Application of Big Data and Machine-learning (ML) Technology to Mitigate Contractor's Design Risks for Engineering, Procurement, and Construction (EPC) Projects

  • Choi, Seong-Jun;Choi, So-Won;Park, Min-Ji;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.823-830
    • /
    • 2022
  • The risk of project execution increases due to the enlargement and complexity of Engineering, Procurement, and Construction (EPC) plant projects. In the fourth industrial revolution era, there is an increasing need to utilize a large amount of data generated during project execution. The design is a key element for the success of the EPC plant project. Although the design cost is about 5% of the total EPC project cost, it is a critical process that affects the entire subsequent process, such as construction, installation, and operation & maintenance (O&M). This study aims to develop a system using machine-learning (ML) techniques to predict risks and support decision-making based on big data generated in an EPC project's design and construction stages. As a result, three main modules were developed: (M1) the design cost estimation module, (M2) the design error check module, and (M3) the change order forecasting module. M1 estimated design cost based on project data such as contract amount, construction period, total design cost, and man-hour (M/H). M2 and M3 are applications for predicting the severity of schedule delay and cost over-run due to design errors and change orders through unstructured text data extracted from engineering documents. A validation test was performed through a case study to verify the model applied to each module. It is expected to improve the risk response capability of EPC contractors in the design and construction stage through this study.

  • PDF

사업관리 관점의 FEED 업무 프로세스 구조 및 항목 평가 - 화력발전소를 중심으로 - (Assessment of FEED Structure and Functions for Project Management of Thermal Power Plant Construction)

  • 김남준;정영수;양명덕
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.65-76
    • /
    • 2015
  • 해외 플랜트 사업에서의 고부가가치를 창출하기 위해서는 기획 타당성조사, 프로젝트종합관리, FEED 및 기본설계 등 분야의 기술경쟁력 강화가 시급하다. 특히, FEED 업무는 프로젝트 전체에 대한 영향력이 절대적이고, 또한 기자재 및 패키지 산업의 경쟁력 강화에도 결정적 역할을 한다. 그럼에도 불구하고, FEED 관련 선행연구들은 설계업무 중심의 프로세스 및 성과물을 위한 연구가 대부분이며, 프로젝트 전체에 영향을 미치는 관리적 관점의 FEED 업무에 대한 연구는 미흡한 실정이다. 따라서 본 연구에서는 발전플랜트 중 화력발전소를 대상으로 사업관리 관점의 FEED 업무 프로세스 구조 및 항목을 제안하였다. 도출된 FEED 관리 업무는 3개의 레벨로 나누어진 계층적 구조를 가지고 있으며, 업무 항목에 대한 전문가 검증을 실시하였다. 또한 FEED 관리 업무에 대한 평가지표별 평가를 통해 결과를 분석한 결과 설계 중심의 업무들은 역량이 높지만 중요도가 높은 관리적 관점의 FEED 업무들의 역량은 부족한 것으로 나타났다. 그러므로 본 연구에서 제안한 FEED 관리업무 프로세스 구조는 FEED 역량 강화를 위한 가이드라인이 될 것이라 기대한다.

미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점 (U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication)

  • 장철기
    • 한국콘텐츠학회논문지
    • /
    • 제20권2호
    • /
    • pp.215-225
    • /
    • 2020
  • 국내 공공건설사업에서 건설기술용역 발주 및 입·낙찰 과정은 공정성과 투명성이 강조되어 계량적 항목 위주로 업체를 선정하는 방법을 주로 적용하여왔다. 이로 인해 업체의 기술경쟁력을 강화하고자 하는 동기부여가 미흡하였고, 기술력을 기반으로 하는 업체선정방식의 필요성은 지속적으로 제기되어 왔다. 본 연구에서는 미국 공공건설사업에서의 건설기술용역 서비스 발주 및 입·낙찰 관련 미국 정부의 방침, 제반 절차 및 규정 등을 관련법 및 관련시스템을 통해 분석하고, 국내 공공건설공사에서의 건설기술용역 발주 및 입·낙찰 및 나아가 계약관리 및 사후관리에 있어서 공정하고 효율적인 건설기술용역 관리에 시사 하는 바를 도출하였다. 주요 시사점으로는 자격요건 및 역량 기반의 업체 선정, 제출 서류의 단순화, 발주자의 역할 및 책임 강조, 중소업체에 대한 배려, 탈락자에 대한 배려, 사후평가 등의 측면에서 국내 건설기술용역 발주 및 입·낙찰에 고려될 수 있을 것으로 기대된다.

A QUANTITATIVE APPROACH FOR ASSESSING THE OVERSEAS BUSINESS CAPABILITIES OF CONSTRUCTION FIRMS

  • Hae Beom Yang;Woosik Jang;Kang-Wook Lee;Heedae Park;Seung Heon. Han;Hyun-woo You
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.308-314
    • /
    • 2013
  • Although global construction spending has experienced slow growth due to consecutive economic crises, global contractors have consistently attempted to expand their overseas market share, leading to more intense competition among contractors in the international construction market. In this market environment, owners, clients and financial institutions require reasonable and systematic criteria to effectively assess the business capabilities of international construction firms. However, the existing evaluation methods for construction firms rarely consider overseas-focused business capabilities. To address this problem, this study proposes a quantitative approach to assessing the overseas business capabilities of international construction firms. The limitations of existing approaches are reviewed, and the capabilities required to perform overseas businesses are analyzed through expert interviews. Finally, 18 evaluation indices are suggested in four categories: technology resources, project management, experience and performance, and sustainability. The relative weight of each index is determined according to the Analytical Hierarchy Process (AHP) method, and a preliminary investigation of 11 Korean construction firms is conducted. The proposed method is expected that it will provide the rational criteria for international owners, clients, and financial institutions for decision-making and for evaluating international contractors.

  • PDF

Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc;Le-Hoai, Long;Lee, Young-Dai
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.30-39
    • /
    • 2012
  • Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

BTL사업의 사업수행 절차 분석에 관한 연구 (On Analysis of Undertaking Accomplishment Process for the BTL Project)

  • 전진구;임종아;박용대
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.917-920
    • /
    • 2007
  • 우리나라의 민간투자 사업은 잦은 제도변경으로 많은 혼란을 격고 있지만, 2005년 1월 사회기반시설의 민간투자법 개정으로 공공서비스시설을 대중에게 제공할 수 있는 새로운 민간투자방식은 BTL(Build Transfer Lease)이 국내건설시장에 도입되었다. BTL사업은 계획에서 유지관리까지 사업의 수명주기 전 과정을 대상으로 포괄적 형태의 사업을 수행하는 것으로 사업자의 역할과 수행능력에 따라 사업의 성패가 좌우 된다. 따라서, 본 연구에서는 효율적인 BTL사업의 추진에 필요한 명확한 시스템 기준을 분석하여 사업수행의 정확성을 검증할 수 있는데 그 목적이 있다.

  • PDF

안전을 고려한 건설사업관리용역업자(CM) 사업수행능력 평가기준 요인 도출 연구 (A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Construction Management) Considering Safety)

  • 김도수;김백중;신윤석
    • 한국건축시공학회지
    • /
    • 제19권6호
    • /
    • pp.557-566
    • /
    • 2019
  • 건설업은 국내 산업 중 안전사고가 가장 많이 발생한다. 건설업의 재해는 막대한 재산손실과 인명피해로 인한 사회적 문제로 이어지기 때문에 더 각별한 주의를 기울여야 한다. 최근 이로 인해 건설업에서 발생하는 재해에 대한 경각심이 높아지고 있으며 정부 각 부처에서는 안전관리에 관한 규정을 강화하고 있다. 특히 산업안전보건공단에서는 이번 산업안전보건법 전부개정안에서 보호대상의 확대와 책임 소재의 명확화에 중점을 두고 있다. 이에 따라 발주자 책임강화에 따른 건설사업관리자 선정 시 안전을 고려하는 요인 중심으로 분석한 연구가 필요한 실정이다. 따라서 본 연구에서는 먼저, 성장하고 있는 건설사업관리 시장에 비해 증가하고 있는 건설재해에 대한 저감 대책 중 하나인 산업안전보건법 전부개정법률을 참고하였고, 다양한 건설사업의 특성과 안전 요인을 고려하지 않은 획일화된 건설사업관리용역업자 사업수행능력 평가기준을 개선하기 위해, 발주자의 입장에서 건설사업관리자를 선정할 때 안전에 대한 항목을 참고할 수 있도록 관련 요인을 도출하고 중요도를 분석해 새로운 평가의 기준점을 제시하고자 한다. 이를 위해 법령, 국내 논문 및 문헌, 해외 사례 등을 바탕으로 기존 연구와 문헌을 고찰하고, 전문가 면담을 통해 항목을 선정하였다. 선정된 항목은 4가지 상위요인 그룹으로 분류하여 총 19가지의 하위요인으로 정리하여 공공기관 및 민간사업 잘주처 관계자 및 건설사업관리업 종사자, 안전관리자에게 쌍대비교설문을 실시하였다. 수집된 설문조사 결과 데이터를 바탕으로 계층 분석적 방법인 AHP기법을 활용하여 상대적 중요도를 비교하고 우선순위를 분석해 최종적으로 안전을 고려한 건설사업관리 사업수행능력 평가기준에 필요한 요인을 도출하였다. 본 연구의 결과가 발주자 입장에서 건설사업관리자를 선정함에 있어 안전관리 요인을 고려할 수 있도록 도움이 되고 건설 산업 전체의 재해 저감에 기여할 수 있는 기초적인 자료로 활용되기를 기대한다.

IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구 (A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis)

  • 김승범;변정윤;김주형;김재준
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.103-112
    • /
    • 2014
  • 최근 건설 프로젝트 규모의 대형화, 복잡화로 인해 관리기술의 난이도가 상승하고 있으며, 이에 따른 리스크도 함께 증가하고 있어 프로젝트 관리기술 향상에 대한 필요성이 증가하고 있다. 이 같은 문제점을 해결하기 위하여 건설공사에서 우선적으로 건설사업관리(Construction Management)제도를 도입하였으나 국내 건설 산업의 경우 업역별 분리발주가 이루어지고 있어 프로젝트 전반에 걸쳐 건설사업관리제도의 기능이 제대로 작동되지 않고 있는 실정이다. 이 같은 부분적 사업관리제도의 운영은 향후 스마트그리드, 인텔리전트 빌딩 등과 같은 융 복합화 사업에 있어 많은 제약을 받을 수 있다. 국내 건설 프로젝트 관리기술의 향상을 위해서는 현 사업관리제도의 이질성을 극복할 수 있는 업역별 사업관리기술 역량을 확보하고, 협업 능력 저해 요소를 발견하여 이를 해결해야 한다. 이에 본 연구에서는 IPA모델을 활용하여 건설 전기공사의 사업관리제도 업무역량 차이를 분석하고, 프로젝트의 효율적인 운영을 위한 전기공사 사업관리제도 도입 방안을 모색하고자 한다.

건설기술자의 원가관리 업무역량 분석 연구 (An Analysis of Core Competency of Construction Field Engineer for Cost Management)

  • 최재홍;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.26-34
    • /
    • 2013
  • 최근 많은 기업들이 개개인의 인적자원을 기업 가치 창출의 핵심 자산으로 인식하고, 기업 경쟁력 강화를 위하여 역량기반의 인적자원관리 및 인재육성에 많은 노력을 기울이고 있다. 국내 건설업에서 큰 비중을 차지하고 있는 종합건설회사의 건설기술자는 건설 프로젝트 생애주기의 각 단계에서 다양한 참여주체와 함께 공사관리 업무를 수행하며, 건설기술자의 역량은 건설공사의 성패에 직접적인 영향을 미치는 중요한 요소이다. 하지만 현재 국내의 건설기술자 능력 평가 방식은 자격 위주의 평가로서 실제 공사관리 업무에 대한 소화능력과는 거리가 있다. 이와 같은 관점에서 본 연구는 건설업의 기본관리 항목 중 하나인 원가관리의 업무 프로세스 및 세부 수행항목을 분석하여 원가관리 업무 숙련도 수준을 제시하였고, 이를 바탕으로 건설기술자 직급별 요구역량 대비 현 수준 분석 및 업무 단계별 건설기술자 업무역량 분석을 실시하여 시사점을 도출하였다.

프로젝트금융으로 인한 우발채무가 건설기업의 재무상태에 미치는 영향 (Effects of the contingent liabilities caused by project financing on financial status of the Korean construction firms)

  • 강남희;김현중;최재현
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.84-91
    • /
    • 2015
  • 프로젝트 파이낸싱(Project Financing, 이하PF)은 자금조달을 위한 금융기법 중 하나로 사업주의 신용도나 다른 담보 대신 프로젝트의 수익성에 기초하여 투자자로부터 자금을 제공 받는다. 하지만 국내에서 이루어지는 PF의 경우, 자금 조달의 주체인 금융기관은 사업 타당성 검증체계가 부족하여 프로젝트의 사업성을 평가하기보다 건설사에게 신용보강을 요구하며, 이에 따라 사업주의 대출채권에 건설사가 연대보증 또는 채무인수약정을 하고 있는 실정이다. 이로 인해 건설사는 PF 우발채무라는 간접적인 채무가 발생하게 되고, 이는 재무제표에 포함되지 않으나 2009년 PF 우발채무 기재의 공시기준 제정됨에 따라 주요 관리 항목이라 할 수 있다. 본 연구는 PF 우발채무가 기업의 재무상태에 미치는 영향을 분석하기 위하여 신용등급 및 도급순위 별로 건설사를 분류하여 PF 우발채무가 기업의 주요 재무비율인 유동성, 안정성, 수익성에 미치는 영향을 분석하였다.