• Title/Summary/Keyword: construction project management capacity

Search Result 87, Processing Time 0.028 seconds

Critical Success Factors of Public and Private Partnership Projects in Domestic Smart Cities Focusing on the Leading District Projects of the National Pilot Smart Cities (국내 스마트시티 민관합동사업 핵심성공요인 도출 - 국가시범도시 선도지구 발주사업을 중심으로 -)

  • Hyun, Kilyong;Wang, Jihwan;Jin, Chengquan;Lee, Sanghoon;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.116-127
    • /
    • 2022
  • Recently, the smart city market based on the 4th industrial revolution is rapidly expanding worldwide and is being promoted in various ways. Korea has promoted various smart city public and private partnership projects, but there were limits to the activation of smart city public and private partnership projects due to insufficient enactment and revision of laws, public-oriented ordering method, and lack of private execution capacity. Therefore, this study intends to suggest key success factors for each stage of smart city public and private partnership projects through the analysis of the order status of the smart city national pilot city and the analysis of previous research. Through this, it is expected that it will be possible to eliminate various types of risks that may occur in the domestic smart city public and private partnership projects and contribute to revitalizing the smart city public and private partnership projects.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

A Study of the Application of 'Digital Heritage ODA' - Focusing on the Myanmar cultural heritage management system - (디지털 문화유산 ODA 적용에 관한 시론적 연구 -미얀마 문화유산 관리시스템을 중심으로-)

  • Jeong, Seongmi
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.4
    • /
    • pp.198-215
    • /
    • 2020
  • Official development assistance refers to assistance provided by governments and other public institutions in donor countries, aimed at promoting economic development and social welfare in developing countries. The purpose of this research is to examine the construction process of the "Myanmar Cultural Heritage Management System" that is underway as part of the ODA project to strengthen cultural and artistic capabilities and analyze the achievements and challenges of the Digital Cultural Heritage ODA. The digital cultural heritage management system is intended to achieve the permanent preservation and sustainable utilization of tangible and intangible cultural heritage materials. Cultural heritage can be stored in digital archives, newly approached using computer analysis technology, and information can be used in multiple dimensions. First, the Digital Cultural Heritage ODA was able to permanently preserve cultural heritage content that urgently needed digitalization by overcoming and documenting the "risk" associated with cultural heritage under threat of being extinguished, damaged, degraded, or distorted in Myanmar. Second, information on Myanmar's cultural heritage can be systematically managed and used in many ways through linkages between materials. Third, cultural maps can be implemented that are based on accurate geographical location information as to where cultural heritage is located or inherited. Various items of cultural heritage were collectively and intensively visualized to maximize utility and convenience for academic, policy, and practical purposes. Fourth, we were able to overcome the one-sided limitations of cultural ODA in relations between donor and recipient countries. Fifth, the capacity building program run by officials in charge of the beneficiary country, which could be the most important form of sustainable development in the cultural ODA, was operated together. Sixth, there is an implication that it is an ODA that can be relatively smooth and non-face-to-face in nature, without requiring the movement of manpower between countries during the current global pandemic. However, the following tasks remain to be solved through active discussion and deliberation in the future. First, the content of the data uploaded to the system should be verified. Second, to preserve digital cultural heritage, it must be protected from various threats. For example, it is necessary to train local experts to prepare for errors caused by computer viruses, stored data, or operating systems. Third, due to the nature of the rapidly changing environment of computer technology, measures should also be discussed to address the problems that tend to follow when new versions and programs are developed after the end of the ODA project, or when developers have not continued to manage their programs. Fourth, since the classification system criteria and decisions regarding whether the data will be disclosed or not are set according to Myanmar's political judgment, it is necessary to let the beneficiary country understand the ultimate purpose of the cultural ODA project.

A Study On Irrigation Water Price Structure and Prescription (농업용수의 가격구조에 관한 연구)

  • 심기영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.15 no.4
    • /
    • pp.3170-3180
    • /
    • 1973
  • This study of the subject will review past and present irrigation development in Korea. Particular attention will be given to water pricing structure and a case study on the purpose of rational operation and management of irrigation water and organizations, and the optimum irrigation water and organizations, and the optimum irrigation water fee inorder to reduce farmers burden and to rationalize the farmland associations management so as to achieve development of the rural environment. In 1971, the reservoir of the Farmland Improvement A sociation (FIA) produced only 775 millison $m^3$ of irrigation water or 77% of planned capacity of 1,015 million $m^3$. It was caused by inefficient maintenance of irrigation facilities; for instance, about 21% of reservoirs, pumping stations and weirs in Korea have been silted by soil erosion which hinder to water production according to an ADC survey. The first Irritation Association was established in 1906, whcih was renamed the Farmland Assoeiation by the Rural Development Enouragement Law in 1970. By the end of 1971, 411,000 ha of rice paddies were under the control of 267 associations nationwide. The average water price assessed by Associations nationwide rose from 790 won per 0.1 ha. in 1966 to 1,886 won in 1971. The annual growth rate was 20%. The highest water price in 1971 was 4,773 won her 0.1 ha. and the lowest was 437 won. This range was caused by differences in debt burden, geographic conditions and management efficiency among the Associations. In 1971, the number of Associations which exceeded the average water price of 1,886 won per 0.1 ha. was 144, or 55.1% of all Association. In determination of water price, there are two principles; one is determined by production cost such as installation cost of irrigation facilities, maintenance cost, management cost and depreciation ect. For instance, the Yong San River Development project was required 33.7 billion won for total construction and maintenance cost is 3.1 billion won for repayment, maintenance and management cost per year. The project produces 590 million $m^3$ of irrigation water annually. Accordingly, the water price per $m^3$ is 5.25 won. The other principle is determined by water value in the crop products and in compared with production of irrigated paddy and non-irrigated paddy. By using this method, water value in compared with paddy rice vs. upland rice(Average of 1967-1971) was 14.15 won per $m^3$ and irrigated paddy vs. non-irrigated paddy was 2.98 won per $m^3$. In contrast the irrigation fee in average association of 1967-1971 was 1.54 won per $m^3$. Accordingly, the current national average irrigation fee(water price) is resonable compared with its water value. In this study, it is found that the ceiling of water price in terms of water value is 2.98 won per $m^3$ or 2,530 won per 0.1 ha. However, in 1971 55% of the associations were above the average of nationwide irrigation fees. which shows the need for rationalization of the Association's management. In connection with rationalization of the Association's management, this study recommends the following matters. (1) Irrigation fee must be assessed according to the amount of water consumption taking intoaccount the farmer's ability. (2) Irrigation fee should be graded according to behefits and crop patterns. (3) Training personnel in the operation and procedures of water management to save O&M costs. (4) Insolvent farmland association should be integrated into larger, sound associations in the same GUN in order to reduce farmers' water cost. (5) The maintenance and repair of existing irrigation facilities is as important as expansion of facilities. (6) Establishment of a new Union of Farmland Association is required to promoted proper maintenance and to protect the huge investment in irrigation facilities by means of technical supervision and guidance.

  • PDF

Investigation for Bed Stabilization Methods in the Upstream Channel of Haman Weir Using CCHE2D Model (CCHE2D 모형을 이용한 함안보 상류 하상안정화 방안 검토)

  • Jang, Eun Kyung;Ji, Un;Kwon, Yong Sung;Yeo, Woon Kwang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2211-2221
    • /
    • 2013
  • During the four river restoration project, several weirs were constructed in the four rivers to prevent drought and flood, to improve water quality, and to manage water resources. However, due to the weir construction, bed changes are produced in the upstream channel of installed weirs because the incoming flow velocity is reduced and sediment transport capacity is also lowered. Especially, since the Haman Weir is located in the lowest downstream section among newly installed weirs in Nakdong River, bed change and sedimentation problems are expected due to the mild slope and reduced velocity. Therefore, numerical simulation was performed to analyze flow and bed changes in the upstream channel of Haman Weir and to evaluate quantitatively sediment control methods for bed stabilization using CCHE2D model. As a result of flow and bed change simulation after installation of Haman Weir, the flow velocity at the initial condition was faster than the final bed condition with the specific simulation time and it was represented that the locations where bed changes were great were identical for all modeling conditions of flow discharge. In case of 4.5 m of water level lowered from 5.0 m of the management water level at Haman Weir for bed stabilization, the flow velocity was generally faster than the case of the management water level and the continuous erosion was developed at the most narrow channel section as the applied discharge and simulation period were increased. The channel width extension at the most narrow channel section was proposed in this study to prevent and stabilize continuos bed erosion. As a result of numerical analysis, there was no bed erosion after channel width extension and it was presented that the channel geometry extension was effective for bed stabilization at Haman Weir.

MAGIC: GALILEO and SBAS Services in a Nutshell

  • Zarraoa, N.;Tajdine, A.;Caro, J.;Alcantarilla, I.;Porras, D.
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.27-31
    • /
    • 2006
  • GNSS Services and Applications are today in permanent evolution in all the market sectors. This evolution comprises: ${\bullet}$ New constellations and systems, being GALILEO probably the most relevant example, but not the only one, as other regions of the world also dwell into developing their own elements (e.g. the Chinese Beidou system). ${\bullet}$ Modernisation of existing systems, as is the case of GPS and GLONASS ${\bullet}$ New Augmentation services, WAAS, EGNOS, MSAS, GRAS, GAGAN, and many initiatives from other regions of the world ${\bullet}$ Safety of Life services based on the provision of integrity and reliability of the navigation solutions through SBAS and GBAS systems, for aeronautical or maritime applications ${\bullet}$ New Professional applications, based on the unprecedented accuracies and integrity of the positioning and timing solutions of the new navigation systems with examples in science (geodesy, geophysics), Civil engineering (surveying, construction works), Transportation (fleet management, road tolling) and many others. ${\bullet}$ New Mass-market applications based on cheap and simple GNSS receivers providing accurate (meterlevel) solutions for daily personal navigation and information needs. Being on top of this evolving market requires an active participation on the key elements that drive the GNSS development. Early access to the new GNSS signals and services and appropriate testing facilities are critical to be able to reach a good market position in time before the next evolution, and this is usually accessible only to the large system developers as the US, Europe or Japan. Jumping into this league of GNSS developers requires a large investment and a significant development of technology, which may not be at range for all regions of the world. Bearing in mind this situation, MAGIC appears as a concept initiated by a small region within Europe with the purpose of fostering and supporting the development of advanced applications for the new services that can be enabled by the advent of SBAS systems and GALILEO. MAGIC is a low cost platform based on the application of technology developed within the EGNOS project (the SBAS system in Europe), which encompasses the capacity of providing real time EGNOS and, in the near future, GALILEO-like integrity services. MAGIC is designed to be a testing platform for safety of life and liability critical applications, as well as a provider of operational services for the transport or professional sectors in its region of application. This paper will present in detail the MAGIC concept, the status of development of the system within the Madrid region in Spain, the results of the first on-field demonstrations and the immediate plans for deployment and expansion into a complete SBAS+GALILEO regional augmentation system.

  • PDF

Experimental Study on the Performance Improvement of Velcro Reinforcement through Internal Filling (내부충진을 통한 벨크로 보강재의 성능향상에 대한 실험적 연구)

  • Jeong, Yeong-Seok;Kwon, Minho;Kim, Jin-Sup;Nam, Gwang-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.347-355
    • /
    • 2021
  • During the earthquake, for multi-story structure, if the first floor is soft, the deformation will concentrate on that floor causing a serious damage to the column members which might leads to the collapse of the whole structure like Piloti structure during the Pohang earthquake in Korea. According to the 2016 National Disaster Management Research Institute's "Investigation of Seismic Reinforcement and Cost Analysis of Domestic Non-seismic Buildings", the rate of seismic resistance of private reinforced concrete buildings was 38.3 %. Among them, it was reported that the seismic-resistance ratio of the two to five-story structures was less than 50 %. Accordingly, the government is trying to improve the seismic rate through support projects, but the conventional seismic reinforcement methods are still expensive, and emergency construction is difficult. Therefore, in this study, the field applicability was evaluated by improving the reinforcement method using Velcro, which was developed through the research project of the Ministry of Land, Transport and Maritime Affairs in 2014. In order to improve the performance of the Velcro reinforcement method, introducing the initial tension of Velcro using high foaming rigid urethane filling between the Velcro and concrete of the columns was applied. Additionally, an experiment was conducted to evaluate the ductility of Velcro specimen from the concrete confinement effect. As a result, the ductility of the Velcro specimen was improved compare to Normal specimen. However, the energy dissipation capacity of VELCRO2 is better than VELCRO1, yet the maximum ductility of those two specimens did not show a significant difference. Therefore, the improvement of the internal filler material is still needed to have a better maximum ductility.