction sites under separate delivery system for construction waste processing, the significant difference between estimated quantity for contract and actual amount frequently causes severe controversy among project participants. Many factors such as poor environmental management, inadequate contractual amount are assumed to influence the above problem, and the requirement to revise existing generation rates, the key criteria applied in estimating the quantities of waste, is increasing. Most of generation rates were established in early 2000's, and have difficulty in reflecting the changes from new materials and technologies accordingly. Therefore, this study aims to clarify the types of construction waste for each trade and the forecast method as preliminary work in order to develop more accurate generation rates for construction waste in new construction. To achieve this purpose, the architectural bills of quantities in ten apartment projects executed during 2010~2013 were collected, and the possible waste types and reasonable material loss ratio for each item from temporary works to owner-supplying material area were defined and compared through the workshops and interviews with the experts and on-site environmental managers. The results of this study will contribute to establishing the categories of construction waste for construction trades and proper generation rates by the indirect estimation method in new apartment construction in the follow-up study.

A Study for cost of road traffic accident taken offender's PTSD in consideration (교통사고 가해자의 외상 후 스트레스 장애를 고려한 도로교통사고 비용 연구)

  • Jang, Seok-Yong;Jeong, Heon-Yeong;Go, Sang-Seon
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.5
    • /
    • pp.17-29
    • /
    • 2010
  • The main objective of this study is to consider the necessity of introducing owner expenses in estimating the cost of traffic accidents, as is done in some advanced countries. It is known as "owner cost" in the U.S, "enterprise project price" in Japan, and "human cost" in the U.K. To achieve this, the seriousness and present state of post-traumatic stress disorder (PTSD) of traffic accident offenders, which is generally not observed when traffic accidents occur, are evaluated; countermeasures reflecting personal characteristics are prepared according to degree of affliction. The results could be summarized as follows. First, the present condition and seriousness of PTSD from traffic accidents that has been estimated only within the accidents offenders are evaluated through a survey. Second, a distinction analysis model is developed. 'Insomnia caused by accidents' and 'mental daunting in accident situations or similar ones during driving' are chosen as the variables of the discriminant. Third, as a result of the construction of an Ordered Probit Model to comprehend the seriousness of PTSD, the variables turns out in the order of 'seriousness of the most damaged victim, 'nightmare about the accident', 'insomnia experience', 'mental daunting during driving', 'gender', and 'major driving area'. Finally, the cures reflecting characteristics of gender and region are suggested, which are preferred for degree of seriousness of PTSD. The analysis shows that the method to minimize the damage, such as decline of work efficiency, by moving ahead the rehabilitation of the offenders would be suggested and this could minimize the direct and indirect damages that could happen to business owners for whom the drivers work.

Web-site Management and Utilization Strategies for Family Farm Businesses (농촌형 가정기업의 웹사이트 관리실태와 활성화를 위한 제언)

  • Koh Sun- Kang;Jin Kyung-A
    • Journal of Family Resource Management and Policy Review
    • /
    • v.9 no.1
    • /
    • pp.131-146
    • /
    • 2005
  • The farming type in Korea is predominantly a small farm managed by family members. This study mainly examines the current usage of the website of family farms as a management tool for small farm business and discusses the strategies for effective utilization of the website. A county that currently employs governmental project of information system was purposely selected. Among all the websites operated by small farm businesses in that county, websites of which purpose is introduction of the business, advertisement, or e-business were included for analysis; it yielded total seven websites, The study was conducted with two phases; on-line website analysis and interview with business owners. The websites were analyzed based on four categories; content, interface, design, and site management. With regard to the content of the websites, the lack of connection between domain names and product names was found. Moreover, the problem relevant to site management was shown as low utilization of bulletin boards and delayed upload of new information. However, design and interface were comparatively well presented. Business owners reported that the motivation to initiate the websites was mostly supports from the governmental project for the agricultural information system. The barriers to effective management of websites were found i) business owner's misinterpretation of business website with e-business ii) very limited opportunity for website management education in small farm business, and iii) lack of regional infrastructure for information system. Based on the findings, this study suggests as followed; i) construction of infrastructure should be preceded to make effective management for websites; ii) education for website management should include small business management strategies as well as computer skills, iii) the education should be provided in diverse ways considering subject's characteristics iv) small farm business owners should be informed that their websites could play a role only to provide information about the products and hand over the practical load for e-business to retailing web sites such as portal shopping mall; and v) wives' participation should be encouraged.

  • PDF

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.

Development of Risk Evaluation Checklist for In-Situ Production of Precast Concrete Members (기성콘크리트 부재의 현장생산 리스크 평가를 위한 체크리스트 개발)

  • Lim, Jeeyoung;Jeong, Hee Woong;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.445-457
    • /
    • 2021
  • In previous studies, it was confirmed that through the in-situ production of precast concrete members, costs could be reduced by 14.5-39.4% compared to in-plant production. In particular, it was confirmed that the factory owner did not make a contract if it did not earn more than 20% of the production cost. If precast concrete members are produced in-situ under the same conditions, the quality equivalent to that of factory production can be secured. As it is advantageous in terms of cost and quality, precast concrete members must be produced in-situ. However, it is difficult to produce all quantities in-situ due to time and various other constraints. This is because in-situ production is avoided due to anticipated risks during the project management process. However, if the risk factors are analyzed before performing in-situ production of precast concrete members, it will increase the opportunity for in-situ production. Therefore, this study develops a checklist for evaluating the risk of in-situ production of precast concrete members. By applying the checklist to one case site, it was verified that risk factors can be evaluated easily and quickly. As a result, it was analyzed that sites with a high building coverage ratio are classified as high-risk sites because it is difficult to secure usable area for production and storage. The developed checklist efficiently evaluates the risk factors of in-site production, and makes it possible for the operator to determine the risk factors, which can change frequently during project execution, and respond according to the situation.

PARKING GUIDE AND MANAGEMENT SYSTEM WITH RFID AND WIRELESS SENSOR NETWORK

  • Gue Hun Kim;Seung Yong Lee;Joong Hyun Choi;Youngmi Kwon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1278-1282
    • /
    • 2009
  • In apartment type of housing, if resident's vehicle is registered in central control office and RFID TAG is issued, identification can be recognized from the time of entrance into parking lot and intelligent parking guide system can be activated based on the residents' profile. Parking Guide System leads a vehicle to the available parking space which is closest to the entrance gate of the vehicle's owner. And when residents forget where they parked their cars, they can query to the Parking Guide and Management System and get responses about the location. For the correct operation of this system, it is necessary to find out where the residents' cars have parked in real time and which lot is available for parking of other cars. RFID is very fancy solution for this system. RFID reader gathers the ID information in RFID TAGs in parked cars and updates the DB up to date. But, when non-residents' cars are parked inside apartment, RFID reader cannot identify them nor know the exact empty/occupied status of parking spaces because they don't react to RFID reader's query. So for the exact detection of empty/occupied status, we suggest the combined use of ultrasonic sensors and RFID. We designed a tree topology with intermediate data aggregators. The depth of tree is normally more than 3 from root (central office) to leaves (individual parking lots). The depth of 2 in tree topology brings about the bottleneck in communication and maintenance. We also designed the information fields used in RFID networks and Sensor Networks.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives