• Title/Summary/Keyword: construction progress monitoring

Search Result 62, Processing Time 0.028 seconds

Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan (아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례)

  • Jeong, Dong-Ho;Kim, Woo-Sun;Kim, Gee-Baek;Jeong, Won-Joon;Lee, Seung-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

A real-time construction management of a tunnel using position tracking sensor (위치추적 센서를 이용한 터널의 실시간 시공관리)

  • Lee, Kang-Hyun;Kim, Dae-Won;Mun, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.133-148
    • /
    • 2011
  • Construction sites are becoming larger and complex with the growth of national economy. Accordingly, it is important to identify real-time information about materials, equipments, and manpower during construction at sites. Even though research utilizing position tracking sensors has been conducted in architectural engineering fields, this area of research is almost nil in civil engineering fields. Therefore, a feasibility study to find a way to apply position tracking sensors to an in-situ tunnel construction site adopting conventional tunnelling method is performed in this study. A methodology is proposed that the progress management of the tunnelling work can be monitored by checking construction materials needed at job site and the safety management system can be assessed by checking distance between in-situ workers and construction equipments. The most representative materials were identified so that IT technology can be applied by attaching and monitoring sensors to the selected materials. Also, time of arrival (TOA) for a position determination technology along with a wireless network technology was chosen and build wireless network system. The adopted methodology was applied to an in-situ tunnelling site, and verified the usefulness of the proposed system.

Prediction of Ground-Condition Ahead of the Tunnel Face by Using 3-Dimensional Absolute Displacements (3차원 절대내공변위를 이용한 터널 막장전방의 지반면화 예측기법)

  • Lee, In-Mo;Gang, Gi-Don;Park, Gwang-Jun
    • Geotechnical Engineering
    • /
    • v.14 no.4
    • /
    • pp.17-32
    • /
    • 1998
  • has been much progress in theories and construction techniques to secure the stability of the underground structures. Recently, several studios have shown that it is possible to predict the existence of discontinuities ahead of a tunnel face by analyzing 3-dimensional absolute displacements measured during tunnel excavation. This paper concentrated on the development of a methodology to predict the existence and location of the discontinuities, or the void space(abandoned mine) , by performing 3-dimensional FEM analysis and considering the stress relocation caused by arching effect during excavation. Also, this study tried to verify deformation for choosing the most suitable support system. The results of this study might provide a way of safer and economical tunnel construction by utilizing the in-situ monitoring data.

  • PDF

Analyses of Existing Tunnel Liner Behaviors Caused by Excavation of Upper Layer with Using Laser Scanning Technology (레이저 스캐닝 기술을 이용한 기존 터널 상부굴착에 따른 라이닝 거동 분석)

  • Park, Tae-Soo;Lee, Seung-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.10
    • /
    • pp.29-36
    • /
    • 2015
  • This paper deals with inspecting and monitoring cracks developed on a subway tunnel liner during the construction of temporary supports and excavation. The cracks have developed near a enlarged part of the tunnel. Several measurements, crack gauge, internal displacement measurement, 3-D laser scanner have been conducted to monitor the progress of cracks and effects of them on the tunnel. Local measurement, additional propagation of cracks and deformation of liner, have been conducted by crack gauge and internal displacement measurement. Global inspection has been conducted by 3-D laser scanner. From the scanned data, occurrence of global deformation of tunnel and rail has been evaluated. Because of limited sequence of construction at the ground, no apparent deformation of crack propagation has been measured. As presented in this paper, deformation of tunnel liner and effects of rail need to be investigated in view of local and global aspects.

MCU Module Design for Smart Farm Sensor Processing (스마트팜 센서 처리용 MCU 모듈 설계)

  • Kim, Gwan-hyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.285-286
    • /
    • 2021
  • With the recent development of Internet of Things (IoT) technology, smartization technology is expanding to the fields of agriculture, livestock, and fisheries, and smartization is in progress. In this smart technology, the most important thing is how to measure the data in the field and transmit it to the management system. Currently, the sensors used in the construction of smart farms and other livestock houses and farms are measuring and monitoring smart farms and other environmental conditions through various sensors such as temperature, humidity, CO gas, CO2, hydrogen, and O2. The communication method between these sensors and the HMI (Human Machine Interface) module that controls and manages the smart farm is still mainly using the RS-485-based modbus-RTU method. In this paper, we intend to design the MCU module for HMI so that various sensor modules can be connected to manage data through the RS-485-based Modbus method so that the sensor data required for smart farm construction can be managed by the HMI module.

  • PDF

Monitoring Vegetation Changes after Constructing the Vegetation-mat Measures for Greening in Embankment - A Case Study of Tancheon, Seongnam - (호안 녹화용 매트 시공 후 식생변화 모니터링 - 성남시 탄천을 중심으로 -)

  • Lee, Soo-Dong;Kang, Hyun-Kyung;Jang, Han-Sol
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.302-317
    • /
    • 2010
  • In this study, not only to present the management plan but also to verify the effectiveness for a area of improving the landscape and the area of creating the base of bio-inhabitation in Tancheon stream concrete embankment where were practised the vegetation-mat measures for greening via monitoring i.e. restoration progress. The results of monitoring, there were a total of 41 taxa, 18 families, 38 species, 3 varieties in 2006, moreover in the 2007, there were a total of 59 taxa, 19 families, 56 species, 3 varieties and in the period 2008, 64 taxa, 29 families, 59 species, 8 varieties. Therefore, these site has increased the plant spaces year by year. The distribution of vegetation characteristics shows that Miscanthus sacchariflorus and Pennisetum alopecuroides expands their influence in the area of applying the construction method. Those area appears a diversity of native species by the stream deposition at the flood. Thus, its condition is very soundly ecological health and eco-friend. At present, native species have been dominant, however, disturbed species and invasive species can be expected to increase dramatically in the future. Therefore, it is necessary to a long-range monitoring and management for maintaining an environmentally sound aquatic ecosystem. On this area refer to mix the river vegetation of primary succession and disturbed vegetation. For that reason, the method of constructing the vegetation-mat measures for greening in embankment does not need to remove the concrete and can install a coir-mat on the top. It leads to improve the landscape, moreover, it was analysed the such dramatic changes in the vegetation species richness by providing continuous the plant growth basis have a impact on in bio-diversity.

Monitoring of Concrete Deterioration Caused by Steel Corrosion using Electrochemical Impedance Spectroscopy(EIS) (EIS를 활용한 철근 부식에 따른 콘크리트 손상 모니터링)

  • Woo, Seong-Yeop;Kim, Je-Kyoung;Yee, Jurng-Jae;Kee, Seong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.651-662
    • /
    • 2022
  • The electrochemical impedance spectroscopy(EIS) method was used to evaluate the concrete deterioration process related to chloride-induced steel corrosion with various corrosion levels(initiation, rust propagation and acceleration periods). The impressed current technique, with four total current levels of 0C, 13C, 65C and 130C, was used to accelerate steel corrosion in concrete cylinder samples with w/c ratio of 0.4, 0.5, and 0.6, immersed in a 0.5M NaCl solution. A series of EIS measurements was performed to monitor concrete deterioration during the accelerated corrosion test in this study. Some critical parameters of the equivalent circuit were obtained through the EIS analysis. It was observed that the charge transfer resistance(Rc) dropped sharply as the impressed current increased from 0C to 13C, indicating a value of approximately 10kΩcm2. However, the sensitivity of Rc significantly decreased when the impressed current was further increased from 13C to 130C after corrosion of steel had been initiated. Meanwhile, the double-layer capacitance value(Cdl) linearly increased from 50×10-6μF/cm2 to 250×10-6μF/cm2 as the impressed current in creased from 0C to 130C. The results in this study showed that monitoring Cdl is an effective measurement parameter for evaluating the progress of internal concrete damages(de-bonding between steel and concrete, micro-cracks, and surface-breaking cracks) induced by steel corrosion. The findings of this study provide a fundamental basis for developing an embedded sensor and signal interpretation method for monitoring concrete deterioration due to steel corrosion at various corrosion levels.

Behavior of Fill Dam Subjected to Continuous Water Level Change and Overflow (지속적 수위변동 및 월류에 따른 저수지 제체의 거동 연구)

  • Lee, Chungwon;Maeng, Youngsu;Kim, Yongseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.41-48
    • /
    • 2014
  • In this study, the behavior of fill dam with continuous water level change considering velocity changes via centrifugal model test was investigated. In addition, the collapse of fill dam due to the overflow was also experimentally simulated. The experimental results demonstrate that the pore water pressures and displacements vary in proportion to the water-level-change velocity, and the displacement increment is independent to the water-level-change velocity. Also, it is confirmed that the continuous water level change induces to the progress of fill-dam deformation due to displacement accumulation and the fill-dam stability dramatically degrades owing to the overflow. Hence, the real-time monitoring of pore water pressures and displacements of fill dam, and the control of water level in heavy rain through the countermeasure such as opening sluice gates are needed to ensure the stability of fill dam.

Comparison of long-term behavior between prestressed concrete and corrugated steel web bridges

  • Zhan, Yulin;Liu, Fang;Ma, Zhongguo John;Zhang, Zhiqiang;Duan, Zengqiang;Song, Ruinian
    • Steel and Composite Structures
    • /
    • v.30 no.6
    • /
    • pp.535-550
    • /
    • 2019
  • Prestressed concrete (PC) bridges using corrugated steel webbing have emerged as one of the most promising forms of steel-concrete composite bridge. However, their long-term behavior is not well understood, especially in the case of large-span bridges. In order to study the time-dependent performance, a large three-span PC bridge with corrugated steel webbing was compared to a similar conventional PC bridge to examine their respective time-dependent characteristics. In addition, a three-dimensional finite element method with step-by-step time integration that takes into account cantilever construction procedures was used to predict long-term behaviors such as deflection, stress distribution and prestressing loss. These predictions were based upon four well-established empirical creep prediction models. PC bridges with a corrugated steel web were observed to have a better long-term performance relative to conventional PC bridges. In particular, it is noted that the pre-cambering for PC bridges with a corrugated steel web could be smaller than that of conventional PC bridges. The ratio of side-to-mid span has great influence on the long-term deformation of PC bridges with a corrugated steel web, and it is suggested that the design value should be between 0.4 and 0.6. However, the different creep prediction models still showed a weak homogeneity, thus, the further experimental research and the development of health monitoring systems are required to further progress our understanding of the long-term behavior of PC bridges with corrugated steel webbing.

Seasonal Sedimentary Characteristics and Depositional Environments after the Construction of seawall on the Iwon Macrotidal Flat (방조제 건설 후 이원 대조차 조간대의 계절별 퇴적학적 특성 및 퇴적환경)

  • Kum, Byung-Cheol;Park, Eun-Young;Lee, Hi-Il;Oh, Jae-Kyung;Shin, Dong-Hyeok
    • Journal of the Korean earth science society
    • /
    • v.25 no.7
    • /
    • pp.615-628
    • /
    • 2004
  • In order to elucidate seasonal sedimentary characteristics and depositional environment after construction of seawall on macrotidal flat, a seasonal observations of surface sediments (total 450) and sedimentation rates on 4 transects have been investigated for 2 years. The eastern area of Iwon tidal flat, has been changed from semi-closed coast to open coast by construction of seawall, shows general seasonal changes similar to characteristics of open coast type, which represented both fining and bad sorted distribution due to deposition of fine sediments under low energy condition in the summer, and relatively coarser and better sorted distribution because of erosion of fine sediments in the winter. In considering angles of transects, distribution patterns of surface sediments, the northern and southern parts of eastern tidal flat are dominantly influenced by wave and tidal effects, respectively. As time goes by, the eastern tidal flat shows coarsening-trend of surface sediments caused by direct effect of tidal current, were and typhoon. Meanwhile the western area of seawall, which has been re-formed by construction seawall, is sheltered from northwesterly seasonal wind. The seasonal change pattern of western area of seawall is slightly different from that of eastern tidal flat. Mean grain size and sorting of surface sediments during spring is finer and worse than those during summer. This seasonal change pattern maybe influenced by topographic effects caused from the construction of seawall. In consideration of all result, the transport of fine sediments in the study area, which is supplied to limited sediments, shows clockwise circulation pattern that fine sediments are transported from the eastern tidal flat to the western area of seawall because of blocking of seawall in the winter and are transported reversed direction the summer. As a result, many changes have been observed in the study area after construction of seawall; however, this change is still in progress and is expected to need continuous monitoring.