• Title/Summary/Keyword: construction operation monitoring

Search Result 200, Processing Time 0.04 seconds

전력회사 관점의 배전계통 경제형 PQM 시스템 구축방안 (A Study on the Economical PQMS of the Utility Distribution Power System)

  • 박용업;이건행
    • 전기학회논문지
    • /
    • 제59권9호
    • /
    • pp.1523-1529
    • /
    • 2010
  • This paper describes the distribution power system econimical PQMS(Power quality monitoring system) of Utility. Recently, the korea power quality standard has been established based on the IEC Std. By IEC Std., the power quality assessment point is measured in PCC(Point of common coupling). In this case, the utility has to construct PQM system in all customer PCC point and the PQ meter cost would be very high in order to acquire the suitable data. Also the distribution system would be encounter the communication overload problem due to the huge data. Accordingly the utilities could not apply to PQM system in the distribution power system by the cost and communication problem. In this paper, the proposed economical PQMS has the voltage and current signal reiteration function and FFT operation function is transferred the server. Also the voltage and current measurement channels are minimized by a classified substation construction.

교육기관 지능형 수배전반의 구성방식과 현황분석 (Construction form and status analysis of intelligent type switching board of educational institution)

  • 최인호
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 춘계학술대회 논문집
    • /
    • pp.393-396
    • /
    • 2007
  • Recently one level higher intelligent switching board than established one by the application of intelligent building and digital system are being constructed. Therefore facility's high efficiency, high degree satisfaction, miniaturaization, standardization through application of communication technology and monitoring and controlling by computer system utilized by web-basis power control system and electric IT are practiced. Especially network must be constructed through unified IBS server that monitors every educational institute's switching boards in real time control system. And I intend to create methods to save energy and raise electricity quality by power demand prediction and remote-controled management and operation. In this thesis I intend to suggest measures of forming unified system through researching educational institute's ways of constructing switching board and status analysis and overcoming technical difficulties in user's side and saving and maintenance expense.

  • PDF

배전자동화용 보호협조프로그램 개선 (The upgrade of coordination program for distribution automation system)

  • 설일호;하복남;박신열;정영범;이상호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.629-631
    • /
    • 2005
  • The DASPRO (Protection Coordination Program for DAS) is one of the application programs for Distribution Automation System (DAS) of the KEPCO. Application programs developed by KEPCO provide optimal operation in distribution network. The DASPRO includes diverse functions to operate network as construction of database using existing information. creation of diagram for protection coordination. calculation of fault current. evaluation network. power quality monitoring, etc. The DASPRO can examine validity of setting values for protective devices by comparing to T-C curves. Unless the protection coordination is correct, the most suitable setting value for protection devices are displayed on the screen. In this paper, I will introduce the contents of the DASPRO.

  • PDF

크레인 관리시스템의 모니터링 정보에 관한 연구 (A Study on Monitoring Information of The Grane Management System)

  • 배민성;이영구;박창현;배종일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1481-1482
    • /
    • 2015
  • This paper is aimed to handle quick work for all the workers and to improve the productivity by adding more effective content in Crane Management System(CMS). The basic of rapid service is the improvement of productivity, the information of operation as to the productivity of crane for the quick handling within yard and especially the informations of breakdown and to handle breakdown as soon as possible has a great effect on the increase of productivity.

  • PDF

The effect of cathodic protection system by means of zinc sacrificial anode on pier in Korea

  • Jeong, Jin-A;Jin, Chung-Kuk
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제38권10호
    • /
    • pp.1206-1211
    • /
    • 2014
  • This study has been conducted to confirm the effect of sacrificial anode cathodic protection system for 90 days to protect corrosion on pier that is located in Korea. The cathodically protected structure was a slab and a pile cap. Before the construction of cathodic protection system, the macrography was carried out. As a result of the macrography, many corrosion traces were confirmed in this structure. The trace was mainly focused on joint and zones that concrete cover was eliminated. To apply the cathodic protection system, many onsite techniques have been adopted. In addition, to confirm the inner state of steel in concrete properly, a corrosion monitoring sensor (DMS-100, Conclinic Co. Ltd) has been applied. Test factors were corrosion & cathodic protection potential, 4 hour depolarization potential, resistivity and current density. After 90 days from the installation of cathodic protection system, it could confirm that proper corrosion protection effect was obtained by considering the result of tests.

유압실린더 힘 제어계의 인-프로세스 서보밸브 마모진단에 관한 연구 (In-Process Diagnosis of Servovalve wear in Hydraulic Force Control Systems)

  • 김성동;전세형;장영배
    • 유공압시스템학회논문집
    • /
    • 제6권2호
    • /
    • pp.22-30
    • /
    • 2009
  • An in-process method of diagnosing the spool wear of hydraulic servovalves was explored. The diagnostic method discussed in this paper is for force-control hydraulic servo systems. The key principle used is that pressure sensitivity of a servovalve drops as the valve spool wears out so that it is possible to determine the spool condition by monitoring pressure sensitivity. A diagnostic algorithm was developed and evaluated through numerical simulation and experiments. Two major steps of diagnosis are the evaluation of null bias of the servovalve and the approximation of pressure sensitivity, both of which could be successfully done during normal operation of a servo system. The difference between a new servovalve and a worn valve could be clearly detected in-process, and the diagnostic test was found to be repeatable.

  • PDF

Groundwater Productivity and Rehabilitation of Radial Collector Wells for Agriculture near Okseong Underground Dam

  • Jeon, Hang-Tak;Hamm, Se-Yeong;Hong, Soun-Ouk;Lee, Sang Yong;Kim, Hyoung-Soo
    • 한국지구과학회지
    • /
    • 제41권4호
    • /
    • pp.381-390
    • /
    • 2020
  • When a radial collector well is installed and operated for agricultural purposes, negative impacts may be observed over time due to the clogging of horizontal arms, such as reduced groundwater discharge and water quality deterioration. When radial collector well No. 2 was rehabilitated using the high-pressure impulse generation technique, the specific capacity and transmissivity were increased by 43.1 and 100.6%, respectively. In contrast, according to air surging, the specific capacity and transmissivity increased by 33.8 and 85.8%, respectively, compared to the initial rate before rehabilitation. During the operation of radial collector wells since construction, the time of well rehabilitation can be effectively determined by continuously monitoring the groundwater level and pumping rate of the radial collector wells, thereby preventing a decrease in productivity.

소수력 발전소의 무인화 구축 설계 (The Remote Control System Design of Small Hydropower Plants)

  • 이경배;김영태;백두현;이은웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 B
    • /
    • pp.950-952
    • /
    • 2004
  • The developments of small hydropower plants in korea have been delayed by rising construction cost/low feasibility, local people's disagreement even though the capacity of water resources are enough. However, the recent raising of electricity purchasing price, the government's enlarging plan of small hydropower plants caused the newly development to be accelerated. In this paper, the design of remote control of small hydropower plants are proposed for better economy and easy control. The operation and monitoring of power plants are planned based on One(1)-man control from the central control room of regional area water works/ operating station and engineering station multipurpose dam offices with the equipments of OS, RTU(PLC), KT leased lines, WMPS, CSU and etc.

  • PDF

위성기반 보강항법시스템 기술 동향 (Technology Trends of Satellite Based Augmentation Systems)

  • 김정래;김용래;김종윤
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제13권1호
    • /
    • pp.25-34
    • /
    • 2024
  • The Satellite Based Augmentation System (SBAS) improves the accuracy and reliability of user positioning by transmitting the error correction and integrity information of the global navigation satellite system signal from geostationary satellites in real time. For this reason, SBAS was designed for aircraft operations and approach procedures and is now in operational or development stages in many countries. Time has passed since the construction of SBAS and many changes have occurred in the composition of the monitoring stations and the geostationary satellites. These changes have been investigated and the current operation and development status of SBAS globally are surveyed. The development and test schedules for the transition to dual frequency multi-constellation, an important topic in SBAS, are discussed.

설문조사를 통한 연안개량안강망어업의 조업 실태 및 어선 구조 개선에 관한 의견 분석 (Analysis of the operation status and opinion on the improvement of fishing vessel structure in coastal improved stow net fishery by the questionnaire survey)

  • 장호영;김민선;황보규;오종철
    • 수산해양기술연구
    • /
    • 제57권4호
    • /
    • pp.316-333
    • /
    • 2021
  • In order to understand basic data for improving the fishing system and fishing vessel structure in coastal improved stow net fishery, a questionnaire survey and on-site hearing were conducted from May 10 to June 11, 2019 to analyze opinions on the improvement of operation status and fishing vessel structure. The questionnaire survey consisted of ten questions on the operation status of coastal improved stow net fishery and six questions on the improvement of fishing vessel structure, and the results of each question were analyzed by the region, the captain's age, the captain's career and the age of fishing vessel. As a result of analyzing opinions on the operation status of the coastal improved stow net fishery, it was found that the average time required for casting net was 32.8 to 33.0 minutes and that the average time required for hauling net was 41.0 to 42.2 minutes which took 10 to 12 minutes more than for casting net. The most important work requiring improvement during fishing operation (the first priority) were 'hauling net operation,' 'readjustment and storage of fishing gear,' and 'fish handling' and the hardest factor in fishing management were in the order of 'reduction of catch,' 'labor shortage' and 'rising labor costs.' The most institutional improvement that is most needed in coastal improved stow net fishery was an 'using fine mesh nets.' Most of the respondent to the questions on the experience in hiring foreign crews was 'either hiring or willing to hire foreign crews,' and the average number of foreign crews employed was found to be 2.3 to 2.4 persons. The most important reason for hiring (or considering employment) foreign crews was 'high labor costs.' The degree of communication with foreign crews during fishing operation were 'moderate' or 'difficult to direct work.' The most important problem in hiring foreign crews (the first priority) was an 'illegal departure.' As the survey results on the opinion of structural improvement of coastal improved stow net fishing vessel, the degree of satisfaction with fishing vessel structure related to fishing operation was found to be somewhat unsatisfactory, with an average of 3.3 points on a five-point scale. The inconvenient structure of fishing vessel in possession (the first priority), the space needed most for the construction of new fishing vessel (the first priority) and the space considered important for the construction of new fishing vessel (the first prioprity) was a 'fish warehouse.' The most preferred equipment for the construction of new fishing vessel were 'engine operation monitoring' and 'navigation safety devices.' The average size (tonnage class), the average horse power and the average total length of fishing vessel for proper profit and safety fishing operation was between 13.8 and 14.0 tonnes, 808.3 to 819.5 H.P. and 23.4 to 23.5 meters, respectively. The results of the operation status of coastal improved stow net fishery and the requirement for improving the fishing vessel structure are expected to be provided as basic data for reference when we build or improve the fishing vessel.