Korean Journal of Construction Engineering and Management
/
v.13
no.6
/
pp.107-120
/
2012
This study is conducted so as to understand actual condition of financial difficulties confronted by construction companies in the recession of real estate market which has been continued since the financial crisis started from USA in the second half of 2008, and provide fundamental data for the establishment of policy direction. Compared with this actual condition survey with a 2008 investigation, it seems that the practice of financial institutions or credit evaluation relating parts among sections, which were pointed as problems in such investigation, are resolved to some extent. It seems that there are many causes to aggravate financial conditions as pointed at this time and such causes are related to self-problems, which are inherent to the construction business, such as the smooth settlement of construction payment, the securement of new construction projects, the limitation according to the risk inherent to the construction business, and the industry vision, etc.
Journal of Construction Engineering and Project Management
/
v.9
no.4
/
pp.1-15
/
2019
Since its adoption by the transportation sector in the early 1990s, partnering has been broadly used with the traditional delivery method by many agencies with significant reported benefits. During the same era, a number of transportation agencies (DOTs) started experimenting with a wide variety of alternative project delivery methods (APDMs) aimed at improving the delivery of highway construction projects. The effect of collaborative working strategies such as partnering, together with the APDMs have become somehow interrelated posing a potential challenge on how to effectively integrate partnering as a concept in the APDMs. The salient question has been if the collaborative nature of these APDMs has affected how partnering is being used by state DOTs. Through an extensive literature review, analysis of 32 CMGC RFPs/RFQs and review of three CMGC case studies, the study found that there is limited information in state DOT documents that show procedures on the usage of partnering with CMGC projects. Majority of DOTs are relying on the inherent nature of the CMGC contract to promote healthy collaborative practices and there is the need to consider partnering during preconstruction and construction separately to cater for any personnel change over. The study also revealed that partnering may become less important at the construction phase due to overlap between partnering and CMGC practices. In support of this finding, a CMGC partnering model was developed that can be adopted by DOTs. This paper contributes to both research and practice by expanding the existing knowledge on partnering on APDMs.
As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
Founding himself on 'The Principle of Self-making' that is the instrument of 'the natural construction' and accomplishing the various interdisciplinary researches, Frei Otto could explicate the fundamental structure of life that is able to make visible the self-making processes in the nature, the technique and the architecture. It is the flexible pneumatic construction that is grounded on the fibrous organization. This was a milestone not only for him who wanted to put the idea of the new architectural form into practice, but also for the contemporary architecture that faces on the style-pluralistic disorientedness. The architectural form of the natural construction includes in itself three constitutional sub-ideas. One of them is 'the adaptable architecture', which is inclined to the architecture similar to the organization of human body, and the other 'the light architecture' that is in the pursuit of the optimal form through the minimal material. The last one is 'the ecological architecture' that aims to realize the optimal dwelling environment based on the effective energy consumption by accumulating knowledges of the always fluid and unstable nature. With these architectural ideas Frei Otto could develop a new architectural form language 'the light architecture of the natural construction'. This study is purposed to explain the various experiments that were made by his team and the basic principles of the structural dynamics of 'the architecture of the natural construction' and then to analyze the structures that were built on the ground of those principles.
Journal of the Korea Institute of Building Construction
/
v.10
no.6
/
pp.27-38
/
2010
Considering the similarity in legislation and long-term industrial trend of Korea and Japan, continuous attention to the Japanese situation is useful for the development of a domestic construction strategy. In order to compare the current on-site construction management practice of the two countries and analyze the reasons for discrepancy, a literature review, expert interview, and site investigation were executed. A detailed survey of experts with experience in both countries revealed that overall, Korea's level of competitiveness is gaining on that of Japan. However, the Japanese construction industry was still evaluated as maintaining higher competitiveness, due mainly to comprehensive planning for operation, well-established design documents, and effective total quality safety environment management, all of which are combined with institutional support and a cooperative attitude by labor. Adjustments should be made for advanced technologies considering the attributes of a typical Japanese construction prior to establishing and implementing application strategies according to the suggestion of experts. Based on the results of this study, a benchmarking of Japanese strength should be conducted, and this is eventually expected to contribute to establishing green construction, enhancing safety, improving culture, and reinforcing the capabilities of participants.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.10
/
pp.6379-6387
/
2014
Standardized construction information classification enables extensive information from the construction industry to be shared and exchanged clearly by means of unified information expression. Recently, the constriction information classification in North America and Europe has been revised to adapt to BIM technology and applied to various BIM projects. In Korea, government established construction information classification and made efforts to be standardized. On the other hand, it showed low applicability at the practice field and had no revision plan for adapting BIM. In this study, the authors suggest an improvement plan of construction information classification for applying BIM with the purpose of availability enhancement and adaption to a construction environment change.
Korean Journal of Construction Engineering and Management
/
v.23
no.4
/
pp.65-77
/
2022
Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.4D
/
pp.553-560
/
2008
As it was developed to korea standard of the CAD Drawing in Construction CALS/EC for the productivity Improvement in Construction Industry and efficiency rising of construction management. it is high time to design the standard system in water resources. The purpose of this study is to establish the strategies for standard system of drawing information in water Resources parts for construction CALS/EC. This study is to analyse the existing construction drawing standards including CMS, CMMS, drawing guideline of a water Resources public institution, ISO, US National CAD Standard, Japanese Standard. As a result of the analysis, this study proposes the prime structure of the water Resources drawing information standard to support construction CALS/EC. For the establishment of standard system in real practice, this study establishes the numbering system to joint the current standard system for a water Resources order institution and to keep construction CALS/EC. In conclusion, the standard system of drawing information is proposed as a fundamental frame to water Resources parts of construction CALS/EC.
Shahaboddin Hashemi Toroghi;Tang-Hung. Nguyen;Jin-Lee. Kim
International conference on construction engineering and project management
/
2013.01a
/
pp.437-443
/
2013
Recently, sustainable building design, a growing field within architectural design, has been emerged in the construction industry as the practice of designing, constructing, and operating facilities in such a manner that their environmental impact, which has become a great concern of construction professionals, can be minimized. A number of different green rating systems have been developed to help assess that a building project is designed and built using strategies intended to minimize or eliminate its impact on the environment. In the United States, the widely accepted national standards for sustainable building design are known as the LEED (Leadership in Energy and Environmental Design) Green Building Rating System. The assessment of sustainability using the LEED green rating system is a challenging and time-consuming work due to its complicated process. In effect, the LEED green rating system awards points for satisfying specified green building criteria into five major categories: sustainable sites, water efficiency, energy and atmosphere, materials and resources, and indoor environmental quality; and sustainability of a project is rated by accumulating scores (100 points maximum) from these five major categories. The sustainability rating process could be accelerated and facilitated by using computer technology such as BIM (Building Information Modeling), an innovative new approach to building design, engineering, and construction management that has been widely used in the construction industry. BIM is defined as a model-based technology linked with a database of project information, which can be accessed, manipulated, and retrieved for construction estimating, scheduling, project management, as well as sustainability rating. This paper will present a framework representing the building knowledge contained in the LEED green building criteria. The proposed building knowledge framework will be implemented into a BIM platform (e.g. Autodesk Revit Architecture) in which sustainability rating of a building design can be automatically performed. The development of the automated sustainability rating system and the results of its implementation will be discussed.
Korean Journal of Construction Engineering and Management
/
v.25
no.5
/
pp.55-62
/
2024
The purpose of this study is to analyze the effectiveness and necessity of improvement for the currently implemented education and training in order to cultivate and secure excellent construction engineers of domestic construction companies, and to suggest future improvement measures. The conclusions obtained through this study are as follows. The overall satisfaction of construction engineers at the construction site was high, and it was found to be effective in improving job skills, but the educational content, educational methods, and educational environment need to be improved. In order to improve the educational content, it is urgent to introduce a practical-oriented educational curriculum to respond to technological development. In order to increase the educational effect of online education methods, it is very important to develop excellent educational content. In order to improve the educational environment, it is necessary to expand customized practice spaces, establish educational facilities by region, and operate shuttle buses.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.